MONTHYEARML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule IR 05000266/20234022023-11-14014 November 2023 Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402 ML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval IR 05000266/20230032023-10-16016 October 2023 Integrated Inspection Report 05000266/2023003 and 05000301/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023 License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23243A9102023-09-0606 September 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors IR 05000266/20235012023-08-29029 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000266/2023501 and 05000301/2023501 ML23208A2262023-08-28028 August 2023 Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026) - Letter ML23208A0952023-08-28028 August 2023 Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach IR 05000266/20230052023-08-24024 August 2023 Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) ML23160A0642023-08-21021 August 2023 Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring System L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023 Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections IR 05000266/20230022023-07-18018 July 2023 Integrated Inspection Report 05000266/2023002 and 05000301/2023002 IR 05000266/20234012023-07-13013 July 2023 Public-Point Beach Nuclear Plant-Security Baseline Inspection Report 05000266/2023401; 05000301/2023401; Independent Spent Fuel Storage Security Inspection Report 07200005/2023401 L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval2023-06-27027 June 2023 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval ML23171B1062023-06-21021 June 2023 Info Meeting with a Question and Answer Session to Discuss NRC 2022 EOC Plant Performance Assessment of Ptbh, Units 1 and 2 ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-022023-06-0909 June 2023 Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response2023-06-0101 June 2023 Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response ML23103A1332023-06-0101 June 2023 Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal ML23118A1762023-05-0404 May 2023 Audit Summary for License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue 191 IR 05000266/20230012023-05-0101 May 2023 Integrated Inspection Report 05000266/2023001 and 05000301/2023001 ML23114A1222023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-2023-058, 2022 Annual Monitoring Report2023-04-10010 April 2023 2022 Annual Monitoring Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications 2024-02-05
[Table view] Category:Safety Evaluation
MONTHYEARML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval ML23208A0952023-08-28028 August 2023 Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach ML23160A0642023-08-21021 August 2023 Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring System ML23103A1332023-06-0101 June 2023 Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22193A1142022-09-12012 September 2022 Issuance of Amendment Nos. 270 and 272 Elimination of the Requirements to Maintain the Post-Accident Sampling System ML22140A1272022-05-25025 May 2022 Subsequent License Renewal Application Safety Evaluation Revision 1 Public ML22041A3342022-02-23023 February 2022 Transmittal Letter for Point Beach Final SE for SLRA Review to AA La 2-9 (3) ML22054A1082022-02-23023 February 2022 Subsequent License Renewal Application Safety Evaluation Public ML21148A2552021-07-21021 July 2021 Issuance of Amendment Nos. 269 and 271 Technical Specification Changes to Implement New Surveillance Methods for Transient Heat Flux Hot Channel Factor ML20363A1762021-02-23023 February 2021 Issuance of Amendment Nos. 268 and 270 Regarding Tornado Missile Protection Licensing Basis ML20241A0582020-09-25025 September 2020 Issuance of Amendment No. 267 for One-Time Extension of License Condition 4.I, Containment Building Construction Truss (EPID L-2020-LLA-0180 (COVID-19)) ML20036F2612020-03-0404 March 2020 Approval of Relief Request 1-RR-13 and 2-RR-13 Regarding Extension of Inspection Interval for Point Beach Unit 1 and Unit 2 Reactor Pressure Vessel Welds from 10 to 20 Years ML19357A1952020-02-10010 February 2020 Unit No.1; & Turkey Point Nuclear Generating Unit Nos. 3 & 4 - Issuance of Amendments Nos. 265, 268, 164, 290, and 284 Revise Technical Specifications to Adopt TSTF-563 ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19339H7472019-12-13013 December 2019 Approval of Relief Request 2-RR-17 Regarding Steam Generator Primary Nozzle Dissimilar Metal Welds Inspection Interval ML19064A9042019-04-25025 April 2019 Issuance of Amendments to Extend Containment Leakage Rate Test Frequency ML19052A5442019-03-27027 March 2019 Issuance of Amendments 264 and 267 to Adopt TSTF-547, Clarification of Rod Position Requirements ML18289A3782018-11-26026 November 2018 Issuance of Amendments to Adopt Title 10 of Code of Federal Regulations 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML18079A0452018-06-13013 June 2018 Issuance of Amendments Revision to the Point Beach Nuclear Plant Emergency