E-mail from D. Croulet of Entergy to Various, Regarding Well Data Exec Summary
ML061000675
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/12/2005
From: Croulet D
Entergy Nuclear Operations
To: Noggle J
Division of Reactor Safety I
References
FOIA/PA-2006-0081
Download: ML061000675 (8)


Text

ogl-j gJames FW ell data exec summary- Pge 1 From: "Croulet, Donald" soule @entergy.com>

To: "Conroy, Pat" < {onroy@ entergy.com>, "'tbrice © gw.dec.state.ny.us"'

<tbriceC©)gw.dec.state.ny.us>, "jdn @nrc.gov"' <jdn @nrc.gov>, "Cox, Mark R" <mcox90©entergy.com>,

"Janicki, John" <JJanick~entergy.com>

Date: 12/12/05 6:29AM

Subject:

FW: well data exec summary From: Lavera, Ron Sent: Thursday, December 08, 2005 6:06 PM To: Axelson, William L; Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; Gary Hinrichs; Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Flon Lavera; Ronald Sachatello; T. R. Jones

Subject:

RE: well data exec summary Bill I understand that we are changing the frequency of the up date of the Executive Summary of Well .'-a-t,'f ehp' Sample data from as needed to daily.

Please see the attached.

<<mwi_execsumm_Sort-byWellDec_8_2005.doc>>

<<mw_execsummSort_byDateDec_8_2005.doc>>

RLaVeraO entergy.com <mailto:RLaVera @entergy.com>

9314-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 3

?.O. Box 308

,3uchanan, NY 10511-0308 From: Axelson, William L Sent: Thursday, December 08, 2005 1:34 PM To: LavEra, Ron Cc: Eagens, Laura

Subject:

well data exec summary Pis update this ASAP and turn this over to Laura before you go on vacation-expectation is to distribute this to the team daily including Mayer bill

On-Site Monitoring Wells Sorted by Well Location Executive Summary December 8th ID Date Location Sample Results MWV-30 11/22/2005 FSB Leakage Area -

Note: Well development 464, 000 to 600, 000 pCi/l NOT completed HTO MWV-38 12/2/2005 End of IP-3 15000 pCi/l HTO - False Discharge Canal Positive due to sample Concrete contamination.

MWV-38 12/5/2005 End of IP-3 Discharge Canal Concrete ND/HTO MWV-38 12/6/2005 End of IP-3 Discharge Canal Concrete ND/HTO ID Date Location Sample Results MW-ill 9/28/2005 Transformer Yard 212,000 pCi/. HTO MW-ill 10/5/2005 Transformer Yard 188,000 pCi/I HTO MW-lll 10/14/2005 Transformer Yard 682 pCi8, 0TO (heavy rain)

MW-lll 10/14/2005 Transformer Yard 632 pCi/l HTO (back-up)

MW-ill .10/21/2005 Transformer Yard 284,000 pCi/I HTO MW-lll 10/28/2005 Transformer Yard 218,000 pCi/I HTO MW-lll 11/4/2005 Transformer Yard 302,000 pCi/l HOT MW-ill 11/10/2005 Transformer Yard 246,000 pCill HTO MW-lll 11/18/2005 Transformer Yard 171,000 pCi/i HTO MW-lll 11/22/2005 Transformer Yard 180,000 pCi/l HTO MW-lll 11/30/2005 Transformer Yard 125,000 pCi/l HTO ID Date Location Sample Results MW-107 9/28/2005 NEM ND/HTO MW-108 9/28/2005 GT-1 ND/ITO MW-108 11/4/05 GT-1 NDJHTO MW-109 9/28/2005 GT-1 ND/HTO MW-109 11/04/2005 GT-1 NDJHTO MW_EXE-1.DOC Page 1 of 5

. I On-Site Monitoring Wells Sorted by Well Location Executive Summary December 8th ID Date Location Sample Results U-'-1 10/6/2005 U3 Discharge Canal 417 pCi/l HTO U-'-1 10/21/2005 U3 Discharge Canal ND/HTO U2-1 10/28/2005 U3 Discharge Canal ND/HTO U2-1 11/4/2005 U3 Discharge Canal ND.HTO U2-1 11/10/2005 U3 Discharge Canal NDJHTO U3-1 11/22/2005 U3 Discharge Canal ND/HTO U3-2 10/6/2005 U3 Discharge Canal 960 DpCi/N TO U2-2 10/21/2005 U3 Discharge Canal ND/HTO U2-2 10/28/2005 U3 Discharge Canal ND/HTO U3-2 11/4/2005 U3 Discharge Canal ND/HTO, U.-2 11/10/2005 U3 Discharge Canal ND/HTO U3-2 11/22/2005 U3 Discharge Canal ND/HTO U3-3 10/6/2005 U3 Discharge Canal 439 pCi/i HTO U3-3 10/21/2005 U3 Discharge Canal ND/HTO U3-3 10/28/2005 U3 Discharge Canal ND/HT T.

