Dominion Nuclear Connecticut, Inc.

Millstone Power Station Sj Dominion-Rope Ferry Road Waterford, Cur 06385 APR 2 5 2006 U.S. Nuclear Regulatory Commission Serial No.06-331 Attention: Document Control Desk MPS Lic/GJC RO Washington, DC 20555 Docket Nos. 50-245 50-336 50-423 License Nos. DPR-21 DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 1, 2, AND 3 2005 OCCUPATIONAL RADIATION EXPOSURE INFORMATION Pursuant to the regulatory commitment made in Dominion Nuclear Connecticut, Inc.,

(DNC) Letter 04-7381, DNC hereby submits documentation in Attachment 1 supporting the apportionment of the station doses and personnel for Millstone Units 1, 2, and 3.

If you have any questions or require additional information, please contact Mr. David W.

Dodson at (860) 447-1791, extension 2346.

Very truly yours, JA rce S ice President - Millstone 1 W. R Matthews to USNRC, Serial No.04-738, dated December 21, 2004, Application For Technical Specification Improvement To Eliminate Requirements To Provide Monthly Operating Reports And Occupational Radiation Exposure Reports,

Serial No.06-331 2005 Occupational Radiation Exposure Report Page 2 of 2 Attachments: 1 Commitments made in this letter: None.

cc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. A. B. Wang Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 7E1 Rockville, MD 20852-2738 Mr. R. Prince NRC Inspector U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station Director, Office of Nuclear Regulatory Research U. S. Nuclear Regulatory Commission Attention: REIRS Project Manager Washington, DC 20555

Seral No.06-331 Page 1 Attachment 1 2005 Occupational Radiation Exposure Information Millstone Power Station, Units 1, 2, and 3 Dominion Nuclear Connecticut, Inc. (DNC)

PEWPDD20 MILLSTONE POWER STATION 10-Mar-2006 sosinrv REG. GUIDE 1.16 REPORT Page 1 Reporting Year : 2005 Unit : 1


# Of Personnel ------- ------- Total Man-mRem-------

Work & Job Function Station Utility Contract Station Utility Contract Inservice Inspection Engineering Staff 0 0 0 0 0 0 Health Physics and Lab 0 0 0 0 0 0 Maint and Construction 0 0 0 0 0 0 Operations 0 0 0 0 0 0 Supv and Office Staff 0 0 0 0 0 0 Refueling Operations Engineering Staff 0 0 0 0 0 0 Health Physics and Lab 0 0 0 0 0 0 Maint and Construction 0 0 0 0 0 0 Operations 0 0 0 0 0 0 Supv and Office Staff 0 0 0 0 0 0 Routine Oper and Surv Engineering Staff 4 0 2 0 0 0 Health Physics and Lab 39 0 24 85 0 31 Maint and Construction 15 2 45 83 0 25 Operations 4 0 2 5 0 0 Supv and Office Staff 7 1 0 1 0 0 Routine Plant Maint Engineering Staff 36 4 9 10 0 5 Health Physics and Lab 4 0 3 2 0 0 Maint and Construction 136 6 349 59 0 46 Operations 78 0 12 72 0 2 Supv and Office Staff 10 0 25 0 0 4 Special Plant Maint Engineering Staff 2 0 1 0 0 5 Health Physics and Lab 6 0 2 12 0 6 Maint and Construction 16 0 15 57 0 270 Operations 5 0 0 31 0 0 Supv and Office Staff 2 0 0 2 0 0 Waste Processing Engineering Staff 2 0 0 1 0 0 Health Physics and Lab 11 0 9 19 0 24 Maint and Construction 19 0 35 35 0 0 Operations 4 0 0 3 0 0 Supv and Office Staff 3 0 0 2 0 0 Job Totals Engineering Staff 44 4 12 11 0 10 Health Physics and Lab 60 0 38 118 0 61 Maint and Construction 186 8 444 234 0 341 Operations 91 0 14 111 0 2 Supv and Office Staff 22 1 25 5 0 4 Unit 1 Total 403 13 533 479 0 418 Note: Report contains electronic dosimeter or PIC dose only Dose of persons with <100 mRem IS INCLUDED

PEWPDD20 MILLSTONE POWER STATION 10-Mar-2006 sosinrv REG. GUIDE 1.16 REPORT Page 2 Unit : 2


