Category:Enforcement Action
MONTHYEARIR 05000277/20180132018-12-11011 December 2018 EA-18-107, Peach Bottom Atomic Power Station-Final Significance Determination for a White Finding W/Assessment follow-up and Notice of Violation-Inspection Report 05000277/2018013 and 05000278/2018013 ML18338A0832018-12-0606 December 2018 EN-18-015, Issuance of Final Significance Determination and Notice of Violation, Peach Bottom Atomic Power Station (EA-18-107) IR 05000278/20130112013-06-20020 June 2013 NRC Investigation Report No. 1-2012-056 and NRC Inspection Report No. 05000278/2013011 - Peach Bottom ML1025905002010-09-16016 September 2010 Letter Notice of Violation (NRC Investigation Report No. I-2009-053) ML0835306052009-01-0606 January 2009 EA-08-301, Wackenhut Nuclear Services - Notice of Violation (NRC Investigation Report No. 1-2008-001) IR 05000277/20074052008-02-12012 February 2008 EA-07-296, Peach Bottom - Final Significance Determination for White Finding; NRC Inspection Report No. 05000277-07-405 and 05000278-07-405 ML0613203662006-05-12012 May 2006 EA 05-203 Peach Bottom-Office of Investigation Case No. 1-2005-015 ML0233002832002-11-26026 November 2002 EA-02-121, EA-02-142, Peach Bottom, NOV & Green and White Findings 2018-12-06
[Table view] Category:Letter
MONTHYEARML24022A2262024-01-22022 January 2024 (PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 24th Refueling Outage for Unit 3 ML23346A2412024-01-17017 January 2024 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information (EPID L-2019-PMP-0061) - Letter IR 05000277/20234022024-01-11011 January 2024 Security Baseline Inspection Report 05000277/2023402 and 05000278/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200029/2023401 ML23354A1922024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML23355A0622023-12-18018 December 2023 Independent Spent Fuel Storage Installation (Isfsi), Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) IR 05000277/20230032023-10-30030 October 2023 Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion ML23286A0012023-10-13013 October 2023 Reply to a Notice of Violation (NOV) - NOV 05000277, 05000278/2023010-01 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23271A1342023-10-11011 October 2023 Dtf Analysis Letter IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 ML23265A1502023-09-22022 September 2023 License Amendment Request Revise a License Condition and Certain Technical Specifications to Remove Restrictions in Support of Decommissioning Activities ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L IR 05000277/20230102023-09-15015 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000277/2023010 and 05000278/2023010 and Notice of Violation ML23251A2022023-09-11011 September 2023 Cover Letter W/Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement IR 05000277/20230052023-08-31031 August 2023 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 IR 05000277/20230112023-08-15015 August 2023 Comprehensive Engineering Team Inspection Report 05000277/2023011 and 05000278/2023011 ML23226A1112023-08-14014 August 2023 10 CFR 50.46 Annual Report IR 05000277/20230022023-08-0808 August 2023 Integrated Inspection Report 05000277/2023002 and 05000278/2023002 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000277/20230402023-07-17017 July 2023 95001 Inspection Supplemental Report 05000277/2023040 and Follow-Up Assessment Letter ML23188A0532023-07-0707 July 2023 Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks ML23186A1272023-07-0606 July 2023 Response to Disputed Non-Cited Violation Documented in Peach Bottom Atomic Power Station, Units 2 and 3, Inspection Report 05000277/2022004 and 05000278/2022004 ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML23150A2052023-05-30030 May 2023 Independent Spent Fuel Storage Installation (Isfsi), Annual Radiological Environmental Operating Report 80 January 1, 2022 Through December 31, 2022 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements ML23132A1582023-05-18018 May 2023 Correction to Technical Specification 3.4.7 (Page 3.4-16) Issued in Amendment No. 337 ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) IR 05000277/20230012023-05-0808 May 2023 Integrated Inspection Report 05000277/2023001 and 05000278/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI 2024-01-05
[Table view] Category:OI Investigation Report
MONTHYEARML0733408762006-12-11011 December 2006 Report of Investigation - Violation of Fitness-for-Duty Procedures ML0613203662006-05-12012 May 2006 EA 05-203 Peach Bottom-Office of Investigation Case No. 1-2005-015 ML0319802672003-07-16016 July 2003 NRC Office of Investigations Case No. 1-2003-002 2006-05-12
[Table view] |
Text
May 12, 2006 EA 05-203 Mr. Christopher M. Crane President and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way KSA 3-E Kennett Square, PA 19348
SUBJECT:
NRC OFFICE OF INVESTIGATIONS CASE NO. 1-2005-015 (Peach Bottom Atomic Power Station)
Dear Mr. Crane:
This letter refers to an investigation initiated by the NRC Office of Investigations (OI), Region I, on April 15, 2005, after your staff informed the NRC that it had identified that a contractor employee was not performing designated hourly fire watches at the Peach Bottom Atomic Power Station and was falsifying the fire watch logs to indicate that the fire watches were being performed. Your staff determined that this occurred on 199 occasions between January 17 and March 20, 2005, at various locations in the plant.