U3-3 11/4/2005 U3 Discharge Canal ND/HTO U3-3 11/10/2005 U3 Discharge Canal 471 pCi/l HTO U3-3 11/22/2005 U3 Discharge Canal ND/HTO U3-4 U3 Condensate 399 pCi/I HTO U3-3 10/21/2005 Polisher U34 U3 Condensate 405 pCi/l HTO 10/28/2005 Polisher U34 U3 Condensate ND/HTO 11/4/2005 Polisher U3-4 U3 Condensate ND/HTO 11/10/2005 Polisher U3-4 U3 Condensate ND/HTO 11/22/2005 Polisher U3-T1 U3 South Turbine 11/22/2005 Polisher 703 pC/

U3-T1 10/21/2005 U3 South Turbine NDJHT O U3_T1 10/28/2005 U3 South Turbine ND/HTO U3-T1 11/4/2005 U3 South Turbine ND/HTO U3-T1 11/10/2005 U3 South Turbine 563 pCi/HT TO U3-T1 11/2/2005 U3 South Turbine ND/HTO MW_EXE-1 .DOC Page 2 of 5

i I l i On-Site Monitoring Wells Sorted by Well Location Executive Summary December 8th U$;-T2 10/6/2005 U3 North Turbine 1,590 pCi/I HTO U$;-T2 10/21/2005 U3 North Turbine 1,470 pCi/I HTO U,-T2 10/28/2005 U3 North Turbine 1,280 pCi/l HTO U,-T2 11/4/2005 U3 North Turbine 1,190 pCi/i HTO U3;-T2 11/10/2005 U3 North Turbine 1,640 pCi/i HTO UE-T2 11/22/2005 U3 North Turbine ND/HTO 1,:4 I G)..;... C, . d i . . . .

MW_EXE-1.DOC Page 3of 5

I:t r On-Site Monitoring Wells Sorted by Well Location Executive Summary December 8th MW-11 350000 300000 a 250000 J 200000 0

0 -- MW-lll 0

  • ^. 150000 100000 50000 0

, \\ ;'-

10 O -I'1t) 10 10 LO o o 0 a 0 0 o 0 '-o 0 0 0 o o 0 0 0 0 o 0 0 0 0 0 Z.' C'J ,, ' C\J Zr c.'J _ 0 CD, C.'I C' CY) 0

!! 0 0 -.. Z-  ! C',

0) 0 0 0 - _

_ CM' T_

Date MW_EXE-1.DOC Page 4 of 5

On-Site Monitoring Wells Sorted by WellLocation Executive Summary December 8th .

U3-T2 1800 1600 1400 1200 1000 I

0 l-*- U3-T2

0. 800 600 400 200 0 -I.

to to to to LO to) to LO 0 0 To 0 0 0 0 0 0 0 0 0 Ns 0_ N 0

C) 0 C) N 1~5

.1-0_ 0o at Date MW_EXE-1.DOC Page 5 of 5

1 I On-Site Monitoring Wells Executive Summary 12/8/05 Date ID Location Sample Results 9/28-29/05 MW-107 NEM ND/HTO MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO MW-1ll Transformer Yard 212,000 pCi/A HTO 110/5/05 MW-111 Transformer Yard 188,000 pCi/l HTO 110/6/05 U3-1 U3 Discharge Canal 417 pCi/l HTO U3-2 U3 Discharge Canal 960 pCi/l HTO U3-3 U3 Discharge Canal 439 pCi/l HTO U3-TI U3 South Turbine 703 pCi/l HTO U3-T2 U3 North Turbine 1,590 pCi/l HTO 10/14/05 MW-Ill Transformer Yard 682 pCi/A HTO (heavy rain)

_ I - ..* .

1 MW-ill. Transformer Yard 632 pCi/I HTO (back-up) 1D/21/05 M~W-ill Transformer Yard 284,000 pCi/l HTO 1D/21/05 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 399 pCi/l HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,470 pCi/A HTO 10/28/05 MW-i11 Transformer Yard 218,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U34 U3 Condensate Polisher 405 pCi/I HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,280 pCi/l HTO 11/4/05 MW-i ii Transformer Yard 302,000 pCi/l HOT U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal NDJHTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/A HTO 1 GAaxelson\mw_execsumm.doc

On-Site Monitoring Wells Executive Summary 12/8/05 Date ID Location Sample Results ]

11/3-4/05 MW-108 GT-1 ND/HTO MW-109 GT-l ND/HTO 11/10/05 MW-111 Transformer Yard 246,000 pCi/A HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal 471 pCi/l HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 563 pCi/A HTO

_ U3-T2 U3 North Turbine 1,640 pCi/l HTO 11/18/05 MW-111 Transformer Yard 171,000 pCi/l HTO 11/22/05 MW-111 Transformer Yard 180,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO ~

U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine ND/HTO 11/30/05 MW-111 Transformer Yard 125,000 pCi/l HTO 12/2/2005 MW-38 End of IP-3 Discharge 15000 pCi/l HTO - False Canal Concrete Positive due to sample

__ contamination.

12/5/2005 MW-38 End of IP-3 Discharge ND/HTO

._ Canal Concrete 12/6/2005 MW-38 End of IP-3 Discharge ND/HTO

__ Canal Concrete Monitoring Wells / Locations Off-Site Date Location Results 10/18/05 Croton Reservoir ND/HTO - Gamma Camp Field Reservoir ND/HTO - Gamma 10/20/05 Gypsum ND/HTO - Gamma Algonquin ND/HTO - Gamma 5 th Street Well ND/HTO - Gamma 10/25/05 Rock Quarry ND/HTO - Gamma

_1/8/05 5 th Street Well ND/HTO - Gamma 2 G:\axelson\mw_execsumm.doc: