GE Infrastructure Energy, Nuclear David W. Turner Manager. Vallecitos Nuclear Center 6705 Vallecitos Rd Sunol, CA 94586 USA ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Monday, June 26th, 2006 T 925 862 4344 F 910 341 2577 davidw.turner@ge.com Subj:
R-33 (NTR) Organization Changes Ref:
(1)
E132f..
(2)
NEDO-32765 Technical Specifications for Ref (1)
Encl:
(1)
Current Implementation of Fig 6-1 of Ref (2)
On January 19th, 2006 1 relieved Scott Bump as the Manger, Vallecitos Nuclear Center.
Effective that date the General Managers of the General Electric divisions represented at VNC designated me the manager responsible for the nuclear safety, industrial safety and environmental compliance for the entire site.
To support this move, Chuck Bassett temporarily was assigned responsibility for the Regulatory Compliance function. Today, Latonya Martin assumes the responsibilities within the referenced license for Regulatory Compliance & EHS.
These positions are detailed in section 6 of Reference (2). Enclosure (1) details the current implementation of Figure 6-1 in Ref 2.
If you have any questions in the above matters, please contact me at the address above, davidw.turner@ge.com, by phone at 925.862.4344 or Tonya Martin at latonya.martin@ge.com or 925.862.4360.
Sincerely yours, Digitally signed by David W. Turner Date: 2006.06.26 13:59:14 -07'00' David W. Turner Manager, Vallecitos Nuclear Center cc Marvin Mendonca, Project Manger Ao~o G"rd OmVic Cwpw DWT-2006-21 Orgnizational Chonges for R-33.doc
Current Implementation of Fig 6-1 of NEDO-32765 Technical Specifications for R-33 Enclosure i to R-33 Organization Changes Page 1 of 1