Dr, zis 3.A6.1.3 SEjR-,VE IL.A11CE-R;7QUTREMIENTS (ccrnt i nued)
StiRT7E LLA iCE J
R-lUtrCy 3'
- 1.
Leakage through penetrations 1MC-101 and 1MlC-102 is excluded.
- 2.
Only required to be met in MODES 1, 2, and 3.
Verify the combined leakage rate for all Tn accordance secondary containment bypass leakage with the paths is
- 0.08 La when pressurized to Pr ijary
> PContainment Leakage Rate Testing Program SR 3.6.1.3.9 NOTE------------------
Only required to be met in MODES 1, 2, and 3.
Verify the leakage race through each INSIV In accordance leakage path is S 100 scfh when tested at with the 2 Pa and the combined leakage rate for Primary all MSIV leakage paths is S 200 scfh when Leakage Rate tested at > Pa.
Testing Program SR 3.6.1.3.10
NOTE------------------
Only required to be met in MODES 1, 2, and 3.
Verify combined leakage rate through In accordance hydrostatically tested lines that with the penetrated the primary containment is Primary within limits.
Containment Leakage Rate Testing Program (continued)
CLINTON 3.6 -1 9 Amendment No. 173