June 29, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION 2006 PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

Dear Mr. Crane:

The purpose of this letter is to inform you that the Quad Cities Nuclear Power Station 2006 problem identification and resolution inspection previously scheduled for October 30 through November 17 will be re-scheduled for November 27 through December 15. The re-scheduling of this inspection was required to address agency staff schedule conflicts. This inspection schedule change was discussed with W. Beck, Quad Cities Regulatory Assurance Manager, on May 11, 2006. Mr. Beck communicated that the inspection schedule change was acceptable.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause any additional changes to the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any questions you may have regarding this inspection schedule change.

Sincerely,

/RA by Christine Lipa Acting for/

Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 DISTRIBUTION See next page

June 29, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION 2006 PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

Dear Mr. Crane:

The purpose of this letter is to inform you that the Quad Cities Nuclear Power Station 2006 problem identification and resolution inspection previously scheduled for October 30 through November 17 will be re-scheduled for November 27 through December 15. The re-scheduling of this inspection was required to address agency staff schedule conflicts. This inspection schedule change was discussed with W. Beck, Quad Cities Regulatory Assurance Manager, on May 11, 2006. Mr. Beck communicated that the inspection schedule change was acceptable.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause any additional changes to the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any questions you may have regarding this inspection schedule change.

Sincerely,

/RA by Christine Lipa Acting for/

Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 DISTRIBUTION See next page DOCUMENT NAME:E:\\Filenet\\ML061800241.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JMcGhee:sls CLipa for MRing DATE 06/29/2006 06/29/2006 OFFICIAL RECORD COPY

C. Crane cc w/encl:

Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager - Quad Cities Nuclear Power Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission D. Tubbs, Manager of Nuclear MidAmerican Energy Company

C. Crane ADAMS Distribution:

DXC1 MXB RidsNrrDirsIrib GEG KGO KKB CAA1 DRPIII DRSIII PLB1 JRK1