Action Level Scheme (CAC Nos. MF9859 and MF9860 EPID L-2017-LLS-0278) ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML17159A7782017-07-27027 July 2017 Issuance of Amendment to Approve H*: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17039A3002017-02-22022 February 2017 Issuance of Amendments -Removal of Completed License Conditions and Changes to the Ventilation Filter Testing Program ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16241A0002016-09-23023 September 2016 Mitigating Strategies and Spent Fuel Pool Instrumentation Safety Evaluation ML16196A0932016-09-0808 September 2016 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48 (C) ML16118A1542016-06-17017 June 2016 Issuance of Amendments ML16063A0582016-03-22022 March 2016 Approval of Relief Request 2-RR-11; Steam Generator Nozzle to Safe-End Dissimilar Metal (DM) Weld Inspection ML16035A5092016-03-0909 March 2016 Correction of Typographical Error in Safety Evaluation Associated with License Amendment Nos. 238 and 242 ML15293A4572015-11-25025 November 2015 Issuance of Amendments for the Steam Generator Technical Specifications, to Reflect Adoption of TSTF-510 ML15246A3052015-09-16016 September 2015 Evaluation of Relief Request RR-10 - Examination of Feedwater Nozzle Extension to Nozzle Weld Fifth 10-Year Inservice Program Interval ML15195A2012015-07-28028 July 2015 Issuance of Amendments Regarding Relocation of Surveillance Frequencies to Licensee Control ML15155A5392015-07-14014 July 2015 Issuance of Amendments Concerning Extension of Cyber Security Plan Milestone 8 ML15161A5352015-06-24024 June 2015 Relief Request VR-01; Alternatives to Certain Inservice Testing Requirements of the American Society of Mechanical Engineers (ASME) Code of Operation and Maintenance of Nuclear Power Plants ML15127A2912015-05-20020 May 2015 Relief Request RR-8, Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for Examination of Buried Components ML15099A0182015-05-0707 May 2015 Relief Request RR-9, Proposed Alternative from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for System Leakage Test ML15014A2492015-01-27027 January 2015 Issuance of Amendments to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008-01, Managing Gas Accumulation (Tac Nos. MF4353 and MF4354) ML14343A0512014-12-10010 December 2014 Relief from the Requirements of the ASME Code for Re-Examination of the Reactor Pressure Vessel a Inlet Nozzle Weld for the Fifth Ten-Year Inservice Inspection Program Interval ML14293A0022014-10-21021 October 2014 Issuance of Safety Evaluation Regarding Relief Request RR-5 ML14126A3782014-06-30030 June 2014 Issuance of License Amendment Nos. 250 and 254 Regarding Change to Technical Specification 5.6.5, Reactor Coolant System Pressure and Temperature Limits Report ML14058B0292014-05-0909 May 2014 Issuance of Amendment Nos. 249 and 253 Regarding Use of Optimized Zirlo Fuel Cladding Material ML14014A2052014-01-30030 January 2014 Issuance of Relief Request Regarding Risk-Informed Inservice Inspection Program for the Fifth 10-Year Inservice Inspection Interval ML13329A0422013-12-20020 December 2013 Relief from the Requirements of ASME Code, Section XI, for the Fourth 10-Year Inservice Inspection Interval (RR-4L3) ML13329A0312013-12-20020 December 2013 Relief from the Requirements of ASME B&PV Code, Section XI, for the Fourth 10-Year ISI Interval (RR-4L1) ML13346A0402013-12-18018 December 2013 Relief from the Requirements of ASME Code, Section XI, for the Fourth 10-Year Inservice Inspection Interval (RR-4L2) ML13135A2712013-05-29029 May 2013 Safety Assessment in Response to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML13064A4252013-03-18018 March 2013 Relief Request 1-RR-4 Re-Examination of the Unit 1 RPV Indication on the a Inlet Nozzle Weld ML12362A0092013-01-29029 January 2013 Issuance of License Amendment Nos. 248 and 252 Operations Manager Qualification Requirements ML12251A1552012-11-23023 November 2012 Issuance of Amendment to Renewed Facility Operating License Revised Cyber Security Plan Implementation Schedule Milestone 6 2024-01-23
[Table view] |
Text
May 4, 2006 Mr. Dennis L. Koehl Site Vice President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - RESPONSE TO REQUEST TO USE SUBSEQUENT EDITION AND ADDENDA OF AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) CODE FOR INSERVICE TESTING (TAC NOS. MC9783 AND MC9784)
Dear Mr. Koehl:
By letter dated January 20, 2006, Nuclear Management Company, LLC (NMC, the licensee) submitted a request for approval to use portions of a later edition and addenda of the ASME Code for Operation and Maintenance of Nuclear Power Plants (OM Code) for the inservice testing (IST) program at Point Beach Nuclear Plant, Units 1 and 2 (PBNP). Specifically, approval was requested to apply the portions of the requirements of Subarticle ISTC-3540, Manual Valves, of the 1999 Addenda of the ASME OM Code related to IST of manually operated valves. NMC requested approval through the end of the current (4th) IST interval, which ends on August 31, 2012, for Unit 1, and September 30, 2012, for Unit 2.
Consistent with the requirements set forth in 10 CFR 50.55a(f)(4)(iv), the Nuclear Regulatory Commission (NRC) staff has reviewed your request and has determined that all regulatory provisions were adequately addressed for PBNP. Therefore, pursuant to 10 CFR 50.55a(f)(4)(iv), the NRC staff approves the use of Subarticle ISTC-3540 of the 1999 Addenda of the ASME OM Code for exercising manual valves at Point Beach, subject to the limitations and modifications listed in 10 CFR 50.55a(b)(3)(vi), through the duration of the PBNP 4th IST intervals, which are scheduled to end on August 31, 2012, for Unit 1 and September 30, 2012, for Unit 2.
D. Koehl The detailed results of the NRC staffs review are provided in the enclosed safety evaluation. If you have any questions concerning this matter, please call Mr. Carl F. Lyon of my staff at (301) 415-2296.
Sincerely,
/RA/
L. Raghavan, Chief Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
Enclosure:
As stated cc w/encl: See next page
D. Koehl The detailed results of the NRC staffs review are provided in the enclosed safety evaluation. If you have any questions concerning this matter, please call Mr. Carl F. Lyon of my staff at (301) 415-2296.
Sincerely,
/RA/
L. Raghavan, Chief Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION:
PUBLIC LPL3-1 R/F RidsNrrPMFLyon RidsNrrLADClarke RidsNrrDorlLpl3-1 RidsOgcRp RidsAcrsAcnwMailCenter SLee RidsNrrDorlDpr PLouden, RIII OYee ADAMS Accession Number: ML061080655 *SE dated 4/12/06 OFFICE NRR/LPL3-1/PM NRR/LPL3-1/LA NRR/CPTB/BC OGC NRR/LPL3-1/BC NAME FLyon:rsa DClarke SLee* PMoulding LRaghavan DATE 4/25/06 4/25/06 4/12/06 5/3/06 5/4/06 OFFICIAL RECORD COPY
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE FOURTH 10-YEAR INTERVAL INSERVICE TESTING PROGRAM REQUEST FOR RELIEF NUCLEAR MANAGEMENT COMPANY, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-266 AND 50-301
1.0 INTRODUCTION
By letter dated January 20, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML060380566), Nuclear Management Company, LLC (NMC, the licensee) submitted a request for approval to use portions of a later edition and addenda of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) for the inservice testing (IST) program at Point Beach Nuclear Plant, Units 1 and 2 (PBNP). Specifically, approval was requested to apply the portions of the requirements of Subarticle ISTC-3540, Manual Valves, of the 1999 Addenda of the ASME OM Code related to IST of manually operated valves. NMC requested approval through the end of the current (4th) IST interval, which ends on August 31, 2012, for Unit 1, and September 30, 2012, for Unit 2.
2.0 REGULATORY EVALUATION
Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, requires that IST of certain ASME Code Class 1, 2, and 3 pumps and valves be performed at 120-month (10-year)
IST program intervals in accordance with the specified ASME Code incorporated by reference in the regulations, except where alternatives have been authorized or relief has been requested by the licensee and granted by the Commission pursuant to paragraphs (a)(3)(i), (a)(3)(ii), or (f)(6)(i) of 10 CFR 50.55a. In accordance with 10 CFR 50.55a(f)(4)(ii), licensees are required to comply with the requirements of the latest edition and addenda of the ASME Code incorporated by reference in the regulations 12 months prior to the start of each 120-month IST program interval. In accordance with 50.55a(f)(4)(iv), IST of pumps and valves may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in 10 CFR 50.55a(b), subject to Nuclear Regulatory Commission (NRC) approval. Portions of editions or addenda may be used provided that all related requirements of the respective editions and addenda are met.
ENCLOSURE
The NRCs findings with respect to granting or denying the IST program request from NMC are given below:
3.0 TECHNICAL EVALUATION
3.1 Code Requirements The applicable Code of record for PBNP is the ASME OM Code, 1995 Edition with 1996 Addenda. This Code requires that active function manual valves be exercised on a quarterly basis.
