July 13, 2006 LICENSEE:
FirstEnergy Nuclear Operating Company FACILITY:
Perry Nuclear Power Plant, Unit 1
SUBJECT:
SUMMARY
OF THE JULY 11, 2006, PUBLIC EXIT MEETING TO DISCUSS THE RESULTS OF THE NRCS CONFIRMATORY ACTION LETTER (CAL)
FOLLOWUP INSPECTIONS IN THE HUMAN PERFORMANCE AND EMERGENCY PREPAREDNESS AREAS On July 11, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Quail Hollow Resort in Painesville, Ohio. The meeting was between NRC Region III and FirstEnergy Nuclear Operating Company (FENOC) management to discuss the results of the NRCs CAL followup inspections in the areas of Human Performance Action Item Implementation and Emergency Preparedness Action Item Implementation and Effectiveness.
The meeting notice, NRC presentation, and licensee presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML061930118, ML061930406, and ML061930397, respectively. A list of principal NRC and licensee meeting participants can be found in the attached Enclosure.
The NRC began the meeting with a review of Perrys performance since entering the Multiple/Repetitive Degraded Cornerstone column of the NRCs Action Matrix. This was followed by an overview of the CAL and a brief summary of the results of previous CAL followup inspection activities. The results of the NRCs inspections of the actions implemented by the licensee to address issues in the Human Performance and Emergency Preparedness areas were then discussed. As part of this public exit meeting, FENOC responded to the NRCs assessment and discussed the progress of improvement efforts at Perry. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and FENOC representatives.
/RA/
Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58
Enclosure:
As Stated See Attached Distribution
DOCUMENT NAME:E:\\Filenet\\ML061940338.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RRuiz:dtp*ERD for EDuncan DATE 07/13/06 07/13/06 OFFICIAL RECORD COPY
FirstEnergy Nuclear Operating Company cc w/encl:
G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC L. Pearce, Vice President - FENOC J. Rinckel, Vice President, Fleet Oversight Director, Site Operations Director, Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health
FirstEnergy Nuclear Operating Company ADAMS Distribution:
DXC1 SJC4 RidsNrrDirsIrib GEG KGO RJP DRPIII DRSIII PLB1 TXN
Enclosure Principal Meeting Participants NRC M. Satorius, Division Director, DRP, RIII E. Duncan, Branch Chief, DRP, RIII M. Franke, Senior Resident Inspector, Perry M. Wilk, Resident Inspector, Perry S. Campbell, Project Manager, NRR FirstEnergy Nuclear Operating Company L. Pearce, Site Vice President F. von Ahn, Director, Site Operations A. Cayai, Director, Performance Improvement J. Shaw, Director, Engineering M. Wayland, Director, Maintenance G. Halnon, Director, Performance Improvement Initiative