|
---|
Category:- No Document Type Applies
MONTHYEARML24131A0622024-06-18018 June 2024 Subsequent License Renewal Application Online Reference Portal ML24157A0452024-06-11011 June 2024 Enclosure for Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations ML24215A2782024-03-14014 March 2024 Attachment 1 for Request of Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations RS-20-140, Proposed Changes to Decommissioning Trust Agreements2020-10-30030 October 2020 Proposed Changes to Decommissioning Trust Agreements ML19046A2222019-02-0808 February 2019 NRC-2019-000158 - Resp 1 - Final. Agency Records Subject to the Request Are Enclosed ML17191A2232017-07-10010 July 2017 Commonwealth Edison Company Record for Hearing Index ML17151A8202017-05-31031 May 2017 Record for Hearing Index ML16285A3222016-10-12012 October 2016 ROP PI Frequently Asked Questions (Faqs): 13-06 ML15071A1192015-03-0202 March 2015 Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors RA-15-019, Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2015-03-0202 March 2015 Attachment 1 - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML13270A2712013-09-26026 September 2013 Enclosure 2 to Mfn 13-007, Revision 1, GEH Response to RAI 3.9-292, S02 ML13143A3312013-06-0606 June 2013 Operating Boiling-Water Reactor Licensees with Mark 1 and Mark 2 Containments Addresses List - Enclosure 2 RS-13-110, Flood Hazard Reevaluation Report in Response to the 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding2013-05-0101 May 2013 Flood Hazard Reevaluation Report in Response to the 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding ML13135A1212013-05-0101 May 2013 Local Intense Precipitation Evaluation Report, Revision 3 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1118700982011-09-14014 September 2011 Enclosure 1: Sf 312 Classified Information Nondisclosure Agreement ML1117502192011-06-22022 June 2011 NRC Inspection Findings Related to Closed Cooling Water Systems (1/1/2004 to 6/22/2011) ML1017301172010-06-0909 June 2010 Groundwater Monitoring Wells Sampled Spring and Fall 2008 ML1017301232010-06-0909 June 2010 Green Ticket Tritium Releases ML1017302062010-06-0909 June 2010 Questions from Senator Durbin'S Staff Regarding the Dresden Station Tritium Leak ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML1019703852009-08-24024 August 2009 LS-AA-125-1001, Elevated Tritium Values Identified in 2 Storm Drains Due to Through-Wall Leaks in Underground Piping ML0806704192008-03-0707 March 2008 CDBI Findings ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0713804882007-04-27027 April 2007 DOS 6600-12, Rev 039 Diesel Generator Tests ML0626503122006-09-0101 September 2006 Liquid Radiation Release Lessons Learned Task Force Final Report (Enclosure) ML0623601152006-08-22022 August 2006 Lerf Significance Determination for Dresden HPCI Water Hammer Finding ML0614602442006-05-23023 May 2006 CST Tritium Concentrations 10 Million Pci/I. Portions Outside the Scope of the Request and Therefore Not Provided ML0614601992006-05-23023 May 2006 Inadvertent Liquid Release. Portions Outside the Scope of the Request and Therefore Not Provided ML0614501292006-05-12012 May 2006 Ucs Myths and Facts About the Dresden Water Leak ML0614501452006-05-12012 May 2006 Eexlon Fact Sheet - Dresden Groundwater Tritium Issue ML0614501472006-05-12012 May 2006 Presentation - Tritium Monitoring - Dresden Station Chemistry ML0614501262006-05-12012 May 2006 2004/2006 Tritium Leaks - Chronology of Events ML0614501182006-05-12012 May 2006 Four Questions from Illinois State Senator Durbin'S Staff Regarding the Tritium Leak ML0614505082006-03-14014 March 2006 HPCI Line Piping Replacement Status ML0614602432006-03-10010 March 2006 Tritium Contamination Update. Portions Outside the Scope of the Request and Therefore Not Provided ML0606504612006-02-28028 February 2006 Region III NRC Tritium Inspection Activities ML0614504102006-02-23023 February 2006 Newsflash - Dresden HPCI Leak Repair Update ML0614501652006-02-0909 February 2006 Questionnaire - Onsite Radiological Effluent Monitoring Program ML0614501622006-02-0909 February 2006 Condition Report - AR 00452084 ML0606203672006-01-26026 January 2006 Attachment 1 to Exelon Letter Dated January 26, 2006 ML0513802622005-05-0505 May 2005 Meeting Sign-In Sheet, OPTIMA2 Fuel Topical Reports Walkthru. ML0513802602005-04-14014 April 2005 Meeting Sign-In Sheet, OPTIMA2 Fuel Topical Reports Walkthru. ML0614501792004-08-30030 August 2004 Tritium Leak Resolution at Dresden ML0614501832004-08-30030 August 2004 Condition Report AR 00248494 ML0614501782004-07-31031 July 2004 Condition Report CR Summary Report ML0505404692004-02-10010 February 2004 Dynamic Web Page Printout Dated 02/10/2004, ROP PIM Report - All Sites - Event Dates: 01/01/2003 - 02/10/2004 2024-06-18
[Table view] |
Text
Dresden GroundwaterTitm Isue (continued).
FAC SHEET::0 Ppe Leak atDresde I-Corrections Dres den Station's former owne nw thEdison, notConsoidated Edison
- The pathwayfory radiocv aterial tbreach eenvironment was identified by fDresiden'groundwater monitoring prram.
- ree w~d~Oan000l~ storm din data showsithe rise in grouidwater tritium levels being indicativefth*e art of the leak inalate 2003.
- Actions are Inprogress to oetthefleak. T vt the fngcondensate:
storage tbnkhve bee lose dgThe pipin hasibeen excavated An will be replaced when materials ar on ste. Atvitis such .as uing inflatabe gs 'are being employed t~oreduce leakage. Ground waterjis!being pumped from the excavation nd jis being pocessed bythe plant the on-site Rdioactive Waste m
- othysampling of on-sie (finsidethe protected are) wells was promdo rotn ai rm19 o2001. Wit no Incdene fchange the sampling of wellsT inside the protcted arawsIeue to qurtry a requency In2001. With no fute eieceo hag ntriim levels, the samrrpln of ths6el was discontnued irnJune 200 wllsosteand ite but outside the protected area,00 and surfacea
- tercontinue tobesample iiia quarterl basis. Sampling of site storm drains, which is conducted ona mbinimum calendar year frequeny revealed that as late as ANugst2003 leak exited.
lno
- A very small :leak may awvcontinue unl itwas identified bythe on-site wells Doutside the protected areathoff-ite iwellsstorm dra4insr the surface water sampling. Ifit had beenanyhing buta very small leak, it would have quickly percolated though the ground; due to the head pressure provided by the CST.
- The sampling Pogram for goundwtter monitri was Initiated by Exelon, and is in addition to samplingprgrm4that Is directed by the NRC. Identification Itheoal of the lak my ebee more timrelyha itesampling programcontinued
,.zat aroutinemrate
- ASidiylgi
- t; iNECSS!00080SEi~~~;S
~~tfEi~ t~t'S44Ti.S ii !0
~~fiiik'~ :f4-0f~L0fSt S;-A,:i zYi