Category:Inspection Report
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 IR 05000313/20244042024-04-0808 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000313/2024404 and 05000368/2024404) IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230102023-09-20020 September 2023 – Biennial Problem Identification and Resolution Inspection Report 05000313/2023010 and 05000368/2023010 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000313/20234032023-06-28028 June 2023 – Security Baseline Inspection Report 05000313/2023403 and 05000368/2023403 IR 05000313/20234012023-06-13013 June 2023 – Cyber Security Inspection Report 05000313/2023401 and 05000368/2023401 IR 05000313/20230012023-05-0909 May 2023 Integrated Inspection Report 05000313/2023001 and 05000368/2023001 IR 05000368/20233012023-05-0101 May 2023 NRC Examination Report 05000368/2023301 IR 05000313/20220062023-03-0101 March 2023 Annual Assessment Letter for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2022006 and 05000368/2022006) IR 05000313/20220042023-01-26026 January 2023 Integrated Inspection Report 05000313/2022004 and 05000368/2022004 - 4th Quarter IR 05000313/20220032022-11-0909 November 2022 Integrated Inspection Report 05000313/2022003 and 05000368/2022003 and Exercise of Enforcement Discretion ML22301A1532022-11-0909 November 2022 Notice of Violation NRC Inspection Report 05000313/2022011 and 05000368/2022011 IR 05000313/20220112022-11-0909 November 2022 Notice of Violation NRC Inspection Report 05000313/2022011 and 05000368/2022011 ML22308A1912022-11-0606 November 2022 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000313/2023401 and 05000368/2023401 IR 05000313/20224012022-10-20020 October 2022 Security Baseline Inspection Report 05000313/2022401 and 05000368/2022401 IR 05000313/20220502022-09-26026 September 2022 Special Inspection Reactive Report 05000313 2022050 and 05000368 2022050 Cover Letter Only ML22208A1282022-08-0404 August 2022 (2nd Quarter) Inspection Report 2022 002 IR 05000313/20210132022-05-17017 May 2022 License Renewal Phase 4 Inspection Report 05000313/2021013 IR 05000313/20220012022-05-10010 May 2022 Integrated Inspection Report 05000313/2022001 and 05000368/2022001 IR 05000313/20223012022-03-30030 March 2022 NRC Initial Operator Licensing Operating Test Approval 05000313/2022301 IR 05000313/20220102022-03-14014 March 2022 Triennial Fire Protection Inspection Report 05000313/2022010 and 05000368/2022010 IR 05000313/20210062022-03-0202 March 2022 Annual Assessment Letter for Arkansas Nuclear One, Units 1 & 2 (Report 05000313/2021006 and 05000368/2021006) IR 05000313/20224032022-02-23023 February 2022 Security Baseline Inspection Report 05000313/2022403 and 05000368/2022403 IR 05000313/20210042022-02-0404 February 2022 Integrated Inspection Report 05000313/2021004 and 05000368/2021004 ML22011A0992022-01-14014 January 2022 IR 2021012 EOI CO3 IR 05000313/20210102022-01-13013 January 2022 Biennial Problem Identification and Resolution Inspection Report 05000313/2021010 and 05000368/2021010 IR 05000313/20210032021-11-0505 November 2021 Integrated Inspection Report 05000313/2021003 and 05000368/2021003 IR 05000313/20210112021-09-23023 September 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000313/2021011 and 05000368/2021011 IR 05000313/20214012021-08-10010 August 2021 Security Baseline Inspection Report 05000313/2021401 and 05000368/2021401 IR 05000313/20210022021-08-0909 August 2021 Integrated Inspection Report 05000313/2021002 and 05000368/2021002 IR 05000368/20213012021-05-17017 May 2021 NRC Examination Report 05000368/2021301 IR 05000313/20210012021-05-0606 May 2021 Integrated Inspection Report 05000313/2021001 and 05000368/2021001 ML21095A3162021-04-13013 April 2021 ANO 2021402-Non SGI Rcl IR 05000313/20200062021-03-0303 March 2021 Annual Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2020006 and 05000368/2020006) 2024-09-09
[Table view] Category:Letter type:
MONTHYEAR0CAN102401, Response to Request for Additional Information - Arkansas Nuclear One – Units 1 and 2, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzle2024-10-16016 October 2024 Response to Request for Additional Information - Arkansas Nuclear One – Units 1 and 2, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles 2CAN102401, Cycle 31 Core Operating Limits Report (COLR)2024-10-14014 October 2024 Cycle 31 Core Operating Limits Report (COLR) 1CAN082401, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 1 Thirty-First Refueling Outage (1R312024-08-13013 August 2024 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 1 Thirty-First Refueling Outage (1R31 2CAN072401, Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02)2024-07-19019 July 2024 Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02) 0CAN072401, Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes2024-07-0808 July 2024 Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes 1CAN072401, Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply2024-07-0202 July 2024 Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply 0CAN062403, Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels2024-06-25025 June 2024 Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels 0CAN062402, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-06-0606 June 2024 Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles 0CAN052401, – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 20232024-05-13013 May 2024 – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 2023 1CAN052401, Cycle 32 Core Operating Limits Report2024-05-0404 May 2024 Cycle 32 Core Operating Limits Report 2CAN042403, Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C2024-04-24024 April 2024 Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C 0CAN042402, Annual Occupational Radiation Exposure Report for 20232024-04-23023 April 2024 Annual Occupational Radiation Exposure Report for 2023 0CAN042401, Radioactive Effluent Release Report for the 2023 Calendar Year2024-04-15015 April 2024 Radioactive Effluent Release Report for the 2023 Calendar Year 2CAN042402, Special Report of Non-functional Main Steam Line Radiation Monitor2024-04-11011 April 2024 Special Report of Non-functional Main Steam Line Radiation Monitor 2CAN042401, Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications2024-04-0404 April 2024 Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications 2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2024-08-13
[Table view] |
Text
-Entergy Operations, Inc.
--- t-- 1448 S.FR.333 RusseLlville, AR 72801 Tel 501 858-5000 1CAN060601 June 14, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Steam Generator Tubing Inspection Report Arkansas Nuclear One - Unit I Docket No. 50-313 License No. DPR-51
Dear Sir or Madam:
Arkansas Nuclear One, Unit 1 (ANO-1) Technical Specification (TS) 5.6.7 requires the results of ANO-1 steam generator (SG) tubing inspections to be submitted to the NRC within 180 days after the initial entry into mode 4 following completion of the inspection.
Attached is the Steam Generator Tubing Inspection Report which presents the results from ANO-1's scheduled refueling outage (1R19) baseline inspection of the replacement SGs.
These inspections were conducted during December 2005.
The 1R19 inspection performed on both SGs involved an initial full-length bobbin coil examination of 100%.
Should you have any questions regarding this issue, please contact Mr. Fred Van Buskirk of my staff at (479) 858-3155. This submittal contains no commitments.
Sincerely, DEJ/fpv Attachment AQO0J
1CAN060601 Page 2 cc: Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Drew Holland Mail Stop 0-7 D1 Washington, DC 20555-0001
-S Attachment I I CAN060601 Steam Generator Tubing Pre-Service Inspection Report
' Attachment to Page 1 of 3 1CAN060601 ARKANSAS NUCLEAR ONE, UNIT I STEAM GENERATOR TUBING INSPECTION REPORT I INTRODUCTION Arkansas Nuclear One, Unit 1 (ANO-1) Technical Specification (TS) 5.6.7 requires Entergy Operations to submit a 180 day report to the NRC that presents the details of the steam generator (SG) tubing inspections that were peiformed during the reporting period. The report shall include:
- 1. The scope of inspections performed on each steam generator.
- 2. Active degradation mechanisms found.
- 3. Nondestructive examination techniques utilized for each degradation mechanism.
- 4. Location, orientation (if linear), and measured sizes (if available) of service induced indications.
- 5. Number of tubes plugged during the inspection outage for each active degradation mechanism.
- 6. Total number and percentage of tubes plugged to date.
- 7. The results of condition monitoring, including the results of tube pulls and in-situ testing.
The operating period for this report includes one outage, a refueling inspection (1R1 9) in December 2005 which was the steam generator replacement outage. This report details the result of the baseline inspection performed prior to placing the generators in service.
2 DESIGN The replacement steam generators for ANO-1 are Enhanced Once-Through Steam Generators (EOTSG) manufactured by AREVA. The EOTSG is a straight shell and tube type heat exchanger installed in a vertical position with bottom supports and such emergency supports as required to accommodate normal and accident loads. The tubing consists of Inconel 690 thermally treated tubing that is 5/8" in diameter with a 0.037" wall thickness. The tubes are expanded full depth hydraulically in the tubesheet. There are 15 tube supports that are constructed of stainless steel (SA 240 type 410) and are a broached trefoil-hole design.
3 REPORT REQUIREMENTS 3.1 The scope of inspections performed on each steam generator.
Table 3.1 1R19 Inspection Scope SG "A" Examination Type Inspections Conducted % Scope Extent Tested Bobbin Initial 15595 100 TEC to TEH Bobbin I-Codes 0 N/A N/A X-Probe Full Length 15595 100 TEC to TEH SG "B" Examination Type Inspections Conducted % Scope Expansion Rea'd Bobbin Initial 15597 100 TEC to TEH Bobbin I-Codes 0 N/A N/A X-Probe Full Length 15597 100 TEC to TEH
Attachment to Page 2 of 3 1CAN060601 3.2 Active degradation mechanisms found.
This was the initial baseline inspection prior to operation of the generators.
The only mechanisms identified were fabrication induced. These are listed in Table 3.2.1 for SG "A"and 3.2.2 for SG "B".
TABLE 3.2.1 SG "A" INDICATION LIST FOR 1R19 Item No. Row Tube Percent Location Mechanism Through Wall 1 6 22 N/A LTE +16.54 BLG 2 19 34 N/A 14S+13.05 MBM 3 74 118 N/A LTS + 0.60 BLG Legend:
LTE - Lower Tube End BILG - Bulge 14S - 14th Tube Support Plate MBM - Manufacturing Burnish Mark LTS - Lower Tubesheet TABLE 3.2.2 SG "B" INDICATION LIST FOR 1R19 Item No. Row Tube Percent Location Mechanism Through Wall 1 45 22 N/A LTS +5.22 MBM 2 10 27 N/A 15S+38.79 MBM Legend:
LTS - Lower Tubesheet 15S - 15th Tube Support Plate M13M - Manufacturing Burnish Mark 3.3 Nondestructive examination techniques utilized for each degradation mechanism.
NDE Mechanism Location Probe Detection POD Sizing RMSE Technique ETSS @ 90% CL ETSS (%TW) Uncertainty
(%TW)
MBM/BLG Bobbin 96010.1 0.886@0-4%TW 96010.1 0.92 1.14 Rev. 6 0.848@5-11%TW Rev. 6 Legend:
ETSS - Examination Technique Specification Sheet RMSE - Root Mean Square Error
Attachment to Page 3 of 3 1CAN060601 3.4 Location, orientation (if linear), and measured sizes (if available) of service induced indications.
There were no service induced indications identified.
3.5 Number-of tubes plugged during the inspection outage for each active degradation mechanism.
There were no plugs installed during the baseline inspection. There were 2 tubes plugged as a preventive measure during fabrication in SG "A"due to failed expander tooling. These are listed in Table 3.5.1 Table 3.6.1 Tubes Plugged SG "A" SG "B" Year Outage Installed Cumulative Installed Cumulative 2005 Fabrication 2 2 0 0 2005 Baseline 0 2 0 0 3.6 Total number and percentage of tubes plugged to date.
This information is listed in Table 3.6.1.
Table 3.6.1 Cumulative Plugs and Sleeves in Service SG "A" SG "B" Pre-service Sleeves 0 0 1R19 Sleeves Installed 0 0 Total Sleeves Installed 0 0 Pre-service 1-690 Welded 2 0 1R19 Plugs Installed 0 0 Total Plugged 2 0 Percent Plugged 0.012 % 0.000 %
3.7 The results of condition monitoring, including the results of tube pulls and in-situ testing.
Since this was the baseline inspection, there were no service induced indications identified that would challenge the performance criteria and no in-situ test required. There were a total of five manufacturing induced indications identified. This included three MBMs, 1 bulge and 1 over expansion also characterized as a bulge. The MBMs were. very small and had a bobbin voltage of approximately 0.5 volts each. One of the bulges was identified within the tubesheet and had a bobbin voltage of 3.89 volts. Profilometry was performed and resulted in a change in diameter of 0.0006 inches or 0.6 mils.
The second bulge which would be considered the most limiting was at the top of the tubesheet at the expansion transition on the lower tubesheet.
Profilometry was performed and the result was a change in diameter of 0.0005 inches or 0.5 mils. None of these indications would challenge the structural integrity of the tubing. Therefore, all performance criteria were met so condition monitoring was acceptable. There were no tube pulls performed.