MONTHYEARML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23304A0222023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Braidwood 1 & 2 - Exemption from Security Rule (L-2023-LLE-0030) ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23103A4692023-04-12012 April 2023 NRR E-mail Capture - NRC Acceptance Review of Braidwood Request for Amendment to Revise TS 3.7.9 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0172022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0172021-09-0303 September 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood - License Amendment to Revise Technical Specification 3.7.9, Ultimate Heat Sink ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21154A0162021-06-0202 June 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21123A2442021-05-0303 May 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood/Byron/Ginna - Application to Address the Issues Identified in Westinghouse Documents NSAL-09-5 and NSAL-15-1 (L-2021-LLA-0066) ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML21004A1452020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Relief Requests Braidwood I4R-11 and Byron I4R-18 ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20346A1012020-12-11011 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for an Alternative to Use ASME Code Case N-893 (EPIDs L-2020-LLR-0147 and L-2020-LLR-0148) ML20289A1142020-10-0909 October 2020 NRR E-mail Capture - Preliminary RAIs for LAR Regarding Non-conservative TS EDG Frequency Tolerance ML20266G3032020-09-22022 September 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use Paragraph IWA-5120 of the 2017 Edition of the ASME B&PV Code, Section XI ML20261H4122020-09-11011 September 2020 NRR E-mail Capture - (External_Sender) License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink ML21145A0572020-08-18018 August 2020 NRR E-mail Capture - NRC Acceptance Review for Braidwood Relief Request I4R-11 2023-07-06
[Table view] |
Text
0 i.,L...*,*.s e ;
VUILCI~~~~~~~~ I t*. V 1*... %.W C.
"UW I From: John Cassidy gVol To: Phalen, Martin Date: 2/10/06 3:32PM
Subject:
Emailing: Drop in notes.wpd.
Your files are attached and ready to send with this message.
inflorwlluui inl tdl,, "**u-.*,, Uv.,;¢du inaccordance with the Freedom of Informatiork Act, exemptions - 6 0114ý FOLA- __-_,, __,,'
Mp 4)V Mail Envelope Properties (43ED0673.DEF" 18:*10526)
Subject:
Emailing: Drop in notes.wpd Creation Date: 2/10/06 3:32PM From: John Cassidy Created By: jgc3 @nrc.gov Recipients ch-po.CHDO MJP (Martin Phalen)
Post Office Route ch_po.CHIDO Files Size Date & Time MESSAGE 436 02/10/06 03:32PM Drop in notes.wpd 17793 02/10/06 03:32PM Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard
Braidwood Groundwater Contamination
Background
On November 30, the licensee reported tritium was identified in off-site monitoring wells.
Current sample results have identified levels of tritium as high as 285,000 picocuries per liter in deep wells (25') onsite and offsite. Offsite levels in shallowwells have been identified as high as about 59,000 picocuries per liter (non-drinking water well) and at about 1400 - 1600 picocuries per liter in one residential drinking water well.. Initial sample results (including independent NRC samples of residential wells) have detected levels of tritium consistent with the licensee's results.
On December 16, 2005, the State of Illinois Environmental Protection Agency issued the licensee a Violation Notice for contaminating the groundwater.
Status Liquid radwaste is being stored onsite in temporary storage tanks. Radwaste discharges will not resume until the blowdown line integrity is verified. As part of that inspection, members of the Region III staff observed the licensee's non-destructive evaluation of sections of the blowdown line. The results of that testing are under evaluation.
Although the results of that testing are under evaluation, another offsite vacuum breaker failure occurred on January 15, 2006, releasing non-radioactive water onto the ground.
The licensee has extended its communications of the incidents to additional members of the public. On January, 26, 2006, the licensee issued a letter that has been sent out to the three local zip codes surrounding the site (approximately 2700 addressees). The letter provides the message that has been communicated through the licensee'spress briefings - accepting responsibility for the contamination, stating that the contamination poses no health or safety hazard, and describing the licensee's current course of action. The licensee has also developed a WEB site (www.BraidwoodTritium.info) to provide updated information to the public The licensee is continuing its evaluation of the tritium contamination and its proposals for remediation. Recently, the licensee identified additional contamination in groundwater at an offsite location which is owned by the Forest Preserve District. In one of three groundwater well locations, the licensee measured tritium at about 24,500 picoCuries per liter (shallow well).
NRC split-sample
-licensee's recover.analyses are ongoing, as are NRC ins ection activities to assess the efot adpumi i
~.
Meetings A licensee meeting with nearby residents took place on December 12, 2005, which Region III staff and State officials attended.
On December 20, 2005 and January 23, 2005, members of the Region III staff participated in meetings between and Illinois Environmental Protection Agency and the licensee in Springfield, Illinois, which the licensee discussed the apparent origin of the contamination, its monitoring program and initial characterization, and the its future plans.
Region III and Headquarters staffs (OGC, NRR, OEDO, S On Wednesday, January 25, 2006, Chicago media ran front-page reports of the events at the station, and the licensee conducted a media briefing that *as also reported.
On Thursday, January 26, 2006, Exelon conducted a second meeting with residents living near the Braidwood facility. This meeting was a continuation of the licensee's communication plan with local stakeholders (approximately 25-30 local residents and 2 local news reporters), which was also attended by State regulatory agencies. The topics were the current status of characterizing the tritium contamination,.financial remedies, and remediation plans/progress.
The residents expressed concerns related to potential health effects, to property values, and to the delay in identifying and communicating the 1998 and 2000 leaks. Region III attended the meeting, and limited questions of the NRC were raised.
The City of Godley, which is a town immediately SouthWest of the site, conducted a town meeting on February 7, 2006, to discuss the potential impacts from the tritium contamination.
The town was previously impacted by diesel fuel oil spills from Braidwood that occurred in the late 1990s. The NRC was invited to attend and did paticpate as a panel memeber.
The licensee is planning a "Community Information Night" at some time in February 2006, which Region III plans to attend.