MONTHYEARIR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24024A2072024-01-24024 January 2024 Inservice Inspection Request for Information IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) ML23249A2782023-09-0606 September 2023 Inservice Inspection Request for Information ML23159A2382023-07-25025 July 2023 Request for Additional Information for the Technical Review of the Application for Renewal of the Diablo Canyon Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2022-RNW-0007) ML23159A2372023-07-25025 July 2023 ISFSI Renewal RAI Transmittal Letter Enclosure ML23096A1792023-04-0606 April 2023 NRR E-mail Capture - Request for Additional Information Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23047A0062023-02-21021 February 2023 Request for Additional Information Alternative Security Measures for Early Warning System (EPID: L-2022-LLA-0029) (Public Version) ML23041A1862023-02-17017 February 2023 Request for Information Regarding Diablo Canyon Power Plant, Units 1 and 2 - December 8, 2022, Public Meeting ML22258A1112022-09-14014 September 2022 2022 Diablo Canyon PIR Request for Information ML22200A2572022-07-19019 July 2022 Notification of In-service Inspection (Inspection Report 05000323/2022004) and Request for Information ML22187A2652022-07-0606 July 2022 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Exemption Request for Part 73 force-on-force Training Due to COVID-19 ML22152A1502022-06-21021 June 2022 Request for Additional Information Regarding License Amendment Request for Technical Specifications and Revised License Conditions for the Permanently Defueled Condition ML22122A1412022-05-0505 May 2022 .02 Doc Request ML22068A2312022-03-17017 March 2022 Notification of NRC Design Bases Assurance Inspection (Team) 05000275/2022011 and 05000323/2022011 and Initial Request for Information ML22061A2192022-03-0202 March 2022 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Changes to Emergency Plan for post-shutdown and Permanently Defueled Condition ML21363A1692021-12-29029 December 2021 Inservice Inspection Request for Information ML22019A0412021-12-29029 December 2021 RFI ML21215A3432021-08-0303 August 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Request to Revise Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance ML21130A3642021-06-21021 June 2021 DC 2021401 Information Request ML21104A3642021-04-14014 April 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition ML21062A0642021-03-0202 March 2021 NRR E-mail Capture - Request for Additional Information for Diablo Canyon Generic Letter 2004-02 Submittal (L-2017-LRC-0000) ML20329A0692020-11-23023 November 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon COVID-19 Exemption Request to Extend force-on-force Exercise ML20323A4532020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon COVID-19 Exemption Request to Extend Firearms Requalification ML20301A2212020-10-27027 October 2020 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000275/2021010 and 05000323/2021010) and Request for Information ML20261H4232020-09-17017 September 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection Report ML20231A2372020-08-17017 August 2020 NRR E-mail Capture - Diablo Canyon Additional Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G EPID: L-2020-LLA-017 ML20230A0732020-08-14014 August 2020 NRR E-mail Capture - Diablo Canyon Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G ML20280A5432020-06-0303 June 2020 DC 2020 PIR Request for Information ML20041E6012020-02-10010 February 2020 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Request for Additional Information for Post -Shutdown Decommissioning Activities Report (PSDAR) ML19262G7482019-08-0909 August 2019 Request for Information ML19149A6012019-05-28028 May 2019 NRR E-mail Capture - Request for Additional Information (Supplemental) - License Amendment Request (LAR) to Revise Emergency Plan Response Organization Staffing and Augmentation ML19123A2162019-05-0202 May 2019 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant -Request for Exemption from Operator Written Examination and Operating Test - Request for Additional Information ML19084A2572019-03-21021 March 2019 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Emergency Plan Response Organization Staffing and Augmentation ML19043A9452019-02-20020 February 2019 Notification of Inspection (NRC Inspection Report 05000275/2019002, 05000323/2019002 and Request for Information ML17306A9382017-11-0202 November 2017 NRR E-mail Capture - Request for Additional Information - Request for Approval for Application of Full Weld Overlay REP-RHR-SWOL, Diablo Canyon Power Plant, Units 1 and 2 ML17152A3192017-06-0101 June 2017 NRR E-mail Capture - Request for Additional Information (RAI)- Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2 (CAC Nos. MF9386 Through MF9390) ML17102B6072017-04-12012 April 2017 NRR E-mail Capture - Request for Additional Information (RAI) - Revised Emergency Action Level Schemes Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6 ML16347A0032016-12-0909 December 2016 NRR E-mail Capture - Request for Additional Information (RAI) - Diablo Canyon Power Plant License Amendment Request for Adoption of NEI 94-01 ML16326A3562016-11-21021 November 2016 NRR E-mail Capture - Request for Additional Information - License Amendment Request to Adopt Nuclear Energy Institute (NEI) 94-01, Revision 2-A for Diablo Canyon Power Plant, Units 1 and 2 - CAC Nos. MF7731 and MF7732 ML16048A2322016-02-17017 February 2016 NRR E-mail Capture - Diablo Canyon 1 and 2 - Met Data Second Round of Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term Per 10 CFR 50.67 (TAC Nos. MF6399 and MF640 ML16011A3652016-02-0202 February 2016 Requests for Additional Information for the Review of the Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application - Set 39 (TAC Nos. ME2896 and ME2897) ML16011A3172016-01-11011 January 2016 NRR E-mail Capture - Diablo Canyon 1 and 2 - Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term Per 10 CFR 50.67 ML15358A0022015-12-23023 December 2015 Request for Additional Information Email (Follow-up Pra), Request to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML15357A3822015-12-23023 December 2015 Request for Additional Information, Round 4 - Amendment Request to Replace Digital Process Protection System for Reactor Protection System and Engineered Safety Features Actuation System Functions ML15295A3732015-11-0505 November 2015 Requests for Additional Information Related to the Diablo Canyon LRA Environmental Review ML15287A1652015-10-23023 October 2015 Requests for Additional Information Related to the Diablo Canyon LRA Environmental Review - SAMA ML15267A7742015-10-0101 October 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1 Seismic Evaluations ML15217A4812015-09-24024 September 2015 Requests for Additional Information for the Review of the Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application Set-38 TAC Nos. ME2896 and ME2897 ML15238B7742015-08-27027 August 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Reevaluations ML15153A0332015-06-29029 June 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Reevaluations 2024-01-24
[Table view] |
Text
April 18, 2006 Mr. John S. Keenan Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 770000 San Francisco, CA 94177-0001
SUBJECT:
DIABLO CANYON POWER PLANT, UNIT NO. 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING THE 2005 (1R13) STEAM GENERATOR TUBE INSPECTIONS (TAC NO. MD0317)
Dear Mr. Keenan:
By letters dated November 25, 2005, and February 24, 2006, Pacific Gas and Electric Company, the licensee, submitted information summarizing the results of the 2005 steam generator (SG) tube inspections at Diablo Canyon Power Plant, Unit 1. These inspections were performed during the thirteenth refueling outage (1R13). In addition to these reports, the U.S. Nuclear Regulatory Commission (NRC) staff summarized additional information concerning the 2005 SG tube inspections at Diablo Canyon Power Plant, Unit 1, in a letter dated January 18, 2006.
The NRC staff has reviewed the above reports and has determined that it requires additional information to complete its review. A request for additional information is enclosed. This request was discussed with Tom Grozan of your staff on April 14, 2006, and it was agreed that a response would be provided within 60 days of receipt of this letter.
If you or your staff have any questions concerning the resolution of this matter, please contact Alan B. Wang at (301) 415-1445.
Sincerely,
/RA/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-275
Enclosure:
Request for Additional Information cc w/encl: See next page
April 18, 2006 Mr. John S. Keenan Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 770000 San Francisco, CA 94177-0001
SUBJECT:
DIABLO CANYON POWER PLANT, UNIT NO. 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING THE 2005 (1R13) STEAM GENERATOR TUBE INSPECTIONS (TAC NO. MD0317)
Dear Mr. Keenan:
By letters dated November 25, 2005, and February 24, 2006, Pacific Gas and Electric Company, the licensee, submitted information summarizing the results of the 2005 steam generator (SG) tube inspections at Diablo Canyon Power Plant, Unit 1. These inspections were performed during the thirteenth refueling outage (1R13). In addition to these reports, the U.S. Nuclear Regulatory Commission (NRC) staff summarized additional information concerning the 2005 SG tube inspections at Diablo Canyon Power Plant, Unit 1, in a letter dated January 18, 2006.
The NRC staff has reviewed the above reports and has determined that it requires additional information to complete its review. A request for additional information is enclosed. This request was discussed with Tom Grozan of your staff on April 14, 2006, and it was agreed that a response would be provided within 60 days of receipt of this letter.
If you or your staff have any questions concerning the resolution of this matter, please contact Alan B. Wang at (301) 415-1445.
Sincerely,
/RA/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-275
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION:
PUBLIC RidsNrrPMAWang RidsOgcRp LPLIV Reading RidsAcrsAcnwMailCenter RidsRegion4MailCenter (BJones) RidsNrrDorl (CHaney/CHolden) JMedoff RidsNrrLALFeizollahi RidsNrrDorlLpl4 (DTerao)
ADAMS Accession Number:
OFFICE LPL4/PM LPL4/LA LPL4/BC NAME AWang;mxr4 LFeizollahi DTerao DATE 4/18/06 4/18/06 4/18/06 OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2005 STEAM GENERATOR TUBE INSPECTIONS DIABLO CANYON POWER PLANT, UNIT 1 DOCKET NO. 50-275 OPERATING LICENSE NO. DPR-80 By letters dated November 25, 2005 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML053410394), and February 24, 2006 (ADAMS Accession No. ML060660468), Pacific Gas and Electric Company, the licensee, submitted information summarizing the results of the 2005 steam generator (SG) tube inspections at Diablo Canyon Power Plant, Unit 1. These inspections were performed during the thirteenth refueling outage (1R13). In addition to these reports, the U.S. Nuclear Regulatory Commission (NRC) staff summarized additional information concerning the 2005 SG tube inspections at Diablo Canyon Power Plant, Unit 1, in a letter dated January 18, 2006 (ADAMS Accession No. ML053640392).
The NRC staff has reviewed the above reports and has determined that the following information is required to complete its review:
Axial Primary Water Stress-Corrosion Cracking (PWSCC) Alternate Repair Criteria (ARC)
- 1. Please clarify the number of axial PWSCC indications detected and plugged during your 2005 inspections in 1R13. The NRC staff notes the following:
On page 2-5 of Enclosure 2 to your February 24, 2006, letter, 240 axial PWSCC indications were reported as being detected in 1R13.
On page 2-6 of Enclosure 2 to your February 24, 2006, letter, 217 axial PWSCC indications were reported as being left in service in 1R12. Of these, 17 were plugged.
On page 2-6 of Enclosure 2 to your February 24, 2006, letter, 25 new axial PWSCC indications were detected in 1R13 (25 + 217 = 242 not 240). Of these, five were plugged.
On page 2-7 of Enclosure 2 to your February 24, 2006, letter, 218 axial PWSCC indications were returned to service: 196 repeat, 2 repeat merged, and 20 new indications (198 returned to service + 17 plugged = 215 not 217).
On page 2-12 of Enclosure 2 to your February 24, 2006, letter, 240 axial PWSCC indications were reported as being detected in 1R13, 215 from repeat indications and 25 new indications.
ENCLOSURE
- 2. On page 2-8 of Enclosure 2 to your February 24, 2006, letter, it was indicated that the Cycle 13 growth rate data included 213 data points from repeat indications. Since there were 217 indications left in service, it is not clear why there were only 213 data points.
Presumably part of this difference is that in two instances an intersection had two flaws during 1R12 and these two flaws subsequently merged and appeared as one indication in 1R13. Please clarify this discrepancy.
- 3. Please confirm that the column titled 1R13 OA (ANL/TW Model) in Table 5 in Enclosure 2 to your February 24, 2006, letter, reflects the projection for the End-of-Cycle 14 (i.e., it uses the 1R14 Final OA growth rate distribution in Table 2).
- 4. Given that it appears that the growth rate from Cycle 13 was greater than that in Cycle 12, discuss the need to account for this increasing growth rate from cycle-to-cycle in your analysis (i.e., similar to the delta-volts adjustment used in implementing the voltage-based ARC).
- 5. A number of circumferential indications were detected at the tube support plates elevations during the 1R13 inspections when compared to several previous years.
Please discuss whether there was any specific reason for this trend (e.g., less noise in the eddy current data, expected increase in degradation with time, etc.).
Outside-Diameter Stress-Corrosion Cracking (ODSCC) ARC
- 1. Table 3-18 of Enclosure 4 to your February 24, 2006, letter, lists indications that were re-inspected following a failed probe wear check. In evaluating the data in Table 3-18, it appears that all indications are greater than 75 percent of the tube repair criteria (1.5 volts). Please confirm that the tubes re-tested with a good (non-worn) probe only had indications greater than 1.5 volts. If there were other indications (i.e., less than 1.5 volts), please update Table 3-18 and Figure 3-37 with this data. This analysis is consistent with the NRC staffs approval of the alternate probe wear criteria.
