MONTHYEARML24305A2002024-11-0404 November 2024 Pre-Submittal Meeting - St. Lucie, Unit 1 - Criticality Analysis for Transition to 24-Month Fuel Cycle (L-2023-LRM-0122) ML24099A2142024-04-10010 April 2024 Presentation Material for April 10th Presubmittal Meeting on Proposed 24 Month Cycle Submittal ML24073A3372024-03-13013 March 2024 NextEra - NRC Slides for the Public Meeting on March 19, 2024 Regarding Emergency Plan Licensing Amendment ML23124A3412023-05-0404 May 2023 FPL 2022 Public Meeting Slides ML21320A2612021-11-17017 November 2021 Supporting Information for Turkey Point and St. Lucie Improved Technical Specifications November 17, 2021, Public Meeting - List of Topics ML21302A0792021-11-0303 November 2021 November 3, 2021, St. Lucie Plant, Units 1 and 2, Subsequent License Renewal Application Public Environmental Scoping Meeting Slides ML21225A0012021-08-18018 August 2021 Preapplication Meeting Presentation Improved Technical Specifications Conversion ML21153A0522021-06-0202 June 2021 Psl SLRA Preapplication Meeting 06-03-21 ML21139A3002021-05-20020 May 2021 5-20-21 St. Lucie Plant, Units 1 & 2, Subsequent License Renewal Environmental Pre-Application Meeting Florida Power and Light Slides ML21111A0122021-04-21021 April 2021 Subsequent License Renewal Application - Pre-Application Meeting ML21109A0052021-04-19019 April 2021 2020 - Stl - Tpn Combined EOC Presentation ML21106A1692021-04-16016 April 2021 SLRA - NRC Presubmittal Meeting Slides ML20135F6652020-05-14014 May 2020 Stl - Tpn Combined EOC Presentation ML20080M1532020-02-21021 February 2020 PFHA-2020-3B-1-Hanna-Briefing_on_STL Flooding-rev0 ML18122A1502018-04-30030 April 2018 Pre-Submittal Meeting for St. Lucie Nuclear Plant, Unit 2 - Spent Fuel Pool Criticality Analyses - April 30, 2018 ML17072A3762017-03-21021 March 2017 Regulatory Conference on 3/21/2017 Licensee Presentation ML16097A1302016-04-0404 April 2016 March 29, 2016 Summary of Public Meeting - 2015 Annual Assessment Regarding Saint Lucie ML15086A2232015-03-27027 March 2015 Summary of Meeting Concerning the Annual Assessment of St. Lucie Nuclear Plant, Units 1 and 2 ML14174A4022014-06-24024 June 2014 6/24/2014, Pre-Submittal Meeting Slide for St. Lucie and Turkey Point Re. License Amendment Request Adoption of TSTF-505 Risk-Informed Completion Time ML14156A2132014-06-0404 June 2014 Public Meeting Summary - St. Lucie Nuclear Plant Docket Nos. 50-335 and 50-389 ML14147A4152014-05-29029 May 2014 Slide for 5/29/14 Meeting Re. Fuel Transition Project ML13107B4002013-04-17017 April 2013 Summary of Public Meeting, Florida Power & Light, St. Lucie Nuclear Plant ML13094A1912013-03-14014 March 2013 Meeting Handout - Results of Fall 2012 Inspection ML13094A1932013-03-14014 March 2013 Meeting Handout - Independent Operational Assessment ML13094A1812013-03-14014 March 2013 Meeting Handout - Operational Assessment for Cycle 20 ML12256A7462012-09-12012 September 2012 PRB Meeting with Saporito Petition Slides ML11251A0042011-09-13013 September 2011 9/13/11 Meeting Slides - Forthcoming Meeting with Florida Power and Light, St. Lucie Units 1 and 2, Regarding GL 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reac ML1111014572011-04-13013 April 2011 Annual Assessment Meeting Attendees ML1108206992011-03-22022 March 2011 3/22/11 Revised Pre-application Meeting Slides Regarding NFPA 805 License Amendment Request ML1107703492011-03-22022 March 2011 3/22/11 PRE-Application Meeting Slides Regarding NFPA 805 License Amendment Request ML1102604062011-01-11011 January 2011 FPL Meeting Summary Presentation Handouts IR 05000335/20100072010-11-17017 November 2010 Summary of Public Regulatory Performance Meeting with Florida Power and Light Company to Discuss Corrective Actions Associated with the Yellow Finding That Was Documented in the NRC Inspection Report IR 05000335-10-007 ML1023502322010-08-18018 August 2010 Extended Power Uprate (EPU) NRC Public Meeting ML1013202002010-05-0404 May 2010 Annual Assessment Meeting Presentation ML1011107312010-04-20020 April 2010 Handout for Meeting with Florida Power & Light to Discuss the Status of Fpl'S Employee Concerns Program (ECP) Improvement Initiatives. FPL Presentation on Nuclear Safety Culture ML1006011702010-02-26026 February 2010 Meeting Summary - Category 1 Public Meeting - Regulatory Conference with St. Lucie Nuclear Plant Regarding Issues with the Component Cooling Water - Docket Nos. 50-335 and 50-389 ML0912702272009-05-0404 May 2009 Hostile Action Based EP Drills - Elements of a Successful Demonstration ML0813304162008-05-12012 May 2008 Enclosure - St. Lucie Annual Assessment Meeting, Reactor Oversight Program - Cy 2007 ML0729806642007-10-24024 October 2007 Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits ML0701100272007-01-10010 January 2007 Notice of Meeting Handouts with FPL Adoption of AST at St. Lucie ML0612804882006-04-20020 April 2006 Meeting Summary Handouts for Public Meeting with Florida Power and Light St Lucie, Unit 2 Steam Generator Tube Inspection for the Cycle 16 Refueling Outage ML0611100722006-04-20020 April 2006 License Presentation Materials from Meeting with FPL Regarding SG Inspection at St. Lucie ML0610900352006-04-18018 April 2006 Meeting Slides St. Lucie Slides ML0603805612006-02-0606 February 2006 Meeting with FLP, Meeting Handouts, Proposed Submittal to Adopt Quality Assurance Topical Report ML0524500172005-09-0101 September 2005 Meeting with Florida Power & Light Company Regarding Increase in SG Tube Plugging at St. Lucie ML0406304312004-03-0303 March 2004 Powerpoint Presentation Slides for Meeting with Florida Power & Light Company Regarding Planned Power Uprate Request for Seabrook Station, Unit No. 1 ML0327206212003-09-24024 September 2003 Examiner - Vendor Matrix with Phone Number ML0327206112003-09-22022 September 2003 Exam Process ML0323700182003-08-14014 August 2003 & 08/21/03, Slides Presentation from Westinghouse Discussion on Increased Steam Generator Tube Plugging & Reload Methodology at St. Lucie Unit 2 ML0310806392003-04-17017 April 2003 FPL Presentation Slides Regarding Changes Needed to Support Increased Steam Generator Tube Plugging 2024-04-10