# Of Personnel ------- -------Total Man-mRem-------

Work & Job Function Station Utility Contract Station Utility Contract Inservice Inspection Engineering Staff 31 2 11 742 9 349 Health Physics and Lab 19 0 6 235 0 234 Maint and Construction 63 4 147 1309 150 7566 Operations 21 0 0 700 0 0 Supv and Office Staff 13 2 5 217 2 59 Refueling Operations Engineering Staff 28 5 8 736 92 279 Health Physics and Lab 20 0 22 1185 0 746 Maint and Construction 68 3 220 6801 125 8079 Operations 16 0 1 1663 0 2 Supv and Office Staff 12 1 3 303 30 111 Routine Oper and Surv Engineering Staff 142 18 40 876 218 67 Health Physics and Lab 53 0 79 3646 0 5276 Maint and Construction 150 14 117 1816 79 979 Operations 127 0 5 3958 0 109 Supv and Office Staff 40 4 14 353 3 33 Routine Plant Maint Engineering Staff 95 13 23 486 276 58 Health Physics and Lab 23 0 18 189 0 328 Maint and Construction 307 19 950 4436 251 30325 Operations 40 0 12 270 0 1 Supv and Office Staff 37 7 56 245 29 177 Special Plant Maint Engineering Staff 86 8 25 1330 36 596 Health Physics and Lab 40 0 47 1470 0 1090 Maint and Construction 196 6 696 8874 71 30465 Operations 34 0 3 142 0 7 Supv and Office Staff 26 1 17 285 34 140 Waste Processing Engineering Staff 11 0 3 0 0 0 Health Physics and Lab 34 0 50 434 0 255 Maint and Construction 64 8 194 301 25 362 Operations 20 0 2 108 0 0 Supv and Office Staff 13 1 1 19 0 0 Job Totals Engineering Staff 393 46 110 4170 631 1349 Health Physics and Lab 189 0 222 7159 0 7929 Maint and Construction 848 54 2324 23537 701 77776 Operations 258 0 23 6841 0 119 Supv and Office Staff 141 16 96 1422 98 520 Unit 2 Total 1829 116 2775 43129 1430 87693 Note: Report contains electronic dosimeter or PIC dose only Dose of persons with <100 mRem IS INCLUDED

PEWPDD20 MILLSTONE POWER STATION 10-Mar-2006 sosinrv REG. GUIDE 1.16 REPORT Page 3 Unit : 3


# Of Personnel ------- ------- Total Man-mRem-------

Work & Job Function Station Utility Contract Station Utility Contract Inservice Inspection Engineering Staff 31 5 11 1112 36 672 Health Physics and Lab 10 0 19 186 0 311 Maint and Construction 76 4 198 1424 185 12594 Operations 15 0 0 66 0 0 Supv and Office Staff 18 0 2 601 0 71 Refueling Operations Engineering Staff 26 6 4 245 24 37 Health Physics and Lab 20 0 22 487 0 275 Maint and Construction 51 1 64 3340 0 2980 Operations 22 0 0 1323 0 0 Supv and Office Staff 11 1 3 166 1 15 Routine Oper and Surv Engineering Staff 152 12 38 762 31 76 Health Physics and Lab 54 1 89 2837 125 2109 Maint and Construction 182 12 299 1552 13 1191 Operations 125 0 11 3145 0 30 Supv and Office Staff 38 9 36 116 21 67 Routine Plant Maint Engineering Staff 83 8 21 366 51 81 Health Physics and Lab 33 0 27 328 0 462 Maint and Construction 308 23 960 3707 17 19699 Operations 117 0 16 590 0 27 Supv and Office Staff 38 9 67 274 1 45 Special Plant Maint Engineering Staff 17 3 3 137 21 12 Health Physics and Lab 16 0 5 172 0 29 Maint and Construction 84 5 205 1048 1 2662 Operations 6 0 1 14 0 2 Supv and Office Staff 4 0 1 2 0 0 Waste Processing Engineering Staff 6 2 1 1 0 0 Health Physics and Lab 49 0 44 490 0 1020 Maint and Construction 34 5 97 273 18 406 Operations 7 0 0 2 0 0 Supv and Office Staff 14 1 1 50 0 0 Job Totals Engineering Staff 315 36 78 2623 163 878 Health Physics and Lab 182 1 206 4500 125 4206 Maint and Construction 735 50 1823 11344 234 39532 Operations 292 0 28 5140 0 59 Supv and Office Staff 123 20 110 1209 23 198 Unit 3 Total 1647 107 2245 24816 545 44873 Note: Report contains electronic dosimeter or PIC dose only Dose of persons with <100 mRem IS INCLUDED

PEWPDD20 MILLSTONE POWER STATION 10-Mar-2006 sosinrv REG. GUIDE 1.16 REPORT Page 4


# Of Personnel ------- ------- Total Man-mRem-------

Station Utility Contract Station Utility Contract Grand Total 3879 236 5553 68424 1975 132984 Note: Report contains electronic dosimeter or PIC dose only Dose of persons with <100 mRem IS INCLUDED