Entergy - Spent Fuel Pool Bulletin #2, Second Dive in IP2 Spent Fuel Pool Does Not Reveal Leak
ML061160466
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 11/21/2005
From:
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2006-0081
Download: ML061160466 (1)


Text

information inthis record ws deleted

_ih in accordance witb te d O ct, xemdouL j:.

e"!. ..A.,

OGFOUL , 4, , .

-I trg t November 21, 2005 Spent Fuel Pool Bulletin # 2 I i Second Dive in 1P2 Spent Fuel FPool Does Not Reveal Leak A second dive by Underwater Construction, a Connecticut company that specializes in nuclear dive services, did not reveal the source of a leak in the Indian Point Unit 2 spent fuel pc ol.

Similarly to a dive performed last week, the diver installed a vacuum box over a small section of the southwest corner of the fuel pool where a potential flaw was identified in a video inspection of the liner. The set fuel pool is lined with welded stainless steel plates, abouiech thick. The potential flaw is Vacuum bax that was used in the spent located about 18 feet from the top of the spent fuel pool. The top -""1 fuelpool dives. of the fuel racks which contain the spent fuel assemblies is about 25 feet from the top.

The video inspection of the spent fuel pool liner is about 50%

complete. It includes all four walls of the pool in the areas above the fuel racks and the full wall areas of the cask loading area. The IP2 spent fuel pool has a section in the southwest corner that does not contain fuel racks which will be used to load spent fuel into casks for dry storage.

The spent fuel pool dive, which was conducted as an Infrequently Performed Test or Evolution, incorporated a number of safety precautions, both to protect the diver against the physical stress of

  • performing work in a warm pool and to reduce radiation exposure.

"Small changes in dive location near the fuel bundles can result in Radiation Protectiontechnicianoperai'es large swings in radiation levels," said Bob Deschamps, who the bridge crane to help ensure that the served as senior manager on the job. As in the first dive, the IPTE waspivrformedsafely..

diver's movement was limited by the dive basket and he was also

- tethered by an "umbilical" cord which limited the depth he could go in the pool.

The diver received an estimated 12 millirem of exposure about the same as a typical bone X-ray.

A number of repair options are undergoing engineering review.

Although the vacuum box tests did not reveal any leaks, Entergy will apply a protective coating on the small flaws along the weld seams.

Getting readyfor dive. Filephotofrom The next phase of the liner inspection will take more time and be first dive more difficult to complete since the video cameras will e tight clearances between the wall and the fuel racks. wil aU