|
---|
Category:Slides and Viewgraphs
MONTHYEARML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23251A0782023-09-0606 September 2023 DRE1 Decom Pre-Submittal Slides ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23173A0462023-06-28028 June 2023 DNPS SLR Pre-submittal Meeting Presentation Rev. 1 ML23173A0472023-06-28028 June 2023 SLRA - NRC Presubmittal Meeting Slides - 6-28-23 ML23165A0242023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23145A1322023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - Constellation Slides NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML22053A2912022-02-22022 February 2022 NRC Slides for February 25, 2022 Meeting - Acceptance Review of Proposed Alternative to Adopt ASME Code Case N-921 at Dresden and Quad Cities ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21194A1822021-07-13013 July 2021 and Quad Cities Nuclear Generating Stations 2020 Annual Assessment Meeting Slides ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML20258A0302020-09-22022 September 2020 Decommissioning Licensing Action Submittal Plan for Byron and Dresden Stations Early Shutdowns ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20238B8572020-08-25025 August 2020 Quad 2019 Hq Online EOC Slides ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18207A1882018-07-26026 July 2018 Slides for Dresden 2017 EOC Open House ML18086A8432018-03-27027 March 2018 NUREG-1021, Revision 11 Implementation ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17156A7972017-06-0505 June 2017 Presentation for 2016 Dresden Nuclear Power Station EOC Open House ML16189A2552016-07-0707 July 2016 Annual Assessment Meeting/Open House (Hand Out) ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML15135A4252015-05-19019 May 2015 EOC Mtg Slides ML15013A1562015-01-14014 January 2015 Meeting Slide Regarding Dresden Nuclear Power Station Pre-Application Meeting for Providing Natural Gas as a Primary Fuel to Station Auxiliary Heating Boilers RS-14-238, Transmittal of Proprietary Meeting Slides2014-08-25025 August 2014 Transmittal of Proprietary Meeting Slides ML14232A7852014-05-19019 May 2014 Fuel Transition License Amendment Request Pre-Submittal Update Meeting ML13149A2062013-05-22022 May 2013 NRC Slides from Public Meeting ML1208701402012-03-27027 March 2012 Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR ML11201A2132011-07-20020 July 2011 Summary of Public Meeting to Discuss Exelon'S Plans for Implementing an Electronic Document Control System (Edocs) for Use by NRC Inspectors with U.S. Nuclear Regulatory Commission (NRC) Region III Staff ML1113202162011-05-11011 May 2011 Slides for Dresden Nuclear Power Station End-Of-Cycle Public Open House ML1012000332010-04-28028 April 2010 Annual Assessment Meeting Slides ML0929400522009-10-22022 October 2009 Meeting Power Uprate Meeting Slides ML0914003382009-05-14014 May 2009 Slides Presented at the Dresden Station 2008 EOC Public Meeting ML0812007842008-06-0202 June 2008 Meeting Slides, Nrc/Exelon Licensing Counterparts Meeting. ML0812209792008-04-30030 April 2008 Meeting Slides, Dresden Annual Assessment Meeting, Reactor Oversight Program - Cy 2007. ML0811504162008-04-22022 April 2008 Pandemic Planning Utility Interface with NRC Slide Presentation ML0714404642007-05-23023 May 2007 End-of-Cycle Meeting - NRC Slides ML0716601022007-03-20020 March 2007 Slides to Counterparts Meeting with Exelon to Discuss Current and Planned Licensing Activities and Process - Correction ML0705101392007-02-16016 February 2007 2007 Emergency Preparedness and Incident Response Public Meeting: Status of the EP Threat Based Project, 2/16/07 ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0613000812006-04-26026 April 2006 Annual Plant Performance Public Meeting - NRC Presentation Slides ML0617802832006-03-0707 March 2006 RIC 2006 Presentation - T2F - J. Bradley Fewell - Allegations ML0615901482006-03-0707 March 2006 RIC 2006 Presentation - T1E - Pamela B. Cowan - Licensing Issues 2024-01-30
[Table view] |
Text
Dresden Annual Assessment Meeting Morris, IL - April 26, 2006 Reactor Oversight Program - CY 2005 Nuclear Regulatory Commission - Region III
Purpose of Todays Meeting A public forum for discussion of the licensees performance NRC will address the licensee performance issues identified in the annual assessment letter Licensee will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance
Agenda z Introduction z Review of Reactor Oversight Process z National Summary of Plant Performance z Discussion of Plant Performance Results z Licensee Response and Remarks z NRC Closing Remarks z Break z NRC available to address public questions
Region III Organization James L. Caldwell Regional Administrator Geoffrey E. Grant Deputy Regional Administrator Mark A. Satorius Cynthia D. Pederson Director Division of Reactor Projects Director Division of Reactor Safety K. Steven West Anne T. Boland Deputy Director Deputy Director Mark A. Ring Regional Specialists Branch Chief Dresden Resident Inspectors Desiree Smith Project Engineer Mina Sheikh Allan Barker
NRC Representatives z __ Mark A. Satorius, Director, Division Reactor Projects
- (630) 829-9600 z __K. Steven West, Deputy Division Director, DRP
- (630) 829-9601 z __Maitri Banerjee, Project Manager, NRR
- (301) 415-2277 z __Desiree Smith, Senior Resident Inspector
- (815) 942-9267 z __Mina Sheikh, Resident Inspector
- (815) 942-9267 z _ Allan Barker, Project Engineer
- (630) 829-9679 z _ Mark A. Ring, Branch Chief
- (630) 829-9703
NRC Performance Goals z Safety: Ensure protection of the public health and safety and the environment z Security: Ensure the secure use and management of radioactive materials z Openness: Ensure openness in our regulatory process z Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely z Management: Ensure excellence in agency management to carry out the NRCs strategic objectives
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response
Examples of Baseline Inspections z Equipment Alignment ~80 hrs/yr z Triennial Fire Protection ~200 hrs every 3 yrs z Operator Response ~125 hrs/yr z Emergency Preparedness ~80 hrs/yr z Rad Release Controls ~110 hrs every 2 yrs z Worker Radiation Protection ~90 hrs/yr z Corrective Action Program ~250 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr
Significance Threshold Performance Indicators Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very Low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue
Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
National Summary of Plant Performance Status at End of CY 2005 Licensee Response 84 Regulatory Response 12 Degraded Cornerstone 4 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total 103
National Summary z Performance Indicator Results (at end of CY 2005)
Green 1850 White 4 Yellow 0 Red 0 z Total Inspection Findings (CY 2005)
Green 849 White 10 Yellow 1 Red 0
Dresden Assessment Results (Jan 1 - Dec 31, 2005) z Licensee Response Action Matrix column based on all PIs and inspection findings being Green z No supplemental inspections were required/performed in 2005 z Substantive cross-cutting issue in Human Performance discontinued at Mid-Cycle based on improved performance
Dresden Inspection Activities (Jan 1 - Dec 31, 2005)
NRC conducted approximately 3,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of inspections during CY 2005 New Senior Resident Inspector Assigned 4/06 Total of 14 GREEN Findings No Safety Significant Findings No Substantive Cross Cutting Issues
Dresden Inspection Activities (Jan 1 - Dec 31, 2005)
Dual unit outages for non-safety service water leak repairs Unit 2 refueling outage Cracks found in gusset area of steam dryers on both units
- Dresden announced plans to replace the steam dryers 3B recirculation pump seal replaced twice HPCI/CST line leakage in early 2006 - tritium in on-site sample wells
Dresden Annual Assessment Summary January 1 - December 31, 2005 z Exelon operated Dresden in a manner that preserved public health and safety z All cornerstone objectives were met z NRC plans baseline inspections at Dresden for the remainder of the assessment period and IP 71004, Extended Power Uprate (EPU), for activities related to the steam dryer replacement.
Licensee Response and Remarks Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:
(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov Select What We Do for Public Affairs
Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free)