ML061230674

From kanterella
Jump to navigation Jump to search
Transmittal of 2005 Fort Calhoun Station (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report
ML061230674
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/25/2006
From: Mcmanis J
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-06-0047
Download: ML061230674 (2)


Text

-

-m Omaha PurJc PowerfDul 444 South 16th Street Mall Omaha NE 68102-2247 April 25, 2006 LIC-06-0047 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Reference:

Docket No. 50-285

SUBJECT:

2005 Fort Calhoun Station (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report Pursuant to FCS Unit No. 1 Technical Specifications (TS) 5.9.4.a and 5.9.4.b, the Omaha Public Power District (OPPD) provides the enclosed two reports. The first report is the Annual Radiological Effluent Release Report for January 1, 2005, through December 31, 2005. This report is submitted in accordance with TS Section 5.9.4.a and is presented in the format outlined in Regulatory Guide 1.21, Revision 1. The report provides the results of quarterly dose calculations performed in accordance with the Offsite Dose Calculation Manual (ODCM).

The second report is the Annual Radiological Environmental Operating Report (REOP) for January 1, 2005, through December 31, 2005. This report is submitted in accordance with TS Section 5.9.4.b and is consistent with the objectives specified in Section 5 of the ODCM.

Employment with Equal Opportunity 4171

U.S. Nuclear Regulatory Commission LIC-06-0047 Page 2 Please contact T. R. Dukarski at 402-533-7126 if you have any questions. No commitments are made to the NRC in this letter.

erely, J. tMeManis ager - Nuclear Licensing JLM/mle

Enclosures:

1. Annual Radiological Effluent Release Report
2. Annual Radiological Environmental Operating Report c:

B. S. Mallett, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager (w/o Enclosures)

J. D. Hanna, NRC Senior Resident Inspector T. J. Wolff, American Nuclear Insurers