MONTHYEARML0531902132005-11-0707 November 2005 Application for Amendment to Facility Operating License Revising Technical Specification, Section 3.9.3. to Allow Refueling Operations with the Containment Equipment Hatch Open Project stage: Request ML0608102112006-03-23023 March 2006 R. E. Ginna Nuclear Power Plant - Request for Additional Information Movement of Fuel with Eqiupment Hatch Open Project stage: RAI ML0613204802006-05-0505 May 2006 R. E. Ginna Nuclear Power Plant, Response to Request for Information Application for Amendment to Facility Operating License Revising Technical Specification Section 3.9.3 to Allow Refueling Operations with the Containment Equipment Hatch O Project stage: Response to RAI ML0616002232006-07-26026 July 2006 R. E. Ginna, License Amendment 98 Regarding Refueling Operations with Equipment Hatch Open Project stage: Approval ML0620903672006-07-26026 July 2006 Technical Specifications, Revises TS 3.9.3, Containment Penetrations, to Allow an Emergency Egress Door, Access Door, or Roll Up Door, as Associated with the Equipment Hatch Penetration, to Be Open, But Capable of Being Closed Project stage: Other 2006-03-23
[Table View] |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] |
Text
e - -- , ;
Dave A. Holm R.E. Ginna Nuclear Power Plant, LLC Plant General Manager 1503 Lake Road Ontario, New York 14519-9364 585.771.3635 585.771.3900 Fax Dave.A.Holm @costellation.com Constellation Energy-I Generation Group May 5, 2006 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk
SUBJECT:
R.E. Ginna Nuclear Power Plant Docket No. 50-244 Response to Request for Information Re: Application for Amendment to Facility Operating License Revising Technical Specification. Section 3.9.3. to Allow Refueling Operations With the Containment Equipment Hatch Open.
Reference 1: Letter to USNRC Document Control Desk from Mary G. Korsnick (Ginna), subject:
Application for Amendment to Facility Operating License Revising Technical Specification, Section 3.9.3, to Allow Refueling Operations with the Containment Equipment Hatch Open, dated November 7, 2005.
Reference 2: Letter to Mary G. Korsnick (Ginna) from Patrick Milano (NRC), subject: R.E. Ginna Nuclear Power Plant - Request for Additional Information Regarding Movement of Fuel with Equipment Hatch Open (TAC No. MC89 10), dated March 23, 2006.
On November 7, 2005 R.E. Ginna Nuclear Power Plant, LLC (Ginna) submitted Reference 1 for NRC review. On March 23, 2006 the NRC requested additional information in Reference 2. Also, on April 13, 2006, Ginna and NRC Staff held a conference call to discuss details of the containment hatch configuration and clarify the information requested in Reference 2. Enclosure (1) to this letter contains the requested information based on the above correspondence and subsequent conversation.
Should you have questions regarding the information in this submittal, please contact Mr. Robert Randall at (585) 771-3734 or Robert.Randall @constellation.com.
Dave A. Holm A-CO f
/ OOA6S/
Document Control Desk May 5, 2006 Page 2 STATE OF NEW YORK
- TO WIT:
COUNTY OF WAYNE I, Dave A. Holm, begin duly sworn, state that I am Plant General Manager, R.E. Ginna Nuclear Power Plant, LLC (Ginna LLC), and that I am duly authorized to execute and file this request on behalf of Ginna LLC. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other Ginna LLC employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.
(7/4 Subpcribed and sworn before me, a Notary Public in and of te,"P- .this _day
_ of Z4 f -, 2006(
- I JI WITNESS my Hand and Notarial Seal:
My Commission Expires:
DH/MR RICHARD A.JOHNSON NOTARY PUBLIC, STATE OF EWYORK
Enclosures:
- 1. Response to Request for Additional Information No. 01JO6082344 QUALIFIED INWAYNE COUNTY MY COMMISSION EXPIRES OCT. 21, 20_G cc: S. J. Collins, NRC P.D. Milano, NRC - i-'
Resident Inspector, NRC (Ginna)
P.D. Eddy, NYSDPS
_ f_
Enclosure 1 Response to Request for Additional Information R.E. Ginna Nuclear Power Plant, LLC May 5, 2006
Response to Request for Additional Information Question:
In Enclosure I to the November 7, 2005, application, the licensee states that the proposed amendment would permit either both equipment hatch doors, the closure plate access door, or the roll-up door associatedwith the enclosure building to be open during refueling. The control room atmospheric dispersionfactor (X/Q value) used in the dose assessment to support this amendment request assumes that the equipment hatch is the limiting case because it is the largestpenetrationand has the shortest distance to the control room intake. However, the equipment hatch to control room X/Q values were generatedassuming a diffuse (area) release, which could result in lower X/Q values than for a point source release slightly furtherfrom the control room intake.
Confirm that the control room X/Q values associatedwith a postulated releasefrom the equipment hatch are more limiting than the postulated releasesfrom the closure plate access dooror the roll-up door associated with the enclosure building.
Response
The enclosure building encloses the entire hatch assembly, including the barrel and associated airlock.
The front of the enclosure building is isolated from the environment by the roll-up door referenced in the submittal. Reference 1 includes three methods of containment closure.
- 1. Typical operation during refueling is to remove the hatch barrel and air-lock assembly by withdrawing them through the roll-up door to a remote location using a rail track system.
Containment closure is then obtained by closing the roll-up door. Should a refueling accident occur in this configuration, the activity would disperse into the containment atmosphere and diffuse through the 14 foot diameter opening in the containment wall into the enclosure building, and then exit to the environment through the rollup door at the opposite end of the enclosure building. These assumptions are valid for the analysis presented in Reference 1. The rollup door diffuse area source, whether the door is open or closed, are assumed to be equivalent based on the guidance in Regulatory Guide 1.194, section 3.2.4.
- 2. Should the rollup door become inoperable, closure could be obtained by reinstalling the hatch barrel/airlock assembly. The end of the hatch barrel is approximately 4 feet inside the rollup door in this configuration. Because the end of the hatch barrel is close to the rollup door opening, it could be conservatively assumed that no dispersion would occur in the enclosure building before entering the environment. The area source is represented by the airlock door with dimensions of approximately 3'7" by 6'9".
- 3. If the rollup door and hatch barrel/airlock assembly are unavailable, closure could be obtained by covering the 14 foot diameter opening in the containment wall with the closure plate, which contains a personnel access door with dimensions of approximately 4' by 8'. Any release would be through the open personnel access door in the closure plate, into the enclosure building and then out the open rollup door on the opposite end of the enclosure building.
Of the above configurations option 2 was evaluated because, although slightly further from the control room intake than the rollup door, the dimensions of the opening are smaller. Also, because of the proximity of the hatch barrel personnel door to the rollup door, no credit for dispersion in the enclosure building is considered. With the new dimensions and distances calculated as a defuse area source, the R.E. Ginna Nuclear Power Plant, LLC May 5,2006
I I X/Q increases from 5.58E-03 to 5.76E-3, which is a change of approximately 3 % from the value reported in Reference 1. Applying the new X/Q, the post EPU calculated control room dose would increase by 0.05 Rem to 1.45 Rem TEDE. Therefore, all hatch configuration options presented in Reference 1 are acceptable from a dose perspective.
R.E. Ginna Nuclear Power Plant, LLC May 5,2006