3.2 Licensees Basis for Requesting Relief The requirement in 10 CFR 50.55a(f)(4)(iv) states that IST of pumps and valves may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in 10 CFR 50.55a(b), subject to the limitations and modifications listed in Paragraph (b) of 10 CFR50.55a, and subject to NRC approval. Portions of editions and addenda may be used, provided that all related requirements of the respective editions or addenda are met.
3.3 Licensees Proposed Alternative Testing Portions of the 1999 Addenda of the ASME OM Code relate to the IST of manually operated valves. Federal Register Volume 67, Number 187, dated September 26, 2002 (67 FR 60520),
incorporates by reference the 1997 Addenda, 1998 Edition, 1999 Addenda, and 2000 Addenda of the ASME OM Code for the IST programs in 10 CFR 50.55a(b).
Specifically, the requirements of ISTC-3540, Manual Valves, 1999 Addenda state:
ISTC-3540 Manual Valves. Manual valves shall be full-stroke exercised at least once every 5 years, except where adverse conditions may require the valve to be tested more frequently to ensure operational readiness. Any increased testing frequency shall be specified by the owner. The valve shall exhibit the required change of obturator position.
The licensee proposes to apply ISTC-3540 to all active function manual valves in the IST program at PBNP. In accordance with the limitation imposed by 10 CFR 50.55a(b)(3)(vi),
manual valves must be exercised on a 2-year interval rather than 5-year interval specified in paragraph ISTC-3540 of the 1999 Addenda through the latest edition and addenda, provided that adverse conditions do not require more frequent testing. The licensee states that adverse conditions have not been observed for manual valves within the scope of the IST program.
Therefore, a test exercise interval of less than 2 years would not be required.
3.4 NRC Staff Evaluation The licensee has requested approval to exercise manual valves in accordance with Subarticle ISTC-3540 of the 1999 Addenda of the ASME OM Code. The licensee also further acknowledged the requirement to test the manual valves consistent with the limitation imposed by 10 CFR 50.55a(b)(3)(vi), on a 2-year interval rather than the 5-year interval specified in the
2001 Edition and 2003 Addenda of the ASME OM Code, provided that adverse conditions (as defined in subsection ISTC) do not require more frequent testing. The NRC staff has identified no additional related requirements in the specified ASME Code Edition and Addenda that need to be met in order to implement the requested Subarticle ISTC-3540.
4.0 CONCLUSION
Consistent with the requirements set forth in 10 CFR 50.55a(f)(4)(iv), the NRC staff has reviewed the request and has determined that all regulatory provisions were adequately addressed for PBNP. Therefore, pursuant to 10 CFR 50.55a(f)(4)(iv), the NRC staff approves the use of Subarticle ISTC-3540 of the 1999 Addenda of the ASME OM Code for exercising manual valves at PBNP, subject to the limitations and modifications listed in 10 CFR 50.55a(b)(3)(vi), through the duration of the PBNP 4th IST intervals, which are scheduled to end on August 31, 2012, for Unit 1, and September 30, 2012, for Unit 2.
Principal Contributor: O. Yee Date: May 4, 2006
Point Beach Nuclear Plant, Units 1 and 2 cc:
Jonathan Rogoff, Esquire Mr. Jeffery Kitsembel Vice President, Counsel & Secretary Electric Division Nuclear Management Company, LLC Public Service Commission of Wisconsin 700 First Street P.O. Box 7854 Hudson, WI 54016 Madison, WI 53707-7854 Mr. F. D. Kuester Nuclear Asset Manager President & Chief Executive Officer Wisconsin Electric Power Company WE Generation 231 West Michigan Street 231 West Michigan Street Milwaukee, WI 53201 Milwaukee, WI 53201 Michael B. Sellman Regulatory Affairs Manager President and Chief Executive Officer Point Beach Nuclear Plant Nuclear Management Company, LLC Nuclear Management Company, LLC 700 First Street 6610 Nuclear Road Hudson, MI 54016 Two Rivers, WI 54241 Douglas E. Cooper Mr. Ken Duveneck Senior Vice President - Group Operations Town Chairman Palisades Nuclear Plant Town of Two Creeks Nuclear Management Company, LLC 13017 State Highway 42 27780 Blue Star Memorial Highway Mishicot, WI 54228 Covert, MI 49043 Chairman Site Director of Operations Public Service Commission Nuclear Management Company, LLC of Wisconsin 6610 Nuclear Road P.O. Box 7854 Two Rivers, WI 54241 Madison, WI 53707-7854 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4351 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 November 2005