ML061080518

From kanterella
Jump to navigation Jump to search
Technical Requirements Manual, Volume I
ML061080518
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/06/2006
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML061080518 (8)


Text

DETROIT EDISON -

FERMI 2 AUTOMATED RECOPi.IANAGEMENT DISTRIBUTION CONTROL LIST 04/06/06 To: 003935 US NRC DOCUMENT CNTRL DESK PAGE 1

WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 80 1

IR 04/06/06 AFC Please destroy or mark all revised, superseded, or cancelled documents as such.

CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: e58683 4*-CDI

LICENSING DNCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 80 dated 4/05/06 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 79 has been inserted prior to inserting these pages.

Location Remove Insert In Front of TRM Manual Title Pagze Rev 79 03/16/06 Title Page Rev 80 4/05/06 Immediately following Title Page List of Effective Pages LEP-1 through LEP-4 Rev 79 03/16/06 List of Effective Pages LEP-1 through LEP-4 Rev 80 04/05/06 3.9 Refueling Operations Page TRM 3.9-3 Rev 31 10/99 Page TRM 3.9-3 Rev 80 04/06 END

Fermi.2 Technical Requirements Manual Volume I Detroit Edison ARMS-XNFORAM TION DTC:TMTRM T File: 1754 DSNR TRM VOLW Rev: 80 Date 04/05/2006 I Recipient C4,

FERMI 2 -

TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRN TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM iiiii iv v

'vi 1.0-a 1.0-1 2.0-1 3.0-a 3.0-1 3.0-2 3.0-3 3.0-4 3.1-a 3.1-1 3.2-1 3.3-a 3.3-b 3.3-c 3.3-d 3.3-1 3.3-2 3.3-3 3.3-4 3.3-5 3.3-6 3.3-7 3.3-8 3.3-9 3.3-10 3.3-11 3.3-12 3.3-13 3.3-13a 3.3-14 3.3-15 3.3-16 3.3-17 3.3-18 3.3-19 3.3-20 3.3-21 3.3-22 3.3-23 3.3-24 3.3-25 3.3-2 6 3.3-27 3.3-28 3.3-29 3.3-30 Revision 76 Revision 73 Revision 31 Revision 76 Revision 79 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 63 Revision 72 Revision 54 Revision 72 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 34 Revision 59 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 67 Revision 74 Revision 67 Revision 67 Revision 31 Revision 31 Revision 31 Revision 52 Revision 31 Revision 31 Revision 59 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 76 Revision 76 Revision 31 TRM 3.3-31 TRM 3.3-32 TRM 3.3-33 TEN 3.3-34 TRM 3.3-35 TRM 3.3-36 TRM 3.3-37 TRM 3.3-38 TRM 3.3-39 TRM 3.3-40 TRM 3.3-41 TRM 3.3-42 TRM 3.3-43 TRM 3.3-44 TRM 3.3-45 TRM 3.3-46 TRM 3.3-47 TRM 3.3-48 TRM 3.3-49 TRM 3.4-a TRM 3.4-1 TRM 3.4-la TRM 3.4-lb TRM 3.4-2 TRM 3.4-3 TRM 3.4-4 TRM 3.4-5 TRM 3.4-6 TRM 3.4-7 TRM 3.4-8 TRM 3.4-9 TRM 3.4-10 TRM 3.5-1 TRM 3.6-a TRM 3.6-1 TRM 3.6-2 TRM 3.6-3 TRM 3.6-4 TRM 3.6-5 TRM 3.6-6 TRM 3.6-7 TRM 3.6-8 TRM 3.6-9 TRM 3.6-10 TRM 3.6-11 TRM 3.6-12 TRM 3.6-13 TRM 3.6-14 TRM 3.6-15 TRM 3.6-16 TRM 3.6-17 TRM 3.6-18 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 33.

31.

32.

31.

6C 42.

7i 32.

32.

BE SE 4E 6i 7i 32.

31 31 31 31 31 36 71 71 31 31 31 31 31 31 31 31 31 31 70 60 67 31 55 31 33 31 31 66 31 31 31 71 31 31 31 31 31 TRM Vol. I LEP-1 REV 80 04/05/06

FERMI 2 -

TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-19 TRM 3.6-20 TRM 3.6-21 TRM 3.6-22 TRM 3.6-23 TRM 3.6-24 TRM 3.6-25 TRM 3.6-26 TRM 3.6-27 TRM 3.6-28 TRM 3.6-29 TRM 3.6-30 TRM 3.6-31 TRM 3.6-32 TRM 3.6-33 TRM 3.6-34 TRM 3.6-35 TRM 3.7-a TRM 3.7-b TRM 3.7-1 TRM 3.7-2 TRM 3.7-3 TRM 3.7-4 TRM 3.7-5 TRM 3.7-6 TRM 3.7-7 TRM 3.7-8 TRM 3.7-9 TRM 3.7-10 TRM 3.7-11 TRM 3.7-12 TRM 3.7-13 TRM 3.7-14 TRM 3.7-15 TRM 3.7-16 TRM 3.7-17 TRM 3.7-18 TRM 3.7-19 TRM 3.7-20 TRM 3.8-a TRM 3.8-1 TRM 3.8-2 TRM 3.8-3 TRM 3.8-4 TRM 3.8-5 TRM 3.8-6 TRM 3.8-7 TRM 3.8-8 TRM 3.8-9 TRM 3.8-10 TRM 3.8-11 TRM 3.8-12 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 58 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 70 Revision 31 Revision 31 Revision 31 Revision 73 Revision 31 Revision 60 Revision 70 Revision 70 Revision 73 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 44 Revision 31 Revision 72 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 77 Revision 31 Revision 79 Revision 31 Revision 31 Revision 31 Revision 73 Revision 31 Revision 31 Revision 50 Revision 50 Revision 50 Revision 50 Revision 50 Revision 50 Revision 31 TRM 3.8-13 TRM 3.8-14 TRM 3.8-15 TRM 3.8-16 TRM 3.8-17 TRM 3.8-18 TRM 3.9-a TRM 3.9-1 TRM 3.9-2 TRM 3.9-3 TRM 3.9-4 TRM 3.9-5 TRM 3.10-1 TRM 3.11-a TRM 3.11-1 TRM 3.12-a TRM 3.12-1 TRM 3.12-2 TRM 3.12-3 TRM 3.12-4 TRM 3.12-5 TRM 3.12-6 TRM.3.12-7 TRM 3.12-8 TRM 3.12-9 TRM 3.12-10 TRM 3.12-11 TRM 3.12-12 TRM 3.12-13 TRM 3.12-14 TRM 3.12-15 TRM 3.12-16 TRM 3.12-17 TRM 3.12-18 TRM 3.12-19 TRM 3.12-20 TRM 3.12-21 TRM 3.12-22 TRM 3.12-23 TRM 3.12-24 TRM 3.12-25 TRM 3.12-26 TRM 3.12-27 TRE 3.12-28 TRM 3.12-29 TRM 3.12-30 TRM 4.0-1 TRM 5.0-a TRM 5.0-1 TRM 5.0-2 TRM 5.0-3 TRM 5.0-4 Revision 6:L Revision 4S Revision 31 Revision 3:L.

Revision 4:3 Revision 33 Revision 31 Revision 3:L Revision 65 Revision 80 Revision 3:L Revision 3:.

Revision 3:.

Revision 3:.

Revision 31 Revision 3i.

Revision 7!;

Revision 31 Revision 31 Revision 5' Revision 51 Revision 5B.

Revision 31 Revision 5~

Revision 4C Revision 31.

Revision 4S Revision 31.

Revision 7!