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24305A2002024-11-0404 November 2024 Pre-Submittal Meeting - St. Lucie, Unit 1 - Criticality Analysis for Transition to 24-Month Fuel Cycle (L-2023-LRM-0122) ML24103A1042024-04-25025 April 2024 St. Lucie/Turkey Point 2023 Annual Assessment Meeting Slides ML24099A2142024-04-10010 April 2024 Presentation Material for April 10th Presubmittal Meeting on Proposed 24 Month Cycle Submittal ML24073A3372024-03-13013 March 2024 NextEra - NRC Slides for the Public Meeting on March 19, 2024 Regarding Emergency Plan Licensing Amendment ML23310A1552023-11-0909 November 2023 Presentation Material (Slides) - Presubmittal Meeting - St. Lucie, Unit 2 - Criticality Analysis for Transition to 24-Month Fuel Cycle ML23124A3412023-05-0404 May 2023 FPL 2022 Public Meeting Slides ML22311A5332022-11-10010 November 2022 Presentation Material for Presubmittal Meeting (11/10/22) St. Lucie Nuclear Plant, Units 1 and 2 to Adopt 50.69 Risk-Informed Categorization and Treatment of Structures, Systems and Components ML22301A1662022-09-29029 September 2022 Presentation 4 - Recent Biennial PI&R Team Inspection Insights ML22110A2172022-05-0303 May 2022 Annual Assessment Meeting ML21302A0792021-11-0303 November 2021 November 3, 2021, St. Lucie Plant, Units 1 and 2, Subsequent License Renewal Application Public Environmental Scoping Meeting Slides ML21225A0012021-08-18018 August 2021 Preapplication Meeting Presentation Improved Technical Specifications Conversion ML21153A0522021-06-0202 June 2021 Psl SLRA Preapplication Meeting 06-03-21 ML21139A3002021-05-20020 May 2021 5-20-21 St. Lucie Plant, Units 1 & 2, Subsequent License Renewal Environmental Pre-Application Meeting Florida Power and Light Slides ML21139A3072021-05-20020 May 2021 5-20-21 St. Lucie Plant, Units 1 & 2 - Subsequent License Renewal Environmental Pre-Application Meeting NRC Slides ML21111A0122021-04-21021 April 2021 Subsequent License Renewal Application - Pre-Application Meeting ML21109A0052021-04-19019 April 2021 2020 - Stl - Tpn Combined EOC Presentation ML21106A1692021-04-16016 April 2021 SLRA - NRC Presubmittal Meeting Slides ML21076A6152021-03-22022 March 2021 NRC Pre-Submittal Meeting, St. Lucie and Turkey Point Nuclear Plants - Improved Technical Specification Conversion - March 22, 2021 (EPID L-2021-LRM-0032) (Presentation) ML20135F6652020-05-14014 May 2020 Stl - Tpn Combined EOC Presentation ML20080M1532020-02-21021 February 2020 PFHA-2020-3B-1-Hanna-Briefing_on_STL Flooding-rev0 ML18144A1452018-05-24024 May 2018 Public Meeting Summary - St. Lucie Nuclear Plant Docket Nos. 50-335 and 50-389 ML17310B2322017-11-0707 November 2017 Presentation Slides - NextEra Energy/Fpl - GSI-191 Issue Resolution, Pre-submittal Meeting, September 20, 2017 ML17072A3762017-03-21021 March 2017 Regulatory Conference on 3/21/2017 Licensee Presentation ML16097A1302016-04-0404 April 2016 March 29, 2016 Summary of Public Meeting - 2015 Annual Assessment Regarding Saint Lucie ML15086A2232015-03-27027 March 2015 Summary of Meeting Concerning the Annual Assessment of St. Lucie Nuclear Plant, Units 1 and 2 ML14174A4022014-06-24024 June 2014 6/24/2014, Pre-Submittal Meeting Slide for St. Lucie and Turkey Point Re. License Amendment Request Adoption of TSTF-505 Risk-Informed Completion Time ML14156A2132014-06-0404 June 2014 Public Meeting Summary - St. Lucie Nuclear Plant Docket Nos. 50-335 and 50-389 ML14147A4152014-05-29029 May 2014 Slide for 5/29/14 Meeting Re. Fuel Transition Project ML13107B4002013-04-17017 April 2013 Summary of Public Meeting, Florida Power & Light, St. Lucie Nuclear Plant ML13094A1912013-03-14014 March 2013 Meeting Handout - Results of Fall 2012 Inspection ML13094A1932013-03-14014 March 2013 Meeting Handout - Independent Operational Assessment ML13094A1812013-03-14014 March 2013 Meeting Handout - Operational Assessment for Cycle 20 ML12326A8162012-11-21021 November 2012 11/9/2012 - Summary of Meeting with the Florida Power and Light Company Regarding the St. Lucie Nuclear Plant ML1111014612011-04-13013 April 2011 Annual Assessment Meeting Slides ML1108206992011-03-22022 March 2011 3/22/11 Revised Pre-application Meeting Slides Regarding NFPA 805 License Amendment Request ML1107703492011-03-22022 March 2011 3/22/11 PRE-Application Meeting Slides Regarding NFPA 805 License Amendment Request ML1102604062011-01-11011 January 2011 FPL Meeting Summary Presentation Handouts IR 05000335/20100072010-11-17017 November 2010 Summary of Public Regulatory Performance Meeting with Florida Power and Light Company to Discuss Corrective Actions Associated with the Yellow Finding That Was Documented in the NRC Inspection Report IR 05000335-10-007 ML1023502322010-08-18018 August 2010 Extended Power Uprate (EPU) NRC Public Meeting ML1013202002010-05-0404 May 2010 Annual Assessment Meeting Presentation ML1011107312010-04-20020 April 2010 Handout for Meeting with Florida Power & Light to Discuss the Status of Fpl'S Employee Concerns Program (ECP) Improvement Initiatives. FPL Presentation on Nuclear Safety Culture ML1006011702010-02-26026 February 2010 Meeting Summary - Category 1 Public Meeting - Regulatory Conference with St. Lucie Nuclear Plant Regarding Issues with the Component Cooling Water - Docket Nos. 50-335 and 50-389 ML0930902742009-11-0505 November 2009 Summary of Public Meeting with Florida Power and Light Company to Discuss Processes for Addressing Employee Concerns. Slides (Enclosure 2) ML0924402562009-08-25025 August 2009 Slides from August 25, 2009 Meeting with Florida Power & Light ML0912702272009-05-0404 May 2009 Hostile Action Based EP Drills - Elements of a Successful Demonstration ML0813304162008-05-12012 May 2008 Enclosure - St. Lucie Annual Assessment Meeting, Reactor Oversight Program - Cy 2007 ML0734106732007-12-0707 December 2007 Florida Department of Environmental Protection Nuclear Presentation Slides, Nuclear Power in Florida. ML0729806642007-10-24024 October 2007 Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits ML0721104042007-07-25025 July 2007 Slides from Exercises 1 Thru 6 from the Generic Risk-Informed Inspection Notebook ML0701100272007-01-10010 January 2007 Notice of Meeting Handouts with FPL Adoption of AST at St. Lucie 2024-04-25
[Table view] |
Text
r f
FLORIDA POWER & LIGHT ST. LUCIE UNIT 2 STEAM GENERATOR INSPECTION PLANNING FOR SL2-16, APRIL 2006 St Lucie Unit 2 - Steam Generator Inspection Planning for SL2-16 AGENDA
. Purpose of Meeting
. Background & S/G Condition
. Projected Tube Plugging
. Summary & Closing 2
FPL 1
V St. Lucie Unit 2 - Steam Generator Inspection Planning for SL2-16 Purpose of Meeting
- Review SL2-15 Inspection Planning
- Address Staff Concerns St. Lucie Unit 2 - Steam Generator Inspection Planning for SL2-16 Background & S/G Condition
- CS Lattice Support System (eggcrates)
- Tubesheet Joint - Explosive
- SG A - 1469 (17.5%)
- SG B - 1709 (20.3%)
2
r St Lucie Unit 2 - Steam Generator Inspection Planning for SL2-16 Background & S/G Condition FPL Steam Generator Program
