MONTHYEARML24127A2402024-05-0707 May 2024 Presentation Slides for Prairie Island 2023 End-of-Cycle Meeting ML24029A0382024-01-31031 January 2024 January 31, 2024, Pre-application Meeting Presentation - Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions ML23168A0032023-06-20020 June 2023 Handout for 6/23/2023 Pre-Application Public Meeting with Prairie Island Nuclear Generating Plant to Revise ISFSI TS 4.4 for TN-40HT Casks ML23156A2602023-06-0505 June 2023 2022 Prairie Island End-of-Cycle Meeting Presentation ML23102A1752023-04-14014 April 2023 April 14, 2023 TS 3.7.8 LAR Pre-Submittal Meeting Slides ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22048B1812022-02-18018 February 2022 Pre-Application Meeting for Prairie Island TS 5.6.6, PTLR, LAR ML21221A0202021-08-11011 August 2021 Nis Pr Bypass Test Panel License Amendment Request ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML19347B0722019-12-12012 December 2019 TVA and Xcel Energy Slides for Joint Presubmittal Meeting to License Amendment Requests to Adopt WCAP-17661, Revision 1 ML19268A0422019-09-26026 September 2019 Pre-Application Meeting License Amendment Request Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19210D4512019-07-22022 July 2019 Abeyance Seal Preapplication Meeting Slides ML18051A1752018-02-20020 February 2018 Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy 2/20/2018 ML17240A3382017-08-30030 August 2017 Non-Safety Related Digital Feedwater and Amsac/Dss Control Systems Replacement Project Presentation ML17198A2632017-07-17017 July 2017 Pre-Application Meeting ML17066A3732017-03-0909 March 2017 Spent Fuel Pool Criticality Technical Specification Changes Round 2 Request for Additional Information Public Meeting: March 9, 2017 ML17037D1172017-02-0707 February 2017 License Amendment Requests for Change in Emergency Plan Staff Augmentation Response Times Pre-Submittal Meeting for Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant: February 7, 2017 ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML15140A3342015-05-13013 May 2015 Public Meeting 05132015 Licensee Slides Only ML15105A0372015-04-14014 April 2015 Xcel Energy Slide Presentation to Support Pre-Application Meeting on April 14, 2015, to Discuss Nuclear Fuel Design Transition to Include Integral Fuel Burnable Absorber (Ifba) at the Prairie Island Nuclear Generating Plant ML14323B0222014-11-19019 November 2014 Regcon, November 19-20, 2014: 03-Info-Session-2 Ronald Johnson - Tribal Perspective on Continued Storage ML14153A0242014-05-16016 May 2014 Xcel Energy'S Presentation Slides Supporting a May 16, 2014, Public Meeting to Discuss the Flood Hazard Reevaluation Schedule for the Monticello and Prairie Island Nuclear Generating Plants ML14058A1732014-02-19019 February 2014 Diesel Generator Steady State Voltage and Frequency Limits - Prairie Island Nuclear Generating Plant Meeting February 19, 2014 ML13210A2012013-07-29029 July 2013 2012 End-of-Cycle Slides - Licensee ML13210A2002013-07-11011 July 2013 2012 End-of-Cycle Slides ML13056A0262013-02-25025 February 2013 Regulatory Conference Slide Presentation ML12340A5402012-12-0606 December 2012 Reactor Core Cooling & Heat Removal FLEX Strategy - Phase 1 ML12326A9712012-11-21021 November 2012 Encl 3 (Handouts - Public) to Summary of October 24, 2012, Meeting with the Northern States Power Company, D/B/A Excel Energy Regarding Security Requirements and Changes Pertaining to Prairie Island TAC L24689 ML12277A1762012-10-0404 October 2012 Steam Generator Replacement Presentation ML12275A4652012-09-27027 September 2012 Meeting September 27, 2012 - Handouts ML12275A3782012-09-27027 September 2012 Xcel Energy Prairie Island Nuclear Generating Plant Meeting Presentation, Diesel Generator Voltage and Frequency Limits. ML12205A2172012-07-23023 July 2012 NRC 2011 End-of-Cycle Slides ML12205A2202012-07-17017 July 2012 Licensee 2012 End-of-Cycle Slides ML12115A3112012-04-24024 April 2012 Meeting Slides: 04/24/2012 Meeting with Xcel Energy NFPA 805 Presubmittal - Prairie Island Nuclear Generating Plant ML1207904792012-03-14014 March 2012 March 14, 2012 Telecon Slides