ML061000668
| ML061000668 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 12/12/2005 |
| From: | Croulet D Entergy Nuclear Operations |
| To: | Noggle J Division of Reactor Safety I |
| References | |
| FOIA/PA-2006-0081 | |
| Download: ML061000668 (2) | |
Text
tars, N
e -
W\\
e ell Status 12-9-05
_ -OgLL Page1.
'1 From:
"Croulet, Donald" <doroule @ entergy.com>
To:
"Conroy, Pat" <PConroy~entergy.com>, "Co,Mark R" <mcox9O~entergy.com>,
"'tbrice (D gw.dec.state.ny.us"' <tbrice © gw.dec.state.ny.us>, "'jdn @ nrc.gov"' <jdn @ nrc.gov>
Date:
12/12/05 6:14AM
Subject:
FW: Well Status 12-9-05 From: Lavera, Ron Sent: Friday, December 09, 2005 2:18 PM To: Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; Gary Hinrichs; Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Ron Lavera; Ronald Sachatello; T. R. Jones
Subject:
Well Status 12-9-05 Please see the attached.
<<MONITORING WELL STATUSDec_9_2005.doc>>
RLaVera entergy.com <mailto:RLaVera © entergy.com>
914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308
MONITORING WELL STATUS (Thurs, Dec 9,2005-1413 hrs)
T C'...
XT 4
1 o C ait,,-
ta.-Us bea TLaknples Step Taken
-i I NiTumer Number (Highest Value)
MW-111 MW-30 MW-31 MW-32 MW-33 MW-34 MW-35 MW-36 MW-37 MW-38 Transformer Yard U-2 SFB MOB side walk U-2 SFB Alley Way Transformer Yard Transformer Yard Transformer Yard U-2 Turbine Bldg U-2 Turbine Bldg South U-3 Boundary Baseline Sample PT Drilled 61' deep Vacuumed to bedrock Vacuum evacuated 6' Pilot hole cemented Within 1" of target depth Drilling completed Ready for drilling Ready for drilling Well in service Continue to SampleWeekly 302,000 pCi/i (11/04/05)
Fully Develop Well Raw Water:
399,000 pCi/l (11/23/05)
Transducer installed Packer test Water:
600,000 pCi/1 (11/24/05)
"Developed Well":
Not ready for this sample Ready for drilling Ready for drilling Rig moved to hole "Develop" well for sampling "Develop" well for sampling Note: Suitability of well location being analyzed Note: Suitability of well location being analyzed Drilling machine broken.