- Committed to Safe Operation
- Full Implementation of NEI 97-06, S/G Program Guidelines
' Inspection
' Chemistry Leak Monitoring
- Incorporate Industry Experience
- Extensive Examination History at Unit 2 XConservative Approach
&In Situ Pressure Test at Last 6 Inspections ,,- - -
FP 5 FPLop St. Lucie Unit 2 - Steam Generator Inspection Planning for SL2-16 Background & S/G Condition
- Last Inspection - SL2-15 in January 2005 a Results Discussed with NRR During Outage
' Damage Mechanisms Generally as Expected 1Tube Ding with ODSCC Limited PWSCC in Tubesheet (3in Upper 2", 1 at Tack Roll)
'Increase in Axial ODSCC at Eggcrate Supports
'RCL Indications Detected During Pull Out Scans
'Addressed in OA Model
'Tested with Qualified Technique if > .35 Volts
'No Tube Integrity Issues. A FPL 3
V St. Lucie Unit 2 - Steam Generator Inspection Planning for SL2-16 Indication Count Summary for SL2-15 Mechanism SIG A SIG B Total Axial ODSCC at Eggcrate Supports 1184 1266 2450 Axial ODSCC at Diagonal Supports 1 8 9 Axial ODSCC at Tube Dings 0 1 1 Axial ODSCC in Freespans 0 1 1 Axial ODSCC at Top of HL Tubesheet 14 2 16 Axial IDSCC Below Top of HL Tubesheet 1 1 2 Circ. ODSCC at Top of HL Tubesheet 7 10 17 Circ. IDSCC at Top of HL Tubesheet 0 1 1 Circ. IDSCC at HL Tube End 0 1 1 Wear Due to Foreign Objects 1 1 2 Wear at Diagonal & Vertical Supports 672 443 1115 Wear at Eggcrate Tube Supports 67 73 140 FPL St. Lucie Unit 2 - Steam Generator Inspection Planning for SL2-16 Background & S/G Condition TUBE PLUGGING HISTORY Damaae Mechanism (1) 4100 11101 4103 1105 OD Cracks at Tube Supports 14 259 482 1592 Mech. Wear at Tube Supports 18 11 1 OD Cracks at Tubesheet 17 20 27 20 Preservice, FO, Preventative 51 6 2 Circ. OD Cracks at Tubesheet 5 13 10 15 OD Volumetric - Various 2 ID Cracks in Tubesheet 4 3 OD Cracks at Dings 5 1 OD Cracks in Freespan _ 1 1 54 361 530 1635 Cumulative Plugging 652 1013 1543 3178 ,
Cumulative Percent 3.9% 6.0% 9.2% -1B.9%:..
'I (1) Axial unless noted otherwise a_ '8 ot-FPL 4
V St Lucie Unit 2 - Steam Generator Inspection Planning for SL2-16 Background & SIG Condition Benchmark of Predicted (best estimate) vs. Observed Indications Mechanism Case Predicted Observed Axial ODSCC at Eggcrates Worst SG 928 1217 Axial ODSCC at Tube Dings All SGs 2 1 Axial ODSCC at Transition All SGs 43 16 Axial IDSCC below Transition All SGs 15 2 Circ. ODSCC at Transition All SGs 25 17 FPL St. Lucie Unit 2 - Steam Generator Inspection Planning for SL2-16 Background & SIG Condition Probability of Burst (POB)
Mechanism SG A SIG B ODSCC' at E c029crats 0.0777 ODSCC at D)ings 0.00(Y O)SCC at Topofa-Tubcshect -0 Cumulatisv P0I3 0.0356
- Significant Axial Degradation Mechanisms
- Cycle 15 Length for 10% POB Criterion - 17.4 EFPM
- Cycle 15 Length for 5% POB Criterion - 16.2 EFPM _ o
- Planned Cycle 15 Length is -14.5 EFPM ,
FPLI S
-i St. Lucie Unit 2 - Steam Generator Inspection Planning for SL2-16 Background & S/G Condition In Situ Pressure Testing SL2-9 Through SL2-15
- 73 Total Indications (19 at SL2-15)
- Mechanisms Include Axial ODSCC at Eggcrates Axial ODSCC at Dings
'LAxial ODSCC at TTS
' Axial IDSCC below TTS Circ ODSCC at TTS
' Circ IDSCC at TTS OD Volumetric TTS
- No Leakage or Burst 5 .- - Bl y . ". . .
- 11 FPL St. Lucie Unit 2- Steam Generator Inspection Planning for SL2-16 SL2-16 Inspection Scope
- Visual Examination of All Tube Plugs
- Bobbin Probe All Active Tubes Screen Dings <5 Volts in Straight Sections
' Full Length Row 3-140, Straight Length Row 1-2
- Plus Point Probe 100% Hot Leg Top of Tubesheet (+3" /-13")
Cold Leg Periphery Tubes (+3"/-2")
20% Row 1-2 U-bends (A-23, B-25) 20% Wear at Vertical Straps (A-86, B-58)
' .00% Wear at Eggcrates, HL & CL Diagonals (A-274,;B-202)
Full Tubesheet if No Tube Expansion (A-21,-B-1) 1-FPL 6
I St Lucie Unit 2 - Steam Generator Inspection Planning for SL2-16 SL2-16 Inspection Scope (con't)
- Plus Point Probe for Dings SGA SGB
' All Dings Hot Leg Tubesheet to 1st Support 68 78
' All Dings >5 volts 1st Support to HL Bend 57 80 All Dings in HL & CL Square Bends Row 19-140 90 68
' All Dings >5 volts in Horizontal Run Row 19-140 71 102
' All Dings in Rows 1-18 U-Bends 113 89
' 20% Dings >5 volts CL Tubesheet to CL Bend 17 23 416 440
- In Situ Testing Based on Industry Screening Guidance FPL - 13 St. Lucie Unit 2 - Steam Generator Inspection Planning for SL2-16 Projected Tube Plugging Pr~dictdcNumbir PrchictedNurnm.r of Indliations at of Tub.. R*paired EO :i5 atE FOCIS Mochanismitocation SIG A SIG B SIG A SIC B Axial ODS('C at ls '.cratr Sulqxirts ILtwer 5t 21_00 2178 145S 1257 BLkt Estinlatc 2561 2331 1556 1345 tUppcr954% 2722 2485 165.1 1434 Aexial ODSCC Near TTS 30 I0 30 10 ircuinfermntial ODSCC2at 171S I 20 15 20 ANial I DSCC fICAow TriS 5 , S 5 C.irunircrcntiiil iScc. tcibw rrs s 5 S 5 Axi¶,l Oi)SCC at Dings 5 S 5 Best Estimate Cumulative Repairs -3050 -3075 Current Tube Plugging Limit 2520 .;252 :
FPL 14 7
I St. Lucie Unit 2 - Steam Generator Inspection Planning for SL2-16 Tube Sleeving Plans Westinghouse Alloy 800 Leak Limiting Sleeve
- 60-70% of Repairable Tubes are Candidates
- Maintain 30% Effective Tube Plugging Margin
- Contingency for 42% Tube Plugging
> Required Repairs Exceed Expectations
' Sleeving Field Effort Difficulties
- ' 15 FPL St. Lucie Unit 2 - Steam Generator Inspection Planning for SL2-16 Operating Experience
- Continue Emphasis on Dings/Dents &
Anomalous Indications
- Batwing Support Condition (Waterford)
- Fabrication Issues (Byron & Davis Besse)
- Tube to Tube Wear (Tube Sever)
' Susceptible Locations to be Reviewed by Lead Analysts
. -16 FPL 8
St. Lucie Unit 2 - Siteam Generator Inspection Plannin,g for SL2-16 Contingenc y Planning Issue or Inspection Item ContinQency Action Leaking Plug Replace as Necessary Crack in Row 1&2 U-bend Test 100% Affected Rows
& 20% Row 3, etc.
Crack in U-bend Wear Scar Test All (A-430, B-290)
Crack in Cold Leg Ding Test All (A-85, B-1 15)
Foreign Object Wear Bound FO Wear CL Expansion Transition Cracking Test 100% in Affected SG Freespan Cracking Validate Bobbin POD RCL Indications on Pull Out Scan Retest if >.35 Volts ,,,¢ <tws-7 17 FPL St. Lucie Unit 2 - Steam Generator Inspection Planning for SL2-16 Generic Letter 2006-01 Submit LAR to Adopt TSTF-449 By May 31, 2006
> Replacement SG Program
> Original SG Program
- Include Sleeving Repair Method
- Include Tubesheet Inspection Provisions (C*)
- Limit Pri-Sec Leakage to 108 gpd/SG
- Address Leakage Predictions for 1 7 Tubesheet & Sleeves 18 FPL ,es 9
I St. Lucie Unit 2 - Steam Generator Inspection Planning for SL2-16 Summary & Closing
- FPL Program Meets Industry Guidance
. Comprehensive Inspection Program
- Reasonable Assurance of Tube Integrity
- Compliance with Tech Specs & NRC Positions