The OI investigation was initiated to determine if the contractor employee, who was designated to perform the roving fire watches, deliberately failed to complete the required fire watch rounds and deliberately falsified the fire watch logs. Based on the evidence developed during its investigation, including admissions by the contract employee, OI substantiated that the individual deliberately failed to complete the required fire watch rounds and deliberately falsified the fire watch logs to indicate that the rounds had been completed.
The OI investigation report was provided to the U.S. Department of Justice who in turn prosecuted the contractor employee. Subsequently, the contractor employee pled guilty to falsely certifying on the fire watch patrol round sheets that she had conducted numerous daily fire watch safety inspections at Peach Bottom when in fact she had not conducted the fire watch inspections. On March 28, 2006, the individual was fined and sentenced to probation by the U.S. District Court in the Middle District of Pennsylvania.
The actions by the contractor employee resulted in Peach Bottom being in violation of Technical Specification (TS) 5.4.1, Procedures, which requires in part that written procedures be established, implemented, and maintained covering fire protection program implementation.
Exelon Procedure OP-MA-201-007, Rev. 3, Fire Protection System Impairment Control, Section 4.4.4, Fire Watch Performance, requires in part that the individual assigned the fire watch duty shall perform the assigned fire watch and continuously complete the fire watch log until properly relieved or the watch is terminated.
Because you are responsible for the actions of your employees and contractor employees, and because the violation was deliberate, the violation was evaluated under the NRC traditional
Mr. Christopher Crane 2 enforcement process as set forth in Section IV.A.4 of the NRC Enforcement Policy. The NRC Enforcement Policy is available on the NRCs website at http://www.nrc.gov. The violation has been classified at Severity Level IV.
The NRC considered issuance of a Notice of Violation for this issue. However, after considering the factors set forth in Section VI.A.1 of the Enforcement Policy, the NRC has determined that a non-cited violation (NCV) is appropriate in this case for the following reasons:
You restored compliance immediately after identification of the violation by terminating the employee on March 22, 2005, and by conducting a prompt investigation to review the access records for other contractor fire watch staff that concluded that the individuals action was an isolated case. You placed the violation into your corrective action program and took corrective actions to preclude recurrence by: providing an Institute of Nuclear Power Operations Nuclear Network Operating Experience Notification for the event, enhancing your procedure to control contractors, and conducting training on contractor oversight. The violation was not repetitive within the context of the NRC Enforcement Policy. Additionally, although the violation was willful; you identified the violation and notified the NRC, the violation involved the acts of a low-level contractor employee who was not a licensee official within the context of the NRC enforcement policy, the violation resulted from the isolated actions of a single individual without management involvement, and you took significant remedial action which included termination of the individuals employment.
A response to this letter is not required. However, if you contest this NCV or its significance, you should provide a response within 30 days of the date of this letter, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Regional Administrator, Region I, and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. The NRC also includes significant enforcement actions on its Web site at www.nrc.gov; select What We Do, Enforcement, then Significant Enforcement Actions.
Should you have any questions regarding this letter, please feel free to contact Mr. James Trapp at 610-337-5186.
Sincerely,
/RA/ Original Signed by David C. Lew for Brian E. Holian, Director Division of Reactor Projects Docket No: 50-277/278 License No: DPR-44 & DPR-56
Mr. Christopher Crane 3 cc w/encl:
Site Vice President, Peach Bottom Atomic Power Station Plant Manager, Peach Bottom Atomic Power Station Regulatory Assurance Manager - Peach Bottom Associate General Counsel, Exelon Generation Company Manager, Financial Control & Co-Owner Affairs Manager Licensing, PBAPS Director, Nuclear Training Correspondence Control Desk Director, Bureau of Radiation Protection (PA)
R. McLean, Power Plant and Environmental Review Division (MD)
R. Fletcher, Maryland Department of Environment T. Snyder, Director, Air and Radiation Management Administration, Maryland Department of the Environment (SLO, MD)
Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. Ruth, Council Administrator of Harford County Council Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance TMI - Alert (TMIA)
J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams Vice President, Licensing and Regulatory Affairs Vice President, Operations Mid-Atlantic Senior Vice President, Nuclear Services Director, Licensing and Regulatory Affairs J. Fewell, Assistant General Counsel
Mr. Christopher Crane 4 DISTRIBUTION:
PBonnett, NRR MJohnson, OE SFigueroa, OE LTrocine, OE BJones, OGC MElwood, OGC GCaputo, OI BSosa, OEDO DRoberts, NRR VNerses, NRR, PM GWunder, NRR DScrenci, RI NSheehan, RI SCollins, RA MDapas, DRA ABlough, DRS RLorson, DRS JTrapp, DRP CKhan, DRP FBower, SRI KFarrar, RI DHolody, RI RSummers, RI RUrban, RI Region I OE Files (with concurrences)
OEMAIL SISP Review Complete: ___jmt______ (Reviewers Initials)
DOCUMENT NAME: E:\Filenet\ML061320366.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/ORA RI/DRP RI/DRS RI/OI RI/RC NAME RSummers JTrapp ABlough EWilson KFarrar DATE 04/26/06 05/02/06 04/28/06 04/27/06 04/27/06 OFFICE RI/ORA RI/DRP OE NAME DHolody BHolian MJohnson/rju for*
DATE 04/27/06 05/04/06 04/09/06 OFFICIAL RECORD COPY