June 1, 2006 LICENSEE:

Nuclear Management Company FACILITY:

Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF THE MAY 23, 2006, PUBLIC MEETING TO DISCUSS THE PALISADES NUCLEAR PLANT END-OF-CYCLE PERFORMANCE ASSESSMENT On May 23, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Holiday Inn Express in South Haven, Michigan. The meeting was between NRC Region III management and Nuclear Management Company (NMC) representatives to discuss the NRCs assessment of the Palisades Nuclear Plants safety performance for the period from January 1 through December 31, 2005. The meeting notice can be found in ADAMS as Accession Number ML061140458. A list of meeting participants and the NRC presentation slides can be found in the attached Enclosures.

The NRC began the meeting with an overview of the NRCs Reactor Oversight Process (ROP),

national ROP results, and the Assessment Process in general. This was followed by a discussion of the NRCs assessment of the Palisades Nuclear Plants performance in calendar year 2005, which was documented in the March 2, 2006, end-of-cycle assessment letter recorded in ADAMS as Accession Number ML060610148. The NRC also discussed upcoming inspections and activities at the Palisades Nuclear Plant. As part of this regulatory performance meeting, the NMC responded to the NRCs assessment.

Before adjourning the meeting, the NRC provided the opportunity for members of the public to ask questions. Members of the public posed questions and concerns about dry cask storage, Palisades performance and plant life extension to the NRC. The NRC responded during the meeting and met with individuals after the meeting. The NRC was also interviewed by a local television news organization.

/RA/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-255 License No. DPR-20

Enclosures:

As Stated DISTRIBUTION:

See next page

Nuclear Management Company cc w/encl:

J. Cowan, Executive Vice President and Chief Nuclear Officer R. Fenech, Senior Vice President, Nuclear Fossil and Hydro Operations D. Cooper, Senior Vice President - Group Operations D. Mims, Site Director L. Lahti, Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel and Secretary A. Udrys, Esquire, Consumers Energy Company S. Wawro, Director of Nuclear Assets, Consumers Energy Company Supervisor, Covert Township Office of the Governor L. Brandon, Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division

Nuclear Management Company cc w/encl:

J. Cowan, Executive Vice President and Chief Nuclear Officer R. Fenech, Senior Vice President, Nuclear Fossil and Hydro Operations D. Cooper, Senior Vice President - Group Operations D. Mims, Site Director L. Lahti, Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel and Secretary A. Udrys, Esquire, Consumers Energy Company S. Wawro, Director of Nuclear Assets, Consumers Energy Company Supervisor, Covert Township Office of the Governor L. Brandon, Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division DOCUMENT NAME:E:\\Filenet\\ML061530149.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive

  • See previous concurrence To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME FTran*:sls CLipa DATE 05/31/2006 06/01/2006 OFFICIAL RECORD COPY

Nuclear Management Company ADAMS Distribution:

LMP JLD RidsNrrDirsIrib GEG KGO JBG JAE CAA1 LSL (electronic IRs only)

C. Pederson, DRS (hard copy - IRs only)

DRPIII DRSIII PLB1 JRK1 ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

PUBLIC MEETING PRINCIPAL ATTENDEES May 23, 2006 NRC Christine A. Lipa Chief, Branch 4, Division of Reactor Projects John Ellegood Senior Resident Inspector, Palisades Nuclear Plant Allan Barker Resident Inspector (Acting), Palisades Nuclear Plant Alex Garmoe Reactor Engineer Frank Tran Reactor Engineer Nuclear Management Company Paul Harden Site Vice President, Palisades Nuclear Plant Dwight Mims Site Director, Palisades Nuclear Plant Grover Hettel Plant General Manager, Palisades Nuclear Plant