ML061000668

From kanterella
Jump to navigation Jump to search
E-mail from D. Croulet of Entergy to Various, Regarding Well Status
ML061000668
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/12/2005
From: Croulet D
Entergy Nuclear Operations
To: Noggle J
Division of Reactor Safety I
References
FOIA/PA-2006-0081
Download: ML061000668 (2)


Text

tars, N

_ -OgLL e-e W\ ell Status 12-9-05 Page1.

'1 From: "Croulet, Donald" <doroule @entergy.com>

To: "Conroy, Pat" <PConroy~entergy.com>, "Co ,Mark R" <mcox9O~entergy.com>,

"'tbrice (Dgw.dec.state.ny.us"' <tbrice ©gw.dec.state.ny.us>, "'jdn @nrc.gov"' <jdn @nrc.gov>

Date: 12/12/05 6:14AM

Subject:

FW: Well Status 12-9-05 From: Lavera, Ron Sent: Friday, December 09, 2005 2:18 PM To: Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; Gary Hinrichs; Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Ron Lavera; Ronald Sachatello; T. R. Jones

Subject:

Well Status 12-9-05 Please see the attached.

<<MONITORING WELL STATUSDec_9_2005.doc>>

RLaVera entergy.com <mailto:RLaVera ©entergy.com>

914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308

MONITORING WELL STATUS (Thurs, Dec 9,2005-1413 hrs)

-i I NiTumer T1o Cait ,,- ta.-Us XT bea4 C'...

TLaknples Number Step Taken (Highest Value)

MW-111 Transformer Yard Baseline Sample PT Continue to SampleWeekly 302,000 pCi/i (11/04/05)

MW-30 U-2 SFB Drilled 61' deep Fully Develop Well Raw Water: 399,000 pCi/l (11/23/05)

Transducer installed Packer test Water: 600,000 pCi/1 (11/24/05)

"Developed Well": Not ready for this sample MW-31 MOB side walk Vacuumed to bedrock Ready for drilling MW-32 U-2 SFB Alley Way Vacuum evacuated 6' Ready for drilling MW-33 Transformer Yard Pilot hole cemented Rig moved to hole MW-34 Transformer Yard Within 1" of target depth "Develop" well for sampling MW-35 Transformer Yard Drilling completed "Develop" well for sampling MW-36 U-2 Turbine Bldg Ready for drilling Note: Suitability of well location being analyzed MW-37 U-2 Turbine Bldg Ready for drilling Note: Suitability of well location being analyzed MW-38 South U-3 Boundary Well in service Drilling machine broken.