Revision 31 Revision 31 Revision 75 Revision 31 Revision 75 Revision 31 Revision 75 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 75 Revision 31 Revision 31 Revision 78 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 TRM Vol. I LEP-2 REV 80 04/05/06

FERMI 2 -

TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM 5.0-5 5.0-6 5.0-7 5.0-8 5.0-9 81.0-1 B2.0-1 B3.0-1 B3.0-2 B3.0-2a B3.0-2b B3.0-2c B3.0-3 B3.0-4 B3.0-5 B3.0-6 B3.0-7 B3.1-1 B3.2-1 B3.3.1-1 B3.3.1-2 B3.3.2-1 B3.3.2-2 B3.3.3-1 B3.3.4-1 B3.3.4-2 B3.3.5-1 B3.3.5-2 B3.3.6-1 B3.3.6-2 B3.3.6-3 B3.3.6-4 B3.3.6-5 B3.3.6-6 B3.3.7-1 B3.3.7-2 B3.3.8-1 B3.3.9-1 B3.3.10-1 B3.3.11-1 B3.3.12-1 B3.3.13-1 B3.3.14-1 B3.4.1-1 B3.4.1-2 B3.4.1-3 B3.4.1-4 B3.4.1-5 B3.4.2-1 B3.4.3-1 B3.4.4-1 B3.4.5-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 31 31 63 63 72 72 72 31 31 54 72 72 31 31 31 31 31 31 67 31 31 31 31 31 31 31 31 76 76 31 31 31 31 56 45 62 31 31 31 71 71 71 71 31 31 31 31 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM B3.4.6-1 B3.4.7-1 B3.5-1 B3.6.1-1 B3.6.2-1 B3.6.3-1 B3.6.4-1 B3.6.5-1 B3.6.6-1 B3.6.7-1 B3.6.8-1 B3.7.1-1 B3.7.2-1 B3.7.3-1 B3.7.4-1 B3.7.4-2 B3.7.5-1 B3.7.6-1 B3.7.7-1 B3.7.8-1 B3.7.9-1 B3.8.1-1 B3.8.2-1 B3.8.3-1 B3.8.4-1 B3.8.5-1 B3.8.6-.1 B3.9.1-1 B3.9.2-1 B3.9.3-1 B3.9.4-1 B3.10-1 B3.11.1-1 B3.12.1-1 B3.12.2-1 B3.12.3-1 B3.12.4-1 B3.12.5-1 B3.12.6-1 B3.12.7-1 B3.12.8-1 Revision 3:.

Revision 3:.

Revision 3'.

Revision 31 Revision 67' Revision 611 Revision 32.

Revision 3i.

Revision 70 Revision 3i.

Revision 31.

Revision 31.

Revision 31 Revision 7-1 Revision 31.

Revision 31.

Revision 32 Revision 31 Revision 31 Revision 31 Revision 79 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 43 Revision 31 Revision 65 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 44 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 TRM Vol. I LEP-3 REV 80 04/0)5/06

FERMI 2 -

TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 11, Revision 0 Page Revision Notation Page 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22

.0

.0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 TRM Vol. I LEP-4 REV 80 04/05/06

Refueling Platform TR 3.9.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TRS:R 3.9.2.1 Demonstrate operation of the overload Within 7 days cutoff when the load exceeds 1200 pounds prior to use for the fuel grapple hoist with the Model NF-400 mast, 1395 pounds for the fuel grapple hoist with Model NF-500 mast, and 1050 pounds for all other hoists.

TRSR 3.9.2.2 Demonstrate operation of the uptravel stop Within 7 days when fuel grapple hoist uptravel and frame prior to use mounted and monorail auxiliary hoists uptravel bring the point of attachment of the fuel assembly or control rod to within 6 feet 6 inches or greater below the top of the refueling platform track.

TRSR 3.9.2.3 Demonstrate operation of the downtravel cutoff when the end of the fuel grapple hoist downtravel is above the reactor fuel guide plate and demonstrate when the end of the frame mounted and monorail auxiliary hoists reach 85 feet or less below the top of the platform tracks.

Within 7 days prior to use TRSR 3.9.2.4 Demonstrate operation of the slack cable Within 7 days cutoff prior to the hoist cable tension prior to use decreasing to less than 40 pounds for the fuel grapple hoist.

TRSR 3.9.2.5 Demonstrate operation of the loaded Within 7 days interlock when the load exceeds 535 pounds prior to use for the fuel grapple hoist with either the Model NF-400 mast or the Model NF-500 mast, and 450 pounds for all other hoists.

TRM Vol. I TRM 3.9-3 REV 80 04/06