ML061280373

From kanterella
Jump to navigation Jump to search
Re Operator Licensing Examination Approval
ML061280373
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/05/2006
From: Pederson C
Division of Reactor Safety III
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
Download: ML061280373 (4)


Text

May 5, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Crane:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Braidwood Station.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. Carl B. Dunn, Training Director, Braidwood Station.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, during the week of May 15, 2006. The NRC staff will administer the operating tests during the week of May 15, 2006.

Please contact Mr. Dell R. McNeil, at 630-829-9737, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Cynthia D. Pederson, Director Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 See Attached Distribution

Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Crane:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Braidwood Station.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. Carl B. Dunn, Training Director, Braidwood Station.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, during the week of May 15, 2006. The NRC staff will administer the operating tests during the week of May 15, 2006.

Please contact Mr. Dell R. McNeil, at 630-829-9737, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, Cynthia D. Pederson, Director Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 See Attached Distribution DOCUMENT NAME: E:\\Filenet\\ML061280373.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MABies:co DRMcNeil MEBfor HPeterson MEBfor CPederson DATE 05/05/06 05/05/06 05/05/06 05/05/06 OFFICIAL RECORD COPY

C. Crane cc:

Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission Carl B. Dunn, Training Director

C. Crane ADAMS Distribution:

DXC1 JBH1 RidsNrrDirsIrib GEG KGO SPR CAA1 LSL (electronic IRs only)

DRPIII DRSIII PLB1 JRK1 ROPreports@nrc.gov DCT M. A. Bies, DRS