MONTHYEARRS-20-140, Proposed Changes to Decommissioning Trust Agreements2020-10-30030 October 2020 Proposed Changes to Decommissioning Trust Agreements ML19046A2222019-02-0808 February 2019 NRC-2019-000158 - Resp 1 - Final. Agency Records Subject to the Request Are Enclosed ML17191A2232017-07-10010 July 2017 Commonwealth Edison Company Record for Hearing Index ML17151A8202017-05-31031 May 2017 Record for Hearing Index ML16285A3222016-10-12012 October 2016 ROP PI Frequently Asked Questions (Faqs): 13-06 ML15071A1192015-03-0202 March 2015 Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors RA-15-019, Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2015-03-0202 March 2015 Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML13270A2712013-09-26026 September 2013 Enclosure 2 to Mfn 13-007, Revision 1, GEH Response to RAI 3.9-292, S02 ML13143A3312013-06-0606 June 2013 Operating Boiling-Water Reactor Licensees with Mark 1 and Mark 2 Containments Addresses List - Enclosure 2 ML13135A1212013-05-0101 May 2013 Local Intense Precipitation Evaluation Report, Revision 3 RS-13-110, Flood Hazard Reevaluation Report in Response to the 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding2013-05-0101 May 2013 Flood Hazard Reevaluation Report in Response to the 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1118700982011-09-14014 September 2011 Enclosure 1: Sf 312 Classified Information Nondisclosure Agreement ML1117502192011-06-22022 June 2011 NRC Inspection Findings Related to Closed Cooling Water Systems (1/1/2004 to 6/22/2011) ML1017302062010-06-0909 June 2010 Questions from Senator Durbin'S Staff Regarding the Dresden Station Tritium Leak ML1017301172010-06-0909 June 2010 Groundwater Monitoring Wells Sampled Spring and Fall 2008 ML1017301232010-06-0909 June 2010 Green Ticket Tritium Releases ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML1019703852009-08-24024 August 2009 LS-AA-125-1001, Elevated Tritium Values Identified in 2 Storm Drains Due to Through-Wall Leaks in Underground Piping ML0806704192008-03-0707 March 2008 CDBI Findings ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0713804882007-04-27027 April 2007 DOS 6600-12, Rev 039 Diesel Generator Tests ML0626503122006-09-0101 September 2006 Liquid Radiation Release Lessons Learned Task Force Final Report (Enclosure) ML0623601152006-08-22022 August 2006 Lerf Significance Determination for Dresden HPCI Water Hammer Finding ML0614602442006-05-23023 May 2006 CST Tritium Concentrations 10 Million Pci/I. Portions Outside the Scope of the Request and Therefore Not Provided ML0614601992006-05-23023 May 2006 Inadvertent Liquid Release. Portions Outside the Scope of the Request and Therefore Not Provided ML0614501182006-05-12012 May 2006 Four Questions from Illinois State Senator Durbin'S Staff Regarding the Tritium Leak ML0614501262006-05-12012 May 2006 2004/2006 Tritium Leaks - Chronology of Events ML0614501292006-05-12012 May 2006 Ucs Myths and Facts About the Dresden Water Leak ML0614501452006-05-12012 May 2006 Eexlon Fact Sheet - Dresden Groundwater Tritium Issue ML0614501472006-05-12012 May 2006 Presentation - Tritium Monitoring - Dresden Station Chemistry ML0614505082006-03-14014 March 2006 HPCI Line Piping Replacement Status ML0614602432006-03-10010 March 2006 Tritium Contamination Update. Portions Outside the Scope of the Request and Therefore Not Provided ML0606504612006-02-28028 February 2006 Region III NRC Tritium Inspection Activities ML0614504102006-02-23023 February 2006 Newsflash - Dresden HPCI Leak Repair Update ML0614501652006-02-0909 February 2006 Questionnaire - Onsite Radiological Effluent Monitoring Program ML0614501622006-02-0909 February 2006 Condition Report - AR 00452084 ML0606203672006-01-26026 January 2006 Attachment 1 to Exelon Letter Dated January 26, 2006 ML0513802622005-05-0505 May 2005 Meeting Sign-In Sheet, OPTIMA2 Fuel Topical Reports Walkthru. ML0513802602005-04-14014 April 2005 Meeting Sign-In Sheet, OPTIMA2 Fuel Topical Reports Walkthru. ML0614501792004-08-30030 August 2004 Tritium Leak Resolution at Dresden ML0614501832004-08-30030 August 2004 Condition Report AR 00248494 ML0614501782004-07-31031 July 2004 Condition Report CR Summary Report ML0505404692004-02-10010 February 2004 Dynamic Web Page Printout Dated 02/10/2004, ROP PIM Report - All Sites - Event Dates: 01/01/2003 - 02/10/2004 ML0505404642004-02-0909 February 2004 Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants ML0331001552003-10-27027 October 2003 Status Summary Sheet (Allegation Number NMSS-002-A-0003) ML0331001522003-10-27027 October 2003 Status Summary Sheet (Allegation Number NMSS-2002-A-0002) 2020-10-30
