Category:Environmental Report
MONTHYEARML23086A0902023-03-24024 March 2023 Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations GAR-2020-02842 ML15014A4102015-01-0606 January 2015 Report of Impingement of Shortnose Sturgeon ML14154A2862014-05-0101 May 2014 Report of Impingement of Shortnose Sturgeon ML14133A5822014-05-0101 May 2014 Report of Impingement of Atlantic Sturgeon ML14133A5812014-05-0101 May 2014 Report of Impingment of Atlantic Sturgeon ML14107A0712014-04-10010 April 2014 Report of Impingement of Shortnose Sturgeon ML14107A0702014-04-10010 April 2014 Report of Impingement of Shortnose Sturgeon ML14078A0792014-03-18018 March 2014 2013 Annual Environmental Operating Report LR-N14-0078, Salem Generating Station, Units 1 and 2 - 2013 Annual Environmental Operating Report2014-03-18018 March 2014 Salem Generating Station, Units 1 and 2 - 2013 Annual Environmental Operating Report ML14085A4172014-03-18018 March 2014 Report of Impingement of Atlantic Sturgeon LR-N14-0042, SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-35 Through Page 2-552014-03-12012 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-35 Through Page 2-55 ML14071A3322014-03-12012 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-35 Through Page 2-55 ML14086A4522014-03-10010 March 2014 Report of Impingement of Atlantic Sturgeon ML14086A4532014-03-10010 March 2014 Report of Impingement of Atlantic Sturgeon LR-N14-0042, SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 1-8 Through Page 2-52014-03-0707 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 1-8 Through Page 2-5 LR-N14-0042, SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Cover Through Page 1-42014-03-0707 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Cover Through Page 1-4 LR-N14-0042, SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 1-5 Through Page 1-72014-03-0707 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 1-5 Through Page 1-7 LR-N14-0042, SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-56 Through Page 2-932014-03-0707 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-56 Through Page 2-93 LR-N14-0042, SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-6 Through Page 2-172014-03-0707 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-6 Through Page 2-17 LR-N14-0042, SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-18 Through Page 2-342014-03-0707 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-18 Through Page 2-34 LR-N14-0042, SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-94 Through Page 2-982014-03-0707 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-94 Through Page 2-98 LR-N14-0042, SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-99 Through End2014-03-0707 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-99 Through End ML14071A4032014-03-0707 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 1-5 Through Page 1-7 ML14071A4022014-03-0707 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Cover Through Page 1-4 ML14071A4002014-03-0707 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 1-8 Through Page 2-5 ML14071A3362014-03-0707 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-94 Through Page 2-98 ML14071A3352014-03-0707 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-56 Through Page 2-93 ML14071A3332014-03-0707 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-18 Through Page 2-34 ML14071A3312014-03-0707 March 2014 SL-012270, Revision 0, Salem Generating Station Flood Hazard Reevaluation, Page 2-6 Through Page 2-17 ML14034A2462014-01-23023 January 2014 Report of Impingement of Atlantic Sturgeon ML14034A2452014-01-23023 January 2014 Report of Impingement of Atlantic Sturgeon ML13336A6902013-11-20020 November 2013 Report of Impingement of Atlantic Sturgeon LR-N13-0096, Report of Impingement of Atlantic Sturgeon2013-04-18018 April 2013 Report of Impingement of Atlantic Sturgeon LR-N13-0095, Report of Impingement of Atlantic Sturgeon2013-04-18018 April 2013 Report of Impingement of Atlantic Sturgeon LR-N13-0085, Annual Environmental Operating Report2013-04-17017 April 2013 Annual Environmental Operating Report ML13100A1942013-03-29029 March 2013 Report of Impingement of Atlantic Sturgeon ML13100A2132013-03-29029 March 2013 Report of Impingement of Atlantic Sturgeon ML13100A2122013-03-29029 March 2013 Report of Impingement of Atlantic Sturgeon ML13100A2112013-03-29029 March 2013 Report of Impingement of Atlantic Sturgeon ML13100A2102013-03-29029 March 2013 Report of Impingement of Atlantic Sturgeon ML13045A9012013-01-30030 January 2013 Report of Impingement of Atlantic Sturgeon ML13045A8992013-01-30030 January 2013 Report of Impingement of Shortnose Sturgeon ML12192A2472012-02-23023 February 2012 Quarterly Remedial Action Progress Report, Third Quarter 2011, Figure 2 Groundwater Tritium Results ML12192A2482012-02-23023 February 2012 Quarterly Remedial Action Progress Report, Third Quarter 2011, Figure 3 Wells Beyond the Plume Area ML12192A1952012-02-23023 February 2012 Quarterly Remedial Action Progress Report, Third Quarter 2011 PSEG Nuclear, LLC; Created by Arcadis ML1023503152010-10-21021 October 2010 Issuance of the Environmental Scoping Summary Report for the Staff'S Review of the License Renewal Application for Salem Nuclear Generating Station, Units 1 and 2, and Hope Creek Generating Station ML11263A0312010-09-23023 September 2010 E-mail with Attachment from T. Ghosh, NRR, to L. Perkins, NRR Et Al, on Salem/Hope Creek Chapter 5 ML11263A0212010-09-0303 September 2010 E-mail with Attachment from A. Imboden, NRR, to L. Perkins, NRR, on Salem and Hope Creek Aquatic Ecology Sections with Comments and Edits ML1014402792010-04-29029 April 2010 Salem, Units 1 & 2 and Hope Creek, Unit 1 - Response to NRC Request for Additional Information Dated 04/16/2010 Related to the Environmental Review, License Renewal Application, Ecology, Chapter 7: Marsh Restoration Project, Fish Assemblage ML1014402802010-04-29029 April 2010 Salem, Units 1 & 2 and Hope Creek, Unit 1 - Response to NRC Request for Additional Information Dated 04/16/2010 Related to the Environmental Review, License Renewal Application, Ecology, Question # ECO-7 2023-03-24
[Table view] Category:Letter
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) IR 05000272/20244032024-09-25025 September 2024 And Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location 2024-09-25
[Table view] |