ML061280476
| ML061280476 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/24/2006 |
| From: | David Helker Exelon Nuclear |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML061280476 (1) | |
Text
Exeltn.
Exelon Nuclear www.exeloncorp.com Nu clear 200 Exelcn Way Kennett Square, PA 19348 TS 5.5.10.d April 24, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Subjec::
Submittal of Changes to Technical Sbecifications Bases In accordance with the requirement of Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Technical Specification 5.5.1 0.d, Exelon Generation Company, LLC, hereby submits a complete updated copy of the Unit 2 and Unit 3 Technical Specifications Bases through Unit 2 Bases Revision 56 and Unit 3 Bases Revision 57. The enclosed Bases include changes through the date of this letter.
If you have any questions or require further information, please contact Tom Loomis (610-765-5510).
Sincerely, David F. Helker Manager - Licensing & Regulatory Affairs
Enclosures:
- 1) F'BAPS Unit 2 Bases
- 2) FPBAPS Unit 3 Bases cc S. J. Collins, Administrator, Region 1, USNRC (wo/enc)
F. Bower, USNRC Senior Resident Inspector, PBAPS (wo/enc)
T. Valentine, Project Manager, USNRC (w/enc)
R. Guzman, Project Manager, USNRC (wo/enc)
-AQt7