Previous Commitment Regarding License Amendment Request to Increase Voltage Limit for Emergency Diesel Generator Load Rejection Surveillance Test
ML061870388
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/27/2006
From: Peifer M
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:6381-04
Download: ML061870388 (4)


Text

Indiana Michigan Power INDIANA Cook Nuclear Plant MICHIGAN POWER" One Cook Place Bridgman, MI 49106 AERcom A unit of American Electric Power June 27, 2006 AEP:NRC:6381-04 10 CFR 50.91(a)(5)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-PI-17 Washington, DC 20555-0001

SUBJECT:

Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Docket Nos. 50-315 and 50-316 Previous Commitment Regarding License Amendment Request to Increase Voltage Limit for Emergency Diesel Generator Load Rejection Surveillance Test

References:

1. Letter from J. N. Jensen, Indiana Michigan Power Company (I&M) to U. S.

Nuclear: Regulatory Commission (NRC) Document Control Desk, "License Amendment Request to Increase Voltage Limit for Emergency Diesel Generator Load Rejection Surveillance Test," dated April 10, 2006 (ML061080660).

2. Letter from D. P Fadel, I&M, to U.S. NRC Document Control Desk, "Supplement to License Amendment Request to Increase Voltage Limit for Emergency Diesel Generator Load Rejection Surveillance Test," dated April 12, 2006 (ML061240382).
3. Letter from D. P Fadel, I&M, to U. S. NRC Document Control Desk, "Second Supplement to License Amendment Request to Increase Voltage Limit for Emergency Diesel Generator Load Rejection Surveillance Test," dated April 13, 2006 (ML061230511).
4. Letter from J. N. Jensen, I&M, to U. S. NRC Document Control Desk, "Commitment Regarding License Amendment Request to Increase Voltage Limit for Emergency Diesel Generator Load Rejection Surveillance Test," dated April 13, 2006 (ML061150354).

6 0o

U. S. Nuclear Regulatory Commission AEP:NRC:6381-04 Page 2

5. Letter from K. Feintuch, NRC, to M. K. Nazar, I&M, "Donald C. Cook Nuclear Plant, Unit 2 (DCCNP-2) - Issuance of Amendment Under Emergency Circumstances Regarding Diesel Generator Voltage Limit Requirements (TAC No. MD1131), dated April 13, 2006 (ML061010512).

Dear Sir or Madam:

Tihis letter documents completion of a previous commitment as requested by the Nuclear Regulatory Commission (NRC) staff and addresses an additional NRC request regarding a license amendment for Donald C. Cook Nuclear Plant (CNP), Unit 1 and Unit 2.

By Reference 1, Indiana Michigan Power Company (I&M) proposed to amend Facility Operating Licenses DPR-58 and DPR-74 for CNP. I&M proposed to increase the voltage limit for the emergency diesel generator (DG) full load rejection Technical Specification (TS) Surveillance Requirement (SR). The proposed amendment was requested on an emergency basis for Unit 2, pursuant to 10 CFR 50.91(a)(5). The proposed amendment was not requested on an emergency basis for Unit 1. References 2 and 3 provided supplemental information regarding the proposed amendment. Reference 4 provided a regulatory commitment regarding the proposed amendment as requested by the NRC staff. In Reference 4, I&M committed to perform all TS SRs that challenge the operation of the Unit 2 AB DG voltage regulator prior to Unit 2 entering Mode 3 during the refueling outage that was in progress at the time of the submittal. Reference 5 transmitted the approved amendment for Unit 2. I&M performed the testing as committed in Reference 4 prior to Unit 2 entering Mode 3. Unit 2 has since returned to full power operation.

The NRC staff has requested that I&M document the testing performed to satisfy the commitment made in Reference 4. The testing performed included all TS SR testing that challenged the operation of the Unit 2 AB DG voltage regulator. The following TS SRs were successfully completed on the Unit 2 AB DG following replacement of the voltage regulator, prior to Unit 2 entering Mode 3 during the Spring 2006 refueling outage:

SR 3.8.1.2 SR 3.8.1.11 SR 3.8.1.3 SR 3.8.1.15 SR 3.8.1.8 SR 3.8.1.16 SR 3.8.1.10 SR 3.8.1.19 SRs 3.8.1.12 and 3.6.1.13 were not performed because, with respect to challenging the voltage regulator, they are enveloped by SR 3.8.1.19. SR 3.8.1.22 was not performed because, with respect to challenging the voltage regulator, it is enveloped by SR 3.8.1.8.

I -

U. S. Nuclear Regulatory Commission AEP:NRC:6381-04 Page 3 The NRC staff has also asked if I&M is replacing all the voltage regulators on the Unit 1 DGs. If so, I&M was requested to address the testing of these replacement regulators. I&M does not intend to replace any voltage regulators on the Unit 1 DGs during the upcoming Fall 2006 refueling outage.

The information provided in this letter consists of clarifying information for the amendment request previously submitted by Reference 1. The information in this letter does not alter the validity of the original evaluation of significant hazards considerations performed in accordance with 10 CFR 50.92, and documented in Enclosure 2 to Reference 1. The environmental assessment provided in Enclosure 2 to Reference 1 also remains valid.

The enclosure to this letter provides an affirmation affidavit pertaining to the supplemental information. This letter contains no new regulatory commitments. Copies of this letter and its enclosures are being transmitted to the Michigan Public Service Commission and Michigan Department of Environmental Quality, in accordance with the requirements of 10 CFR 50.91.

Should you have any questions, please contact Ms. Susan D. Simpson, Regulatory Affairs Manager, at (269) 466-2428.

ark A. Peif Site Vice President JRW/rdw

Enclosure:

Affirmation.

c: J. L. Caldwell, NRC Region III K. D. Curry, AEP Ft. Wayne J. T. King, MPSC MDEQ - WHMD/RPMWS NRC Resident Inspector P. S. Tam, NRC Washington, DC

I, Enclosure to AEP:NRC:6381-04 AFFIRMATION I, Mark A. Peifer, being duly sworn, state that I am Site Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this letter with the Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.

Indiana Michigan Power Company Mark A. Peif~r Site Vice President SWORN TO AND SUBSCRIBED BEFORE ME THIS D*- DAY OP JLL , 2006 Notary Publ'c REGAN D.WENDZEL CxNory Pub~ic, E3rnrcn County, MI My Commission Expires, , c,. , 2009