Category:E-Mail
MONTHYEARML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23304A0222023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Braidwood 1 & 2 - Exemption from Security Rule (L-2023-LLE-0030) ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23103A4692023-04-12012 April 2023 NRR E-mail Capture - NRC Acceptance Review of Braidwood Request for Amendment to Revise TS 3.7.9 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0172022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0172021-09-0303 September 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood - License Amendment to Revise Technical Specification 3.7.9, Ultimate Heat Sink ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21154A0162021-06-0202 June 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21123A2442021-05-0303 May 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood/Byron/Ginna - Application to Address the Issues Identified in Westinghouse Documents NSAL-09-5 and NSAL-15-1 (L-2021-LLA-0066) ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML21004A1452020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Relief Requests Braidwood I4R-11 and Byron I4R-18 ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20346A1012020-12-11011 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for an Alternative to Use ASME Code Case N-893 (EPIDs L-2020-LLR-0147 and L-2020-LLR-0148) ML20289A1142020-10-0909 October 2020 NRR E-mail Capture - Preliminary RAIs for LAR Regarding Non-conservative TS EDG Frequency Tolerance ML20266G3032020-09-22022 September 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use Paragraph IWA-5120 of the 2017 Edition of the ASME B&PV Code, Section XI ML20261H4122020-09-11011 September 2020 NRR E-mail Capture - (External_Sender) License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink ML21145A0572020-08-18018 August 2020 NRR E-mail Capture - NRC Acceptance Review for Braidwood Relief Request I4R-11 2023-07-06
[Table view] |
Text
Anne Boland - ACTION: Onsite Monitoring and Contamination Questionnaire Page 1 4J
.. ~~ .9...
From: Steven West /2; ,,
To: Carey Brown; DRP Branch Chiefs; Monte Phillips Date: Fri, Feb 3, 2006 1:35 PM
Subject:
ACTION: Onsite Monitoring and Contamination Questionnaire As you neard in our morning meeting, external interest in the Braidwood tritium issue is heating up. We've have been asked to obtain baseline information concerning our licensees' ability to identify onsite contam nation from leaks and spills. Attached is a survey/questionnaire that Steve Orth prepared to help us gathar the needed information. To ensure that we are positioned to respond to expected internal and external requests for information, we need to act quickly.
Rick and Nick Shah are reviewing the survey and will develop an estimate of the time needed to complete it by the residents. I'll share their estimate with you later today.
In the mean time, you may want to send the survey to your resident staffs now and followup with the time estimate later. Our goal is to complete "Phase I" before the end of next week and "Phase II" soon after.
Let me know if you have any questions.
Steve CC: Anne Boland; Cynthia Pederson; Steven Orth
- ' 1'/2
I Anne Boland - Groundwater Monitoring QnAs.wpd Page 1 Anne Boland Groundwater Monitoring OnAs.wpd Page 1 LICENSEE QUESTIONNAIRE Onsite Radiological Effluent Monitoring Program Phase I (Near term response)
Yes No
- 1. Does the licensee have radioactive groundwater monitoring wells onsite? Q Q If YES: How many wells:
Where are they located (e.g., distributed around/throughout the site, in a pardicular region of the site and/or near particular buildings/structures, etc.)
(a.) within the Protected Area (b.) within the Radiologically Restricted Area (c.) within the owner-controlled area Qfl (d.) at what frequency does the licensee sample/analyze the wells (e.) for what radionuclides does the licensee monitor Gamma emitters (gamma Spec) 5 0 If Yes - at what MDA Tritium 5 5 If Yes - at what MDA Gross Beta 0 0 If Yes - at what MDA Other: _ 0 If Yes - at what MDA
- 2. If the licensee does NOT have an onsite radioactive groundwater monitoring program:
(a.) Does the licensee plan to implement a groundwater 0 0 monitoring program.
If Yes, when and to what extent:
(b.) Does the licensee plan to take other measures to assure they 0 0 can identify radioactive groundwater contamination
- 3. Does the licensee have a surveillance program to periodically walkdown 0 0 outsice areas around the site to look for potential leaks and spills?
- 4. Does the licensee perform any other onsite monitoring (e.g. soil 0 0 samp ing) to identify unexpected radioactive releases
I Anne Boland - Groundwater Monitoring QnAs.wpd Page 2 l
- 5. Does the licensee's radioactive liquid discharge line traverse any non-licensee owned areas (e.g., it is on a right-of-way surrounded by private properties)?
l Anne Boland - Groundwater Monitoring QnAs.wpd Page 3 l
[-
Anne Boland - Groundwater Monitoring QnAs.wpd Page 4 1 I Anne Boland - Groundwater Monitoring QnAs.wpd Page 5' I Anne Boland - Groundwater Monitoring QnAs.wpd Page 5 Yes No
- 6. If the licensee has a discharge pipe that runs underground or any g E underground piping that carries radioactive liquids, does the licensee perform monitoring along the discharge pathway to identify potential leakage.
If YES',
Hovv frequently is the sampling performed:
For What radionuclides does the licensee monitor:
Phase 11(Longer Term Response)
Yes No
- 7. Historical Onsite Radioactive Contamination:
(a.) DDes the licensee have any history of radioactive spills and/or leaks E E outside of buildings?
Are they documented in their 50.75g file El 0 (b.) Has the licensee identified onsite radioactive groundwater C C contamination.
If YES:
> When was it identified - IF known:
Dates:
Condition Report No:
(If available)
> To what extent - IF known [square footage, estimated ground depth of the contamination, estimated quantity (volume / concentration), etc.]
> Has the contamination moved outside the C:1 C Restricted Area or the owner-controlled area
- 8. Comments: