Annual Plant Performance Public Meeting - NRC Presentation Slides
ML061300081
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/26/2006
From:
NRC/RGN-III
To:
References
FOIA/PA-2010-0209
Download: ML061300081 (19)


Text

Dresden Annual Assessment Meeting Morris, IL - April 26, 2006 Reactor Oversight Program - CY 2005 Nuclear Regulatory Commission - Region III

Purpose of Todays Meeting A public forum for discussion of the licensees performance NRC will address the licensee performance issues identified in the annual assessment letter Licensee will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance

Agenda z Introduction z Review of Reactor Oversight Process z National Summary of Plant Performance z Discussion of Plant Performance Results z Licensee Response and Remarks z NRC Closing Remarks z Break z NRC available to address public questions

Region III Organization James L. Caldwell Regional Administrator Geoffrey E. Grant Deputy Regional Administrator Mark A. Satorius Cynthia D. Pederson Director Division of Reactor Projects Director Division of Reactor Safety K. Steven West Anne T. Boland Deputy Director Deputy Director Mark A. Ring Regional Specialists Branch Chief Dresden Resident Inspectors Desiree Smith Project Engineer Mina Sheikh Allan Barker

NRC Representatives z __ Mark A. Satorius, Director, Division Reactor Projects

- (630) 829-9600 z __K. Steven West, Deputy Division Director, DRP

- (630) 829-9601 z __Maitri Banerjee, Project Manager, NRR

- (301) 415-2277 z __Desiree Smith, Senior Resident Inspector

- (815) 942-9267 z __Mina Sheikh, Resident Inspector

- (815) 942-9267 z _ Allan Barker, Project Engineer

- (630) 829-9679 z _ Mark A. Ring, Branch Chief

- (630) 829-9703

NRC Performance Goals z Safety: Ensure protection of the public health and safety and the environment z Security: Ensure the secure use and management of radioactive materials z Openness: Ensure openness in our regulatory process z Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely z Management: Ensure excellence in agency management to carry out the NRCs strategic objectives

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response

Examples of Baseline Inspections z Equipment Alignment ~80 hrs/yr z Triennial Fire Protection ~200 hrs every 3 yrs z Operator Response ~125 hrs/yr z Emergency Preparedness ~80 hrs/yr z Rad Release Controls ~110 hrs every 2 yrs z Worker Radiation Protection ~90 hrs/yr z Corrective Action Program ~250 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr

Significance Threshold Performance Indicators Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very Low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue

Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

National Summary of Plant Performance Status at End of CY 2005 Licensee Response 84 Regulatory Response 12 Degraded Cornerstone 4 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total 103

National Summary z Performance Indicator Results (at end of CY 2005)

Green 1850 White 4 Yellow 0 Red 0 z Total Inspection Findings (CY 2005)

Green 849 White 10 Yellow 1 Red 0

Dresden Assessment Results (Jan 1 - Dec 31, 2005) z Licensee Response Action Matrix column based on all PIs and inspection findings being Green z No supplemental inspections were required/performed in 2005 z Substantive cross-cutting issue in Human Performance discontinued at Mid-Cycle based on improved performance

Dresden Inspection Activities (Jan 1 - Dec 31, 2005)

NRC conducted approximately 3,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of inspections during CY 2005 New Senior Resident Inspector Assigned 4/06 Total of 14 GREEN Findings No Safety Significant Findings No Substantive Cross Cutting Issues

Dresden Inspection Activities (Jan 1 - Dec 31, 2005)

Dual unit outages for non-safety service water leak repairs Unit 2 refueling outage Cracks found in gusset area of steam dryers on both units

- Dresden announced plans to replace the steam dryers 3B recirculation pump seal replaced twice HPCI/CST line leakage in early 2006 - tritium in on-site sample wells

Dresden Annual Assessment Summary January 1 - December 31, 2005 z Exelon operated Dresden in a manner that preserved public health and safety z All cornerstone objectives were met z NRC plans baseline inspections at Dresden for the remainder of the assessment period and IP 71004, Extended Power Uprate (EPU), for activities related to the steam dryer replacement.

Licensee Response and Remarks Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:

(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov Select What We Do for Public Affairs

Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free)