ML061010566

From kanterella
Jump to navigation Jump to search
Technical Specifications Pages, Eliminating the Requirements to Submit Monthly Operating Reports and Occupational Radiation Exposure Reports
ML061010566
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/06/2006
From:
Plant Licensing Branch III-2
To:
References
Download: ML061010566 (6)


Text

TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS) 5.0 ADMINISTRATIVE CONTROLS ....... 0-5.1 Responsibility ...................... 5.0-l 5.2 Organization ...................... 5.0-2 5.3 Unit Staff Qualifications ...................... 5.0-5 5.4 Procedures ...................... 5.0-6 5.5 Programs and Manuals ........ 5.0-7 5.6 Reporting Requirements ...................... TS/5.0-19 5.7 High Radiation Area ...................... 5.0-27 TS1 TOC 3/23/06 SUSQUEHANNA - UNIT 1 TS /TOC -4 Amendment 18(, 2 yV, ?.33

PPL Rev. 6 Reporting Requirements 5.6 5.0 ADMINISTRATIVE CONTROLS 5.6 Reporting Requirements The following reports shall be submitted in accordance with 10 CFR 50.4.

5.6.1 Not Used I 5.6.2 Annual Radiological Environmental Operating Report

-NOTE.

A single submittal may be made for both SSES units. The submittal should combine sections common to all units at the station.

The Annual Radiological Environmental Operating Report covering the operation of the unit during the previous calendar year shall be submitted by May 15 of each year. The report shall include summaries, interpretations, aid analyses of trends of the results of the Radiological Environmental Monitoring Program for the reporting period. The material provided shall be consistent with the objectives outlined in the Offsite Dose Calculation Manual (continued)

SUSQUEHANNA - UNIT 1 TS / 5.0-1 9 Amendment 17f, °

PPL Rev. 6 Reporting Requirements 5.6 5.6 Reporting Requirements (continued) 5.6.4 Not Used 5.6.5 CORE OPERATING LIMITS REPORT (COLR)

a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
1. The Average Planar Linear Heat Generation Rate for Specification 3.2.1;
2. The Minimum Critical Power Ratio for Specification 3.2.2;
3. The Linear Heat Generation Rate for Specification 3.2.3;
4. The Average Power Range Monitor (APRM) Gain and Setpoints for Specification 3.2.4;
5. The Shutdown Margin for Specification 3.1.1; and
6. Oscillation Power Range Monitor (OPRM) Trip Setpoints for Specification 3.3.1.1.
b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC.

When an initial assumed power level of 102 percent of rated power is specified in a previously approved method, this refers to the power level associated with the design basis analyses, or 3510 MWt. The power level of 3510 MWt is 100.6% of the rated thermal power level of 3489 MWt. The RTP of 3489 MWt may only be used when feedwater flow measurement (used as input to the reactor thermal power measurement) is provided by the Leading Edge Flow Meter (LEFM/ Tm) as described in the LEFMVrm Topical Report and supplement referenced below. When feedwater flow measurements from the LEFMVTM system are not available, the core thermal power level may not exceed the originally approved RTP of 3441 MWt, but the value of 3510 MWt (continued)

SUSQUEHANNA - UNIT 1 TS / 5.0-21 Amendment 1M, 1.94, 2l, 217>, 2 233,

TABLE: OF CONTENTS (TECHNICAL SPECIFICATIONS) 5.0 ADMINISTRATIVE CONTROLS ...................... 5.0-1 5.1 Responsibility....................................................................................... 5.0-1 5.2 Organization ...................... 5.0-2 5.3 Unit Staff Qualifications ...................... 5.0-5 5.4 Procedures ...................... 5.0-i3 5.5 Programs and Manuals ...................... 5.0-7 5.6 Reporting Requirements ...................... TS/5.0-- 9 I 5.7 High Radiation Area ...................... TSt5.0-24 TS2 TOC 3/23/06 SUSQUE.HANNA - UNIT 2 TSITOC - 4 Amendment 1/1 ,1 i, 1f12,210

PP[. Rev. 4 Reporting Requirements 5.6 5.0 ADMINISTRATIVE CONTROLS 5.6 Reporting Requirements The following reports shall be submitted in accordance with 10 CFR 50.4.

5.6:. Not Used I 5.6.2 Annual Radiological Environmental Operating Report


NOTE------------------------------------------------------------

A single submittal may be made for both SSES units. The submittal should combine sections common to all units at the station.

The Annual Radiological Environmental Operating Report covering the operation of the unit during the previous calendar year shall be submitted by May 15 of each year. The report shall include summaries, interpretations, and analyses of trends of the results of the Radiological Environmental Monitoring Program for the reporting period. The material provided shall be consistent with the objectives outlined in the Offsite Dose Calculation Manual (continued)

SUSQUEHANNA - UNIT 2 TS /5.0-19 Amendment 1,d1,210

PPL Rev. 4 Reporting Requirements 5.6 5.6 Reporting Requirements (continued) 5.6.4 Not Used I I

5.6.'5 CORE OPERATING LIMITS REPORT (COLR)

a. Core operating limits shall be established prior to each reload cycle, or priDr to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
1. The Average Planar Linear Heat Generation Rate for Specification 3.2.1;
2. The Minimum Critical Power Ratio for Specification 3.2.2;
3. The Linear Heat Generation Rate for Specification 3.2.3; 4 The Average Power Range Monitor (APRM) Gain and Setpoints for Specification 3.2.4; and
5. The Shutdown Margin for Specification 3.1.1.
6. The OPRM setpoints for Specification 3.3.1.3.
b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC.

When an initial assumed power level of 102 percent of rated power is specified in a previously approved method, this refers to the power level associated wi:h the design basis analyses, or 3510 MWt. The power level of 3510 MWt is 100.6% of the rated thermal power level of 3489 MWt. The RTP of 3489 MWt may only be used when feedwater flow measurement (used as input to the reactor thermal power measurement) is provided by the Leading Edge Flow Meter (LEFM' Tm) as described in the LEFMV MTopical Report and supplement referenced below.

When feedwater flow measurements from the LEFMVTM system are not available, the (continued)

SUSQUEHANNA - UNIT 2 TS / 5.0-21 Amendment 166, 19% 19Z 210