ML061000708

From kanterella
Jump to navigation Jump to search

E-mail from D. Croulet of Entergy to Various, Regarding Summary Data
ML061000708
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/14/2005
From: Croulet D
Entergy Nuclear Operations
To: Noggle J
Division of Reactor Safety I
References
FOIA/PA-2006-0081
Download: ML061000708 (8)


Text

James Noggle - FW: summary Data Page 1i From:

"Croulet, Donald" <dcroule~entergyp.om>

To:

"Conroy, Pat" <PConroy~entergycom>, "Cox, Mark R" <mcox9O~entergy.com>,

"'Timothy Rice"' <tbrice @gw.dec.state.ny.us>, "'jdhl @ nrc.gov"' <jdn C nrc.gov>, "Janicki, John"

<JJanick@ entergy.com>

Date:

12/14/05 6:18AM

Subject:

FW: Summary Data From: Lavera, Ron Sent: TLesday, December 13, 2005 5:25 PM To: Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; Gary Hinrichs; Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Ron Lavera; Ronald Sachatello; T. R. Jones

Subject:

Summary Data Please see the attached summary data for wells.

Ron

<<mw_execsumm_Sort-byWellDec_13_2005.doc>>

<<mwc xecsumm__SortbyDate-Dec_13_2005.doc>>

RLaVera@entergy.com <mailto:RLaVera @ entergy.com>

914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 3

'.O. Box 308 Buchanan, NY 10511-0308

On-Site Monitoring Wells Sorted by Well Location Executive Summary December 13th ID Date Location Sample Results MWV-30 11/22/2005 FSB Leakage Area -

Note: Well development 464, 000 to 600, 000 pCi/l NOT completed HTO MWV-38 12/2/2005 End of IP-3 15000 pCi/i HTO - False Discharge Canal Positive due to sample Concrete contamination.

MWV-38 12/5/2005 End of IP-3 Discharge Canal Concrete ND/HTO MWV-38 12/6/2005 End of IP-3 Discharge Canal Concrete ND/HTO ID Date Location Sample Results MW-111 9/28/2005 Transformer Yard 212,000 pCi/I HTO MW-111 10/5/2005 Transformer Yard 188,000 pCi/I HTO MW-111 10/14/2005 Transformer Yard 682 pCi/I HTO (heavy rain)

MW-111 10/14/2005 Transformer Yard 632 pCi/i HTO (back-up)

MW-111 10/21/2005 Transformer Yard 284,000 pCi/l HTO MW-ill 10/28/2005 Transformer Yard 218,000 pCi/I HTO MW-1I1 11/4/2005 Transformer Yard 302,000 pCi/l HOT MW-11l 11/10/2005 Transformer Yard 246,000 pCi/l HTO MW-1i1 11/18/2005 Transformer Yard 171,000 pCi/i HTO MW-111 11/22/2005 Transformer Yard 180,000 pCi/i HTO MW-111 12/02/2005 Transformer Yard 125,000 pCi/l HTO MW-11 12/08/2005 Transformer Yard 270,000 pCi/l HTO ID Date Location Sample Results MW-107 9/28/2005 NEM ND/HTO MvW-108 9/28/2005 GT-1 ND/HTO MW-108 11/4/05 GT-1 ND/HTO MW-109 9/28/2005 GT-1 ND/HTO MW-109 11/04/2005 GT-1 ND/HTO MW_EXE-1.DOC Page 1 of 4

On-Site Monitoring Wells Sorted by Well Location Executive Summary December 13th ID Date Location Sample Results U3-1 10/6/2005 U3 Discharge Canal 417 pCi/l HTO U3-1 10/21/2005 U3 Discharge Canal ND/HTO U3-1 10/28/2005 U3 Discharge Canal ND/HTO U3-1 11/4/2005 U3 Discharge Canal ND/HTO U3-1 11/10/2005 U3 Discharge Canal ND/HTO U3-1 11/22/2005 U3 Discharge Canal NDO U3-1 12/2005 U3 Discharge Canal ND/HTO U3-2 10/6/2005 U3 Discharge Canal 960 pCi/H HTO U3-2 10/21/2005 U3 Discharge Canal ND/HTO U3-2 10/28/2005 U3 Discharge Canal ND/HTO U3-2 11/4/2005 U3 Discharge Canal ND/HTO U3-2 11/10/2005 U3 Discharge Canal ND/HTO U3-2 11/22/2005 U3 Discharge Canal ND/HTO U3-2 12/2/05 U3 Discharge Canal ND/HTO U3-3 10/6/2005 U3 Discharge Canal 439 pCiN

/

HTO U3-3 10/21/2005 U3 Discharge Canal NDi/HT U3-3 10/28/2005 U3 Discharge Canal ND/HTO U3-3 11/4/2005 U3 Discharge Canal ND/HTO U3-3 11/10/2005 U3 Discharge Canal 471 pCiN

/

HTO U3-3 11/22/2005 U3 Discharge Canal ND/HTO U3-3 12/2/05 U3 Discharge Canal ND/HTO U3-4 U3 Condensate 399 pCi/l HTO 10/21/2005 Polisher U34 U3 Condensate 405 pCi/l HTO 10/28/2005 Polisher U3-4 U3 Condensate ND/HTO 11/4/2005 Polisher U3-4 U3 Condensate ND/HTO 11/10/2005 Polisher U3-4 U3 Condensate ND/HTO 11/22/2005 Polisher U34 U3 Condensate ND/HTO 12/2/05 Polisher U3-T1 10/6/2005 U3 South Turbine 703 pCi/l HTO U3-T1 10/21/2005 U3 South Turbine ND/HTO MW_EXE-1.DOC Page 2 of 4