[Table view] |
Text
Tritium Leak Resolution At Dresden The licensee identified on August 30, 2004, through sampling of shallow wells on site that there were elevated levels of tritium as high as 9 million picocuries per liter in some locations. Deep well samples (drinking water) were not at elevated levels. The source of the leakage was identified as a buried common suction line from the condensate storage tanks to the Unit 2 and 3 HPCI systems. Although the condensate storage tank is the normal source of water to the HPCI systems the torus is the safety related source of water and the HPCI systems for both units are currently aligned to the torus. The licensee started excavating on September 3, 2004, to attempt to identify the exact location of the leak. Difficulties with contractor expertise resulted in the inability to identify the exact source of the leak and personnel safety issues within the excavation. The licensee stopped work due to the second issue and is hiring a different excavation contractor. Due to difficulties with excavation near existing equipment and the inability to identify the exact location of the leak the licensee has decided to reroute the piping and abandon portions of the underground piping in place. Unit 2 is entering a maintenance outage on September 18. Unit 3 is entering a refueling outage on October 26, 2004. The piping is required to perform the TS quarterly surveillance testing which becomes critical for Unit 3 on October 10, 2004. If the modification is not complete and the testing cannot be performed, Unit 3 may have to perform a TS required shutdown on October 24, 2004.
/
C,
Tritium Leak Resolution At Dresden Dresden station personnel identified increased tritium levels in the groundwater at the station.
Elevated tritium levels are an historical issue at the site; the licensee had previously established a series of wells and instituted routine sampling to track the problem.
On August 30, 2004, the licensee identified through sampling of shallow wells on site that there were elevated levels of tritium as, high as 9 million picocuries per liter in some locations. Deep well samples (drinking water) were not at elevated levels. Licensee Technical Specifications limit the average annual concentration of tritium released at the site unrestricted area boundary to ten million pci/l. No tritium has been detected at any sampling stations outside the owner controlled area. Regional health physics specialists have identified that the entire condensate storage tank activity of 9.8 million pci/I could be dumped on the ground without exceeding the technical specification release rate for tritium of 10 million pci/I. The source of the leakage was identified as a buried common suction line from the condensate storage tanks to the Unit 2 and 3 HPCI systems. Although the condensate storage tank (CST) is the normal source of water to the HPCI systems, the torus is the safety related source of water and the HPCI systems for both units are currently aligned to the torus and isolated from the CST. The licensee started excavating on September 3, 2004, to attempt to identify the exact location of the leak. The licensee has not been able to identify the exact source of the leak. Due to difficulties with excavation near existing equipment and the inability to identify the exact location of the leak the licensee has decided to reroute the piping and abandon portions of the underground piping in place. This activity is currently in progress. Regional health physics specialists have been following the issue from a radiological release standpoint and the resident inspectors have been following the CST/HPCI status and modification (new piping) work.
This information is currently not publically available in an inspection report. It is expected that the Regional health physics specialist will review the issue in a schedule inspection in early November. It is not expected to be included in the quarterly integrated inspection report due out this month. The State of Illinois (IEMA) is also interested in this leak and has been trying to determine the total amount of tritium that may have leaked, the total length of time the leak has been ongoing (possibly started 9 months ago), and whether there are additional leaks beyond this known leak. The NRC residents and the IEMA resident have coordinated their reviews on this issue.