MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARIR 05000250/20240102024-01-0505 January 2024 Focused Engineering Inspection 05000250/2024010 and 05000251/2024010 ML23226A0752023-08-14014 August 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23038A1892023-02-0303 February 2023 RP RFI April 2023 ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS IR 05000250/20234012022-10-19019 October 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000250/2023401 and 05000251/2023401 ML22255A0502022-09-15015 September 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Replace Instrumentation with Digital Systems ML22229A5332022-08-18018 August 2022 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000250 2022402 and 05000251 2022402) ML22181A0562022-06-30030 June 2022 NRR E-mail Capture - Request for Additional Information - Turkey Point U3 Sgtir (L-2022-LRO-0070) ML22081A0292022-03-21021 March 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit No. 3 - Request for Additional Information - Icw Alternative ML22068A2352022-03-17017 March 2022 Licensed Operator Positive Fitness-For-Duty Test ML22074A0932022-03-14014 March 2022 RP RFI March 2022 ML21342A2932021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Requested License Amendment Request Concerning Technical Specification Conversion to NUREG-1431, Revision 5 ML21298A0572021-10-25025 October 2021 NRR E-mail Capture - Final: Tpn Request for Additional Information - Round 2 Concerning Relief Request 10 - Extension EPID: L-2021-LLR-0077 ML21291A1272021-10-14014 October 2021 NRR E-mail Capture - Request for Additional Information - Fifth Ten-Year Inservice Inspection Interval Relief Request No.10 - Extension (L-2021-LLR-0077) ML21270A1652021-09-27027 September 2021 NRR E-mail Capture - Turkey Point Request for Additional Information Concerning Full Spectrum LOCA Methodology - EPID L-2021-LLA-0070 ML21252A2142021-09-0101 September 2021 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 - Request for Additional Information Concerning Relief Requests 8 and 9 ML21238A3282021-08-26026 August 2021 RP RFI October 2020 ML20315A0182020-11-10010 November 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20149K6262020-05-27027 May 2020 NRR E-mail Capture - Turkey Point Unit 4 - Request for Additional Information Concerning 2019 Steam Generator Tube Inspections ML20122A1172020-05-0101 May 2020 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 Request for Additional Information Concerning Emergency Action Level Scheme Change (EPID L-2019-LLA-0271) (FPL: L-2019-203) ML20104B2232020-04-0909 April 2020 NRR E-mail Capture - Action: Turkey Point Unit 3 - Request for Additional Information Concerning Deferral of Steam Generator Inservice Inspections ML20084G5622020-03-20020 March 2020 NRR E-mail Capture - Turkey Point Containment Radiation Monitors Request for Additional Information ML20028C7372019-12-0202 December 2019 Notification of Inspection and Request for Information ML19184A1002019-07-0303 July 2019 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4, Request for Additional Information Regarding License Amendment Request 266 ML19101A3312019-04-11011 April 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 11 (EPID No. L-2018-RNW-0002) - Enclosure ML19087A2112019-03-28028 March 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 10 (EPID No. L-2018-RNW-0002) - Enclosure ML19073A0042019-03-14014 March 2019 Safety RAIs - Set 10 - Draft ML19053A6122019-02-22022 February 2019 Response Date Extension for RAIs Set 8, Revision 1, for the Safety Review of the Turkey Point Subsequent License Renewal Application ML19037A3982019-02-0606 February 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 9 (EPID No. L-2018-RNW-0002) - Enclosure ML19032A3972019-02-0101 February 2019 SLRA Request for Additional Information RAIs 3.5.2.2.2.6 Revision 1 Set 8 Final ML19016A2332019-01-16016 January 2019 NRR E-mail Capture - Request for Additional Information - Turkey Point LAR 265 PRA - NFPA RCP Seals - EPID L-2018-LLA-0280 ML18341A0042019-01-15015 January 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 8 (EPID No. L-2018-RNW-0002) - E-Mail ML18341A0052019-01-15015 January 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 8 (EPID No. L-2018-RNW-0002) - Enclosure ML18348A5852018-12-13013 December 2018 Emergency Preparedness Inspection and Request for Information ML18318A4332018-11-19019 November 2018 Supplemental Information Needed for Acceptance of License Amendment Request to Revise NFPA 805 License Condition for Reactor Coolant Pump Seals ML18292A7462018-10-31031 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 7 (EPID No. L-2018-RNW-0002) - Enclosure ML18269A2282018-10-0404 October 2018 Request for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 6 (EPID No. L-2018-RNW-0002) - Enclosure ML18269A2102018-10-0101 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 