On-Site Monitoring Wells Sorted by Well Location Executive Summary December 13th U3-T1 10/28/2005 U3 South Turbine ND/HTO U3-T1 11/4/2005 U3 South Turbine NDJHTO U3-T1 11/10/2005 U3 South Turbine 563 pCi/l HTO U3-T1 11/22/2005 U3 South Turbine ND/HTO U3-T1 12/2/05 U3 South Turbine 498 pCi/I HTO U3-T2 10/6/2005 U3 North Turbine 1,590 pCi/i HTO U3-T2 10/21/2005 U3 North Turbine 1,470 pCi/i HTO U3-T2 10/28/2005 U3 North Turbine 1,280 pCi/I HTO U3-T2 11/4/2005 U3 North Turbine 1,190 pCi/I HTO U3-T2 11/10/2005 U3 North Turbine 1,640 pCi/I HTO U3-T2 11/22/2005 U3 North Turbine NDJHTO U3-T2 12/2/05 U3 North Turbine 1,329 pCi/I HTO

-._@:,; i

.)

I I MW_EXE-1.DOC Page 3of 4

On-Site Monitoring Wells Sorted by Well;Location Executive Summary i -

December 13th MW-111 Tritium 350,000 300,000 250,000 C 200,000

.0.E3 150,000 100,000 50,000 0

A A,..

\\A/

l l

[

f I-*-

pCiA HTOl to to LO U'

o 0

o 0

C\\)

Itz t o to O

LO LO o

0 0

o 0

C',1 N

_ O 0

t o t o O

o o

o N

N Date to tO o

0 o

0

-S g

,o.

0 S..--

.. j to LO o) o o

o N\\

NC~

6-

-- S o~

Z-MW_EXE-1.DOC Page 4 of 4

On-Site Monitoring Wells Executive Summary 12/13/05 Date ID Location Sample Results 9/28-29/05 MW-107 NEM ND/HTO MW-108 GT-1 ND/HTO MW-109 GT-l ND/HTO MW-111 Transforrner Yard 212,000 pCi/I HTO 10/5/05 MW-111 Transformer Yard 188,000 pCi/I HTO 10/6/05 U3-1 U3 Discharge Canal 417 pCi/l HTO U3-2 U3 Discharge Canal 960 pCi/l HTO U3-3 U3 Discharge Canal 439 pCi/l HTO U3-T1 U3 South Turbine 703 pCi/l HTO U3-T2 U3 North Turbine 1,590 pCi/l HTO 10/14/05 MW-111 Transformer Yard 682 pCi/l HTO (heavy rain)

MW-il11.'

-Transformer Yard 632 pCi/I HTO (back-tip) 10/21/05 MW-111 Transformner Yard 284,000 pCi/l HTO 10/21/05 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 399 pCi/l HTO U3-T1 U3 South Turbine ND/ITO U3-T2 U3 North Turbine 1,470 pCi/l HTO 10/28/05 MW-111 Transformer Yard 218,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal NDJHTO U3-4 U3 Condensate Polisher 405 pCi/I HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,280 pCi/A HTO 11/4/05 MW-11I Transformer Yard 302,000 pCi/l HOT U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal NDJHTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/l HTO 1

G:\\axelson\\mw_execsumm.doc

On-Site Monitoring Wells Executive Summary 12/13/05 Date ID Location Sample Results

]

1il/3-4/05 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO 11/10/05 MW-ll Transformner Yard 246,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal 471 pCi/l HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 563 pCi/A HTO U3-T2 U3 North Turbine 1,640 pCi/l HTO 1:l/18/05 MW-ill Transformer Yard 171,000 pCi/i HTO 1:L/22/05 MW-IllI Transforner Yard 180,000 pCi/A HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal NDJHTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/JHO U3-T1 U3 South Turbine ND[HTO U3-T2 U3 North Turbine ND/HTO 12/02/05 MW-lll Transforner Yard 125,000 pCi/l HTO 12/02/05 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal NDJHTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 498 pCi/l HTO U3-T2 U3 North Turbine 1,329 pCi/l HTO 12/2/05 MWV-38 End of IP-3 Discharge 15000 pCiAl HTO - False Canal Concrete Positive due to sample contamination.

12/5/05 MW-38 End of JP-3 Discharge NDJHTO Canal Concrete 12/6/05 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/08/05 MW-Ill Transformer Yard 270,000 pCiA HTO 2

G:\\axelson\\mw_execsumm.doc

I On-Site Monitoring Wells Executive Summary 12/13/05 Monitoring Wells / Locations Off-Site Date Location Results 10/i8/05 Croton Reservoir ND/HTO - Gamma Camp Field Reservoir ND/HTO - Gamma 10/20/05 Gypsum ND/HTO - Gamma Algonquin ND/HTO - Gamma 5th Street WVell ND/HTO - Gamma 10/25/05 Rock Quarry ND/HTO - Gamma 11/8/05 5 th Street Well ND/HTO - Gamma

.:,; r!:,

.: -1 P

3 GAaxelson\\mw_execsumm.doc