ML061800368

From kanterella
Jump to navigation Jump to search
Draft - Outlines (Facility Letter Dtd - 02/06/2006) (Folder 2)
ML061800368
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/06/2006
From: Jacobs M
Entergy Nuclear Northeast, Entergy Nuclear Operations
To: Todd Fish
NRC Region 1
Sykes, Marvin D.
References
50-333/06-301, JTRG-06-006 50-333/06-301
Download: ML061800368 (14)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel315 342 3840 February 6,2006 JTRG-06-006 Mr. Todd Fish, NRC Chief Examiner United States Nyclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415

SUBJECT:

LICENSED OPERATOR INITIAL EXAMINATION OUTLINES

Dear Mr. Fish:

In accordance with NUREG-1021 Revision 9, please find the attached Initial License Examination written outline and exam quality checklist that was developed for the SRO only section of the retake exam for Mr. Peter Farsaci. Random sampling for written test items was completed per ES-401 Attachment 1.

The attached mpterials shall be withheld from public disclosure until the examinations are complete.

If you have any questions, please do not hesitate to contact me at (315) 349-6313.

Very truly yours, .

MICHAE~JACOBS TRAINING MANAGER MJ/SWR/sr Attachment CC: USNRC Document Control USNRC Project Manager C. Faison - WPO JAF RMS JAFP File JTRG File

ES-401 1 Form ES-401-1 Facility: J.A. FitzPatrick Date of Exam: April 17 - 21,2006 I RO WA Category Points I SRO-Only Points Notes: 1. Ensure that at least two topics from every WA category are sampled within each tier of the RO and SRO-only outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each WA category shall not be less than two).

2. The point total for each group and tier in the proposed outline must match that specified in the table. The final point total for each group and tier may deviate by il from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.
3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted or justified; operationally important, site-specific systems that are not included on the outline should be added. Refer to ES-401, Attachment 2, for guidance regarding the elimination of inappropriate WA statements.
4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
5. Absent a plant-specific priority, only those WAS having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.
6. Select SRO topics for Tiers 1 and 2 from the shaded systems and K/A categories.

7.* The generic (G) WAS in Tiers 1 and 2 shall be selected from Section 2 of the WA Catalog, but the topics must be relevant to the applicable evolution or system.

8. On the following pages, enter the WA numbers, a brief description of each topic, the topics' importance ratings (IR) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above. Use duplicate pages for RO and SRO-only exams.
9. For Tier 3,select topics from Section 2 of the WA catalog, and enter the WA numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to WAS that are linked to 10 CFR 55.43.

ES-401 2 Form ES-401-1 I BWR Examination Outline Emergency and Abnormal Plant Evolutions - Tier IIGroup 1 (RO ISRO)

Form ES-401-1 lr ES-40 UAPE # I Name / Safety Function A 1

A la1 G

1 KIA Topic(s) 295003 Partial or Complete Loss of AC I 6 A42.04 (10CFR 55.43.5)

Ability to determine and/or interpret the following as they apply to PARTIAL OR COMPLRE LOSS OF A.C. POWER

+ System lineups 3-7 I 295004 Partial or Total Loss of DC Pw I 6 AA2.02 (10CFR 55.43.5)

Ability to determine and/or interpret the following as they apply to PARTIAL OR COMPLETE LOSS OF D.C. POWER 3.9 2

--t 295005 Main Turbine Generator Trip I3

+ Extent of partial or complete loss of D.C. power 62.4.17 (10CFR 55.43.5)

Knowledge of EOP terms and definitions.

/I 295023 Refueling Acc I 8

~~

G2.1.12 (10CFR 55.43 4.0 I 4 295024 High Drywell PressureI 5 Ability to determine and/or interpret the following as they apply to HIGH DRYWELL PRESSURE: 4.1 5

+ Suppression pool temperature 1/30/2006- 1:34:44PM Page 2

\ 7 ES-401 2 Form ES-401-1 ES-401 BWR Examination Outline Form ES-401-1 Emergency and Abnormal Plant Evolutions - Tier 1IGroup 1 (RO I SRO)

HAPE # / Name I Safety Function IR 295025 High Reactor Pressure I 3 Ability to determine and/or interpret the following as they apply to HIGH 3.9 REACTOR PRESSURE:

295031 Reactor Low Water Level I 2 3.4 Knowledge of the process for performing a containment purge.

t WA Category Totals: (RO) NIA K/A Category Totals: (SRO)

- 7 1/30/2006- 1:34:44PM Page 3

7 -

ES-401 3 Form ES-401-1 1I ES-401 BWR Examination Outline Emergency and Abnormal Plant Evolutions - Tier 1lGroup 2 (RO / SRO)

Form ES401-1 295007 High Reactor Pressure / 3 62.1.30 (10CFR 55.43.5) 295008 High Reactor Water Level / 2 AA2.04 (10 CFR 55.43.5)

Ability to determine and/or interpret the following as they apply to HIGH REACTOR WATER LEVEL:

3.3 9

+ Heatup rate: Plant-Specific 295014 Inadvertent Reactivity Addition / 1 AA2.02 (10 CFR 55.43.6)

Ability to determine and/or interpret the following as they apply to INADVERTENT REACWITY ADDITION:

3.9 10

+ Reactor period 1/30/2006- 1:34:44 PM Page 4

ES-401 3 Form ES-401-1 1/30/2006- 1:34:44PM Page 5

7 ES-401 4 Form ES-401-1 I ES-401 BWR Examination Outline Plant Systems -Tier 2IGroup 1 (RO I SRO)

Form ES-401-1 1 System # I Name I: ,

A::? ..... A
  • 3

' 2;:;:;::::

A :... ............

...... WA Topic(s) IR #

I 206000 HPC I Abilitv to analvze the effect of maintenance activities on LCO status.

21 7000 RCIC A2.11 (10CFR 55.43.5)

Ability to (a) predict the impacts of the following on the REACTOR CORE ISOLATION COOLING SYSTEM (RCIC);and (b) based on those predictions, use procedures to correct, control, or mitigate the 3.2 13 consequences of those abnormal conditions or operations:

+ Inadequate system flow 1/30/2006- 1~34% PM Page 6

-\ -

ES-401 4 Form ES-401-1 ES-401 BWR Examination Outline Form ES-401-1 Plant Svstems -Tier ZGrouD 1 1RO I SRO)

I ,I:.:.:I A B..............

'T&;

System # I Name ..........

,x<;;:: WA Topic(s) IR #

239002 SRVs A2.01 (10CFR 55.43.5)

Ability to (a) predict the impacts of the following on the RELIEF /

SAFEP( VALVES; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal 3.3 14 p 1 conditions or operations:

+ Stuck open vacuum breakers 3.4 15 Page 7

7 -

ES-401 5 Form ES-401-1 I BWR Examination Outline Plant Systems -Tier 2Group 2 (RO I SRO)

Form ES-401-1 those abnormal conditions or operations:

BOILER INSTRUMENTATION; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

4 Instrument line leakaae 1/30/2006- 1:34:44 PM Page 8

I

- 2 ES-401 5 Form ES-401-1 ES-401 BWR Examination Outline Form ES-401-1

. 2 (RO Plant Svstems -Tier 2/Group . I SRO) 21 9000 RHRILPCI: TON~POOI A2.12 (10CFR 55.43.5)

Cooling Mode Ability to (a) predict the impacts of the following on the RHR/LPCI:

TORUS / SUPPRESSION POOL COOLING MODE; and (b) based on 3.1 18 those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

+ Valve logic failure: Plant-Specific 1/30/2006- 1:34:44 PM Page 9

5

\ -

Form ES-401-1 ES-401 1

1/30/2006- 1:34:44PM Page 10

ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401-3 Facility: J ./ FitzPatrick Date of Exam: April 17 - 21,2006 I I I I 1 Category KIA# I Topic IR RO I

SRO-Only IR #

tJ3 c

+

0 ea n

.o f'

t

.-n

=I rn W

1/30/2006- 1:33:51 PM Page 11

ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401-3 Facility: J.P FitzPatrick Date of Exam: April 17 - 21,2006 RO SRO-Only Category KIA # Topic IR # IR #

2.4. 62.4.49 (10CFR 55.43.2)

    • Industry OE JAF CA**

Ability to perform without reference to 4.0 25 procedure those actions that require immediate operation of system components and controls.

I Tier 3 Point Total 7 1/30/2006- 1:33:51 PM Page 12

ES-401 Record of Reiected WAS Form ES-4014 Tier I Randomly Reason for Rejection Group Selected WA Random Number Generator hit on a 7for a second time on 111 295026 this draw. This would have resulted in two questions in Suppression Pool High Water Temperature.

All three Tier 1 Group 2 randomly selected as Generic.

Randomly chose one to become an A2 versus G. Random 112 295010 G Number Generator kicked out a 1 which corresponded to the first selection on the page.

Rejected on overlap with 295024 and 295025 - all suppression pool related. Randomly sampled which one of three to revise.

111 295026 Randomly re-sampled category A2 /GI which again yielded A2.

Due to limited A2 selections, rejected 295026 and randomly determined a new RAPE, which yielded 295004.

No identified linkage to 10CFR 55.43, per BWR Exam Outline 3 G2.3.5 (Form ES-401-1) Note 9.

No identified linkage to 10CFR 55.43, per BWR Exam Outline 3 G2.3.7 (Form ES-401-1) Note 9.

No identified linkage to 10CFR 55.43, per BWR Exam Outline 3 (32.1.2 (Form ES-401-1) Note 9.

212 268000 A2.03 Rejected on WA < 2.5 (2.3). No plant-specific priority.

No identified linkage to 10CFR 55.43. Rejected in accordance 11 1 295038 G2.2.12 with ES-401, Attachment 2, WA Elimination Guidance, Note 1.

1/30/2006 - 2:06:00PM Page I