ML061860471

From kanterella
Jump to navigation Jump to search
Transmittal of Surry ISFSI Final Safety Analysis Report, Revision 17
ML061860471
Person / Time
Site: Surry, 07200002  Dominion icon.png
Issue date: 06/28/2006
From: Grecheck E
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML061860467 List:
References
06-467
Download: ML061860471 (3)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261*

June 28, 2006 United States Nuclear Regulatory Commission Serial No.: 06-467 Attention: Document Control Desk NCM/RPC Washington, DC 20555-0001 Docket No.: 72-2 License No.: SNM-2501 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

SURRY INDEPENDENT SPENT FUEL STORAGE INSTALLATION FINAL SAFETY ANALYSIS REPORT REVISION 17 Pursuant to 10 CFR 72.70, Dominion submits Revision 17 to the Final Safety Analysis Report (FSAR) for the Surry Independent Spent Fuel Storage Installation (ISFSI).

One CD-ROM is included in this submittal. The CD-ROM is labeled "Surry ISFSI, Final Safety Analysis Report Revision 17, Docket No. 72-2, June 2006" and contains the following file:

001 Surry ISFSI SAR.pdf 34,070,528 bytes, publicly available.

Third-party documents included by reference in the Surry ISFSI Final Safety Analysis Report and contained in this file may not be text searchable.

Should you have any questions regarding this submittal, please contact Mr. Tom Szymanski at (804) 273-3065.

As a duly authorized officer of the Virginia Electric and Power Company, I hereby certify that the information given in the enclosed Revision 17 of the Surry ISFSI FSAR accurately presents changes that were made since the previous submittal.

Very truly yours,

!Eugene S. Grecheck

Vice President - Nuclear Support Services Enclosure Commitments made in this letter: None.

Serial No.: 06-467 Docket No.: 72-2

Subject:

Submittal of SPS ISFSI FSAR Revision 17 Page 2 of 3 COMMONWEALTH OF VIRGINIA )

)

COUNTY OF HENRICO )

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Eugene S. Grecheck, who is Vice President - Nuclear Support Services, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this g2'8" day of . 2006.

My Commission Expires: jz az 3L, oos Notary Public (SEAL)

Serial No.: 06-467 Docket No.: 72-2 Submittal of SPS ISFSI FSAR Revision 17 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission (wI one CD-ROM copy)

Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23 T85 Atlanta, GA 30303-8931 Director, Spent Fuel Project Office (w/ one CD-ROM copy)

Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Ms. Jill Caverly (w/ one CD-ROM copy)

Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. N. P. Garrett (w/ one CD-ROM copy)

NRC Senior Resident Inspector Surry Power Station