- 2. Table 3-19 of Enclosure 4 to your February 24, 2006, letter, shows that a 1.78 volt indication was detected during 1R13 in a tube that had been inspected with a worn probe during the prior inspection. With hindsight, please discuss whether an indication is present at this location in the 1R12 data and the size of this indication. Please discuss the extent to which probe wear may have been a reason for missing the indication at this location in 1R12 (if one was present).
- 3. The growth rate of axial indications that were detected by bobbin in 1R13 and were only detectable with a rotating probe in 1R12 axial ODSCC indications not detected by bobbin (AONDBs) is approximately 50 percent than that of the population of indications detected by bobbin in both outages. Some of the larger growth rate differences were in tubes in which the 1R13 bobbin voltage was influenced by the presence of a dent.
Since the reason for the analysis of the AONDB voltage changes is to determine whether the use of the rotating probe to bobbin voltage correlation is reasonable, discuss whether additional limitations should be placed on the use of the correlation (i.e., to those intersections where the dent would not significantly influence the voltage).
In addition, discuss whether additional limitations are needed on this correlation for multiple axial indications since these indications had some of the largest growth rate
differences. The NRC staff notes that comparing inferred to inferred bobbin voltages could be misleading since the whole purpose of the correlation is to determine the true bobbin voltage (which is directly related to the integrity of the flaw). In addition, discuss whether Figure 3-39 should be used to place an upper limit on the inferred bobbin voltages beyond which the affected indication would be removed from service (i.e., at an inferred bobbin voltage of approximately 0.6 volts, the measured bobbin voltage could exceed 2.0 volts, which is the plugging limit).
With respect to Table 3-23 of Enclosure 4 to your February 24, 2006, letter, please clarify the following column: Cycle 13 Avg Voltage Change (w/EFPY).
- 4. Figure 6-1 of Enclosure 4 to your February 24, 2006, letter, indicates that for the recently completed cycle that the probability of detecting larger voltage indications may be declining. In light of this potential decrease in performance, discuss why the composite probability of prior cycle detection curve was used in the End-of-Cycle 14 projections rather than the data from the recently completed cycle (labeled as 1R12 POPCD in Figure 6-1). Please clarify the nomenclature in Table 6-8, Table 7-1, and Figure 6-1 of Enclosure 4 to your February 24, 2006, letter. For example, is the composite POPCD through 1R13 (Eight Inspections) in Figure 6-1 identical to the Updated POPCD through 1R12 (8 inspections) in Table 6-8 (and similarly in Table 7-1).
Other Inspection Findings (not related to an ARC)
- 1. Three tubes were preventively plugged in 1R13. Please discuss the reason for plugging these tubes.
- 2. Please discuss the process used for determining an indication is a result of cold-leg thinning. For example, discuss how the shape, phase angle, and amplitude of the signal are evaluated to result in a classification of cold-leg thinning.
Diablo Canyon Power Plant, Units 1 and 2 cc:
NRC Resident Inspector Richard F. Locke, Esq.
Diablo Canyon Power Plant Pacific Gas & Electric Company c/o U.S. Nuclear Regulatory Commission P.O. Box 7442 P.O. Box 369 San Francisco, CA 94120 Avila Beach, CA 93424 City Editor Sierra Club San Lucia Chapter The Tribune ATTN: Andrew Christie 3825 South Higuera Street P.O. Box 15755 P.O. Box 112 San Luis Obispo, CA 93406 San Luis Obispo, CA 93406-0112 Ms. Nancy Culver Director, Radiologic Health Branch San Luis Obispo State Department of Health Services Mothers for Peace P.O. Box 997414, MS 7610 P.O. Box 164 Sacramento, CA 95899-7414 Pismo Beach, CA 93448 Mr. James D. Boyd, Commissioner Chairman California Energy Commission San Luis Obispo County 1516 Ninth Street (MS 31)
Board of Supervisors Sacramento, CA 95814 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Mr. James R. Becker, Vice President Diablo Canyon Operations Mr. Truman Burns and Station Director Mr. Robert Kinosian Diablo Canyon Power Plant California Public Utilities Commission P.O. Box 3 505 Van Ness, Room 4102 Avila Beach, CA 93424 San Francisco, CA 94102 Jennifer Tang Diablo Canyon Independent Safety Field Representative Committee United States Senator Barbara Boxer ATTN: Robert R. Wellington, Esq. 1700 Montgomery Street, Suite 240 Legal Counsel San Francisco, CA 94111 857 Cass Street, Suite D Monterey, CA 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 March 2006