ML1122803892011-08-18018 August 2011 Pre-Application Meeting for Prairie Island Nuclear Generating Plant (Ping) Extended Power Uprate (EPU) ML1119903462011-07-28028 July 2011 Meeting Presentation, Prairie Island Nuclear Generating Plant - Failure to Maintain the Train a and B Direct Current Electrical Power Subsystems Operable ML1117804242011-06-22022 June 2011 June 22, 2011, Meeting Handout #1 - NRC Meeting Diesel Fuel Oil LAR for Prairie Island Ngp ML1120701572011-06-22022 June 2011 June 22, 2011, Meeting Handout #2 - Proposed Technical Specification Changes for Prairie Island Ngp Diesel Fuel Oil LAR ML1106600792011-03-0303 March 2011 March 3, 2011 Meeting Handouts - Revise Footnote in TS 3.8.1, Prairie Island Nuclear Generating Plant ML1034701142010-12-14014 December 2010 Excel Energy Slides for Public Meeting 12/14/2010 to Discuss Human Performance Issues ML1027802642010-10-0404 October 2010 Session 4 - Heather Westra Presentation at October 4, 2010, Public Meeting on Groundwater Protection ML1023805712010-08-25025 August 2010 Meeting Presentation Alternative Source Term Steam Generator Tube Rupture Margin to Overfill Evaluation - Prairie Island Nuclear Generating Plant ML1014502432010-05-26026 May 2010 Responses to Questions from the Prairie Island Indian Community Concerning Issues Related to Prairie Island Nuclear Generating Plant ML1012604192010-05-20020 May 2010 Meeting Presentation Prairie Island Annual Assessment Meeting - Reactor Oversight Program - 2009 ML1012503422010-05-0505 May 2010 Regulatory Conference Slides ML1015801072010-04-28028 April 2010 2R26 Outage, SG Tube Inspection Telecon Slides ML1010604782010-04-15015 April 2010 April 15, 2010, Meeting Slides - Pre-Application Meeting for Prairie Island Ngp Extended Power Uprate ML0932901282009-12-0101 December 2009 Licensee Slides for Public Meeting 2024-05-07
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24127A2402024-05-0707 May 2024 Presentation Slides for Prairie Island 2023 End-of-Cycle Meeting ML24059A4042024-03-0606 March 2024 March 6, 2023, Presubmittal Meeting for License Amendment Request to Modify Technical Specifications Definitions & Approve Plant-Specific Methods for Response Time Testing (EPID L-2024-LRM-0034) - Slides ML24029A0382024-01-31031 January 2024 January 31, 2024, Pre-application Meeting Presentation - Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions ML23168A0032023-06-20020 June 2023 Handout for 6/23/2023 Pre-Application Public Meeting with Prairie Island Nuclear Generating Plant to Revise ISFSI TS 4.4 for TN-40HT Casks ML23156A2602023-06-0505 June 2023 2022 Prairie Island End-of-Cycle Meeting Presentation ML23102A1752023-04-14014 April 2023 April 14, 2023 TS 3.7.8 LAR Pre-Submittal Meeting Slides ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22048B1812022-02-18018 February 2022 Pre-Application Meeting for Prairie Island TS 5.6.6, PTLR, LAR ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21124A0652021-05-0606 May 2021 Xcel Energy Presentation for May 6, 2021 Public Meeting to Discuss 24-Month Cycles at Prairie Island Nuclear Generating Plant, Units 1 and 2 ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML20266F1052020-09-23023 September 2020 (PINGP) COVID-19 Exemption Request for the 2020 Biennial Emergency Preparedness Exercise ML20212L8622020-07-29029 July 2020 2019 Monticello and Prairie Island EOC Presentation from Webinar ML20098F0682020-04-0909 April 2020 Preapplication Teleconference Presentation: License Amendment Request to Adopt TSTF-569 ML20057D3082020-02-18018 February 2020 Slides Potential License Amendment to Remove Note from LCO 3.4.12 and LCO 3.4.13 ML19268A0422019-09-26026 September 2019 Pre-Application Meeting License Amendment Request Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19210D4512019-07-22022 July 2019 Abeyance Seal Preapplication Meeting Slides ML19071A2782019-03-0707 March 2019 Enclosure 3: Meeting Slides (Summary of February 28, 2019, Public Meeting with Xcel Energy to Discuss Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island ISFSI (W/Enclosures 1 and 2)) ML18162A0262018-06-12012 June 2018 License Amendment Request to Reclassify Certain Fuel Handling Equipment ML18051A1752018-02-20020 February 2018 Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy 2/20/2018 ML17240A3382017-08-30030 August 2017 Non-Safety Related Digital Feedwater and Amsac/Dss Control Systems Replacement Project Presentation ML17209A1192017-07-17017 July 2017 Summary of July 17, 2017, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request Related to Heavy Lifting Devices ML17198A2632017-07-17017 July 2017 Pre-Application Meeting ML17066A3732017-03-0909 March 2017 Spent Fuel Pool Criticality Technical Specification Changes Round 2 Request for Additional Information Public Meeting: March 9, 2017 ML17037D1172017-02-0707 February 2017 License Amendment Requests for Change in Emergency Plan Staff Augmentation Response Times Pre-Submittal Meeting for Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant: February 7, 2017 ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML16280A0372016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711) - Figure 2 of 3 ML16280A0422016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711) - Figure 3 of 3 ML16280A0352016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711) - Figure 1 of 3 ML15140A3342015-05-13013 May 2015 Public Meeting 05132015 Licensee Slides Only ML15127A6562015-05-0707 May 2015 PI EOC Mtg NRC Slides ML15105A0372015-04-14014 April 2015 Xcel Energy Slide Presentation to Support Pre-Application Meeting on April 14, 2015, to Discuss Nuclear Fuel Design Transition to Include Integral Fuel Burnable Absorber (Ifba) at the Prairie Island Nuclear Generating Plant ML14323B0222014-11-19019 November 2014 Regcon, November 19-20, 2014: 03-Info-Session-2 Ronald Johnson - Tribal Perspective on Continued Storage ML14162A5202014-06-11011 June 2014 Slides: Prairie Island Independent Spent Fuel Storage Installation - License Renewal Application - Discussion of Requests for Additional Information, for June 16, 2014, Public Meeting ML14153A0242014-05-16016 May 2014 Xcel Energy'S Presentation Slides Supporting a May 16, 2014, Public Meeting to Discuss the Flood Hazard Reevaluation Schedule for the Monticello and Prairie Island Nuclear Generating Plants ML14084A3242014-03-21021 March 2014 M140321: Slides - Presented by Multiple Participants at Commission Briefing on Waste Confidence Rulemaking ML13210A2012013-07-29029 July 2013 2012 End-of-Cycle Slides - Licensee ML13210A2002013-07-11011 July 2013 2012 End-of-Cycle Slides ML13056A0262013-02-25025 February 2013 Regulatory Conference Slide Presentation ML12340A5402012-12-0606 December 2012 Reactor Core Cooling & Heat Removal FLEX Strategy - Phase 1 ML12326A9712012-11-21021 November 2012 Encl 3 (Handouts - Public) to Summary of October 24, 2012, Meeting with the Northern States Power Company, D/B/A Excel Energy Regarding Security Requirements and Changes Pertaining to Prairie Island TAC L24689 ML12277A1762012-10-0404 October 2012 Steam Generator Replacement Presentation ML12275A3782012-09-27027 September 2012 Xcel Energy Prairie Island Nuclear Generating Plant Meeting Presentation, Diesel Generator Voltage and Frequency Limits. ML12205A2172012-07-23023 July 2012 NRC 2011 End-of-Cycle Slides ML12205A2202012-07-17017 July 2012 Licensee 2012 End-of-Cycle Slides ML12115A3112012-04-24024 April 2012 Meeting Slides: 04/24/2012 Meeting with Xcel Energy NFPA 805 Presubmittal - Prairie Island Nuclear Generating Plant ML1207904792012-03-14014 March 2012 March 14, 2012 Telecon Slides ML1122803892011-08-18018 August 2011 Pre-Application Meeting for Prairie Island Nuclear Generating Plant (Ping) Extended Power Uprate (EPU) ML1119903462011-07-28028 July 2011 Meeting Presentation, Prairie Island Nuclear Generating Plant - Failure to Maintain the Train a and B Direct Current Electrical Power Subsystems Operable ML1117804242011-06-22022 June 2011 June 22, 2011, Meeting Handout #1 - NRC Meeting Diesel Fuel Oil LAR for Prairie Island Ngp 2024-05-07
[Table view] |
Text
Prairie Island Annual Assessment Meeting Reactor Oversight Program - CY 2005 Nuclear Regulatory Commission - Region III Welch, MN.
April 12, 2006
Purpose of Todays Meeting A public forum for discussion of the licensees performance NRC will address the licensee performance issues identified in the annual assessment letter Licensee will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance
Agenda z Introduction z Review of Reactor Oversight Process z National Summary of Plant Performance z Discussion of Plant Performance Results z Licensee Response and Remarks z NRC Closing Remarks z Break z NRC available to address public questions
Region III Organization James Caldwell Regional Administrator Geoff Grant Deputy Regional Administrator Mark Satorius Cynthia Pederson Director Division of Reactor Projects Director Division of Reactor Safety Steve West Anne Boland Deputy Director Deputy Director Richard Skokowski Regional Specialists Branch Chief Prairie Island Project Engineer Resident Inspectors Desiree Smith John Adams Duane Karjala
NRC Representatives z Mahesh Mac Chawla, Project Manager, NRR
- (301) 415-8371 z John Adams, Senior Resident Inspector
- (651) 388-8209 z Duane Karjala, Resident Inspector
- (651) 388-8209 z Desiree Smith, Project Engineer
- (630) 829-9500 z Richard Skokowski, Branch Chief
- (630) 829-9620
NRC Performance Goals z Safety: Ensure protection of the public health and safety and the environment z Security: Ensure the secure use and management of radioactive materials z Openness: Ensure openness in our regulatory process z Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely z Management: Ensure excellence in agency management to carry out the NRC strategic objective
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response
Examples of Baseline Inspections z Equipment Alignment ~80 hrs/yr z Triennial Fire Protection ~200 hrs every 3 yrs z Operator Response ~125 hrs/yr z Emergency Preparedness ~80 hrs/yr z Rad Release Controls ~110 hrs every 2 yrs z Worker Radiation Protection ~90 hrs/yr z Corrective Action Program ~250 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr
Significance Threshold Performance Indicators Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very Low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue
Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
National Summary of Plant Performance Status at End of CY 2005 Licensee Response 84 Regulatory Response 12 Degraded Cornerstone 4 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total 103
National Summary z Performance Indicator Results (at end of CY 2005)
Green 1850 White 4 Yellow 0 Red 0 z Total Inspection Findings (CY 2005)
Green 849 White 10 Yellow 1 Red 0
Prairie Island Assessment Results (Jan 1 - Dec 31, 2005) z Licensee Response Action Matrix Column with no greater than green findings/PIs z No supplemental inspections were conducted z With assistance from regional inspectors the residents reported a total of eighteen (18) findings of very low safety significance (GREEN)
Prairie Island Inspection Activities (Jan 1 - Dec 31, 2005)
There was one refueling outage for Unit 2 from May 5 thru 31 which involved the replacement of the reactor vessel head
Prairie Island Inspection Activities (Jan 1 - Dec 31, 2005)
A Safety System Design and Performance Capability inspection (SSDPC) was performed in June A Heat Sink Biennial inspection was conducted in July A Problem Identification and Resolution (PI&R) was conducted in August
Prairie Island Annual Assessment Summary January 1 - December 31, 2005 z NMC operated Prairie Island Units 1 & 2 in a manner that preserved public health and safety z All cornerstone objectives were met. All findings were of very low safety significance (GREEN) z NRC plans baseline inspections at Prairie Island for the remainder of the assessment period
Licensee Response and Remarks Tom Palmisano Site Vice President Prairie Island Power Station
Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:
(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov Select What We Do for Public Affairs
Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free)