4 (EPID L-2018-RNW-0002) - Enclosure ML18243A0072018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 3 (EPID No. L-2018-RNW-0002) - Email ML18243A0062018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 1 ML18259A0002018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 2 ML18248A1592018-09-15015 September 2018 Requests for Additional Information for the Turkey Point Subsequent License Renewal Application - Environmental Set 3 (EPID No. L-2018-LNE-0001) - Email ML18248A1602018-09-15015 September 2018 Requests for Additional Information for the Turkey Point Subsequent License Renewal Application - Environmental Set 3 (EPID No. L-2018-LNE-0001) - Enclosure ML18232A5132018-08-20020 August 2018 SLRA Safety RAIs - Set 2 - RAIs ML18232A5142018-08-20020 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 2 ML18232A5462018-08-20020 August 2018 Safety RAIs - Set 2 - Draft ML18218A2002018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-RNW-0002) - Enclosure 2024-01-05
[Table view] |
Text
June 16, 2006 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
TURKEY POINT PLANT, UNITS 3 AND 4 - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUESTS 1A, 14A AND 15A (TAC NOS. MD0205 AND MD0206)
Dear Mr. Stall:
By letter dated February 20, 2006, Florida Power & Light Company requested relief from certain requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, due to limitations that were identified during the third 10-year inservice inspection interval at Turkey Point Units 3 and 4.
The U.S. Nuclear Regulatory Commission staff has reviewed your requests and finds that a response to the enclosed Request for Additional Information is needed before we can complete the review.
This request was discussed with members of your staff on June 1, and on June 14, 2006, Ms. Stavroula Mihalakea agreed that a response would be provided within 30 days of the date of this letter. If you have any questions, please contact me at (301) 415-3974.
Sincerely,
/RA/
Brendan T. Moroney, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251
Enclosure:
As stated cc w/encl: See next page
June 16, 2006 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
TURKEY POINT PLANT, UNITS 3 AND 4 - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUESTS 1A, 14A AND 15A (TAC NOS. MD0205 AND MD0206)
Dear Mr. Stall:
By letter dated February 20, 2006, Florida Power & Light Company requested relief from certain requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, due to limitations that were identified during the third 10-year inservice inspection interval at Turkey Point Units 3 and 4.
The U.S. Nuclear Regulatory Commission staff has reviewed your requests and finds that a response to the enclosed Request for Additional Information is needed before we can complete the review.
This request was discussed with members of your staff on June 1, and on June 14, 2006, Ms. Stavroula Mihalakea agreed that a response would be provided within 30 days of the date of this letter. If you have any questions, please contact me at (301) 415-3974.
Sincerely,
/RA/
Brendan T. Moroney, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251
Enclosure:
As stated cc w/encl: See next page Distribution:
PUBLIC LPL2-2 R/F RidsNrrPMBMoroney RidsNrrDorlLpl2-2 RidsNrrLABClayton RidsNrrDciCpnb RidsOgcRp RidsRgn2MailCenter RidsAcrsAcnwMailCenter TLupold, NRR ADAMS ACCESSION No.: ML061590235 NRR-088 OFFICE LPL2-2/PM LPL2-2/LA CPNB/BC LPL2-2/BC NAME BMoroney BClayton TChan MMarshall by memo dated DATE 6/14/06 6/14/06 05/30/06 6/16/06 OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION TURKEY POINT UNITS 3 AND 4 RELIEF REQUEST NOS. 1A, 14A, AND 15A DOCKET NOS. 50-250 AND 50-251 General
- 1. Relief Requests 1A, 14A and 15A indicated that the third 10-year inservice inspection (ISI) interval ended February 21, 2004, for Unit 3 and April 14, 2004, for Unit 4. By letter dated October 20, 2004, the NRC authorized extension of the third 10-year interval to February 21, 2005, for Unit 3 and to April 14, 2005, for Unit 4. Please indicate the proper end dates for the Unit 3 and Unit 4 third 10-year ISI intervals.
Relief Request 1A:
- 2. In Florida Power and Light Company (FPL) letter dated February 20, 2006, it is stated the objective of Relief Request 1A is to resubmit the previously approved Relief Request No.1. The request also states that this revision submits the examination volume coverage obtained during the third 10-year ISI interval inspection. In comparing Relief Request 1 with Relief Request 1A, the upper shell-to-flange weld is included in both requests. Welds 3-DO-A, 3-DO-B, 3-DO-C, 4-DO-A, 4-DO-B, 4-DO-C are included in Relief Request 1, but they are not included in relief request 1A. Relief Request 1A contains additional examinations that had limited coverage, welds 3-WR-9 and 4-WR-9 and the 1-inch annular surface of flange surrounding each reactor vessel stud hole.
Does Relief Request 1A supersede Relief Request 1, or is it in addition to Relief Request 1? If Relief Request 1A is to supersede Relief Request 1, was essentially full coverage obtained on welds 3-DO-A, 3-DO-B, 3-DO-C, 4-DO-A, 4-DO-B, 4-DO-C? If Relief Request 1A is to be in addition to Relief Request 1, is the request for relief with regard to welds 3-WR-18 and 4-WR-18 any different than the request for relief made under Relief Request 1 (other than 71-percent coverage was obtained vs. 68-percent projected)?
- 3. Relief Request 1A states that the examination of the Figure1 IWB-2500-12 A-B-C-D-E-F-G-H volume is limited when scanning the carbon steel base material surrounding the stud holes due to the sealing surfaces configuration. Please explain how the sealing surfaces configuration limits access to the required examination volume, and whether any alternate scanning angles can be used to achieve coverage in this area.
Relief Request 14A:
- 4. FPL letter dated February 20, 2006, states the objective of Relief Requests 14A and 15A is to resubmit the previously approved Relief Request 14 and 15 for Class 1 and 2 vessel inside radius, vessel welds, and piping welds that did not receive code-required volume. In comparing Relief Request 14 and Relief Request 14A, there are four components (29"-RCS-1305-3, 8"-SI-2309-22, 8"-SI-2309-24, and 6"-BDA-2301-8) that are listed in Relief Request 14 but not in Relief Request 14A. Please explain why the four components are not included in Relief Request 14A.
- 5. In Relief Request 14, component 3-SRGN-01-IR is listed under examination category B-D, item No. B3.120, which is applicable to the Pressurizer. In Relief Request 14A, component 3-SRGN-01-IR is listed as applicable to examination category B-D, item No. B3.140. Please explain this change in classification of component 3-RGN-01-IR.
- 6. Table 1 identifies the applicable code requirement for component Spray Nozzle-SP 1-IR as examination category B-D, item No. B3.140, which is applicable to steam generators. Please clarify whether this is a pressurizer spray nozzle or if it is applicable to steam generators.
- 7. Table 1 of Relief Request 14A indicates 66-percent coverage from the elbow side for component 31"-RCS-1302-10 was achieved. Relief Request 14 indicates 75-percent coverage from the elbow side for component 31"-RCS-1302-10 was achieved. Please explain the difference in coverage reported between the FPL August 8, 1996, letter and the February 20, 2006, letter.
- 8. Describe any flaws or relevant indications identified adjacent to the areas that could not be examined.
Relief Request 15A:
- 9. Describe any flaws or relevant indications identified adjacent to the areas that could not be examined.
Mr. J. A. Stall TURKEY POINT PLANT Florida Power and Light Company cc:
Mr. William E. Webster Mr. Craig Fugate, Director Vice President, Nuclear Operations Division of Emergency Preparedness Florida Power & Light Company Department of Community Affairs P.O. Box 14000 2740 Centerview Drive Juno Beach, FL 33408-0420 Tallahassee, Florida 32399-2100 Attorney General M. S. Ross, Managing Attorney Department of Legal Affairs Florida Power & Light Company The Capitol P.O. Box 14000 Tallahassee, Florida 32304 Juno Beach, FL 33408-0420 Michael O. Pearce Marjan Mashhadi, Senior Attorney Plant General Manager Florida Power & Light Company Turkey Point Nuclear Plant 801 Pennsylvania Avenue, NW. Florida Power and Light Company Suite 220 9760 SW. 344th Street Washington, DC 20004 Florida City, FL 33035 T. O. Jones, Site Vice President Walter Parker Turkey Point Nuclear Plant Licensing Manager Florida Power and Light Company Turkey Point Nuclear Plant 9760 SW. 344th Street 9760 SW 344th Street Florida City, FL 33035 Florida City, FL 33035 County Manager Mark Warner, Vice President Miami-Dade County Nuclear Operations Support 111 Northwest 1 Street, 29th Floor Florida Power and Light Company Miami, Florida 33128 P.O. Box 14000 Juno Beach, FL 33408-0420 Senior Resident Inspector Turkey Point Nuclear Plant Mr. Rajiv S. Kundalkar U.S. Nuclear Regulatory Commission Vice President - Nuclear Engineering 9762 SW. 344th Street Florida Power & Light Company Florida City, Florida 33035 P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741