May 16, 2006

CAL 3-05-001

Mr. L. William Pearce

Vice President

FirstEnergy Nuclear Operating Company

Perry Nuclear Power Plant

10 Center Road, A290

Perry, OH 44081

SUBJECT: ACKNOWLEDGEMENT OF RECEIPT OF PERRY RESPONSE TO NRC

INSPECTION REPORT 05000440/2006007

Dear Mr. Pearce:

This acknowledges receipt of your letter dated May 9, 2006, which responded to NRC

Inspection Report 05000440/2006007. We have reviewed your response and have no further

questions at this time. Your corrective actions to address the issues discussed in your letter

may be reviewed during a future inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter

will be available electronically for public inspection in the NRC Public Document Room or from

the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Sincerely,

/RA by G. Wright Acting for/

Eric R. Duncan, Chief

Branch 6

Division of Reactor Project

Docket No. 50-440

License No. NPF-58

DISTRIBUTION:

See next page

May 16, 2006

CAL 3-05-001

Mr. L. William Pearce

Vice President

FirstEnergy Nuclear Operating Company

Perry Nuclear Power Plant

10 Center Road, A290

Perry, OH 44081

SUBJECT: ACKNOWLEDGEMENT OF RECEIPT OF PERRY RESPONSE TO NRC

INSPECTION REPORT 05000440/2006007

Dear Mr. Pearce:

This acknowledges receipt of your letter dated May 9, 2006, which responded to NRC

Inspection Report 05000440/2006007. We have reviewed your response and have no further

questions at this time. Your corrective actions to address the issues discussed in your letter

may be reviewed during a future inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter

will be available electronically for public inspection in the NRC Public Document Room or from

the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Sincerely,

/RA by G. Wright Acting for/

Eric R. Duncan, Chief

Branch 6

Division of Reactor Project

Docket No. 50-440

License No. NPF-58

DISTRIBUTION:

See next page

DOCUMENT NAME: E:\Filenet\ML061370209.wpd

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE RIII RIII C

NAME GWright for CWeil for

EDuncan/trt KOBrien

DATE 5/16/06 05/16/06

OFFICIAL RECORD COPY

L. W. Pearce -2-

cc: G. Leidich, President - FENOC

J. Hagan, Chief Operating Officer, FENOC

D. Pace, Senior Vice President Engineering and Services, FENOC

Director, Site Operations

Director, Regulatory Affairs

M. Wayland, Director, Maintenance Department

Manager, Regulatory Compliance

G. Halnon, Director, Performance Improvement

J. Shaw, Director, Engineering Department

D. Jenkins, Attorney, FirstEnergy

Public Utilities Commission of Ohio

Ohio State Liaison Officer

R. Owen, Ohio Department of Health

L. W. Pearce -3-

ADAMS Distribution:

DXC1

KNJ

SJC4

RidsNrrDirsIrib

GEG

KGO

RJP

CAA1

LSL (electronic IRs only)

C. Pederson, DRS (hard copy - IRs only)

DRPIII

DRSIII

PLB1

JRK1

ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)