ML061000593

From kanterella
Jump to navigation Jump to search
E-mail from D. Croulet of Entergy to P. Conroy and M. Cox of Entergy and J. Noggle of USNRC, Regarding H-3 Results for Additional Manholes
ML061000593
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/19/2005
From: Croulet D
Entergy Nuclear Operations
To: Conroy P, Noggle J
Entergy Nuclear Operations, Office of Nuclear Reactor Regulation
References
FOIA/PA-2006-0081
Download: ML061000593 (4)


Text

James Noge-f -3 _Res ults f ora addition'al Manh oles i

I I

Page 1 t1 Manholes Page 1 Ii From:

"Croulet, Donald" <dcroule©entergy.com>

To:

"Conroy, Pat" <PConroy~entergy.com>, "Cox, Mark Ra <mcox9Oentergy.com>,

"'James Noggle"' <JDN~nrc.gov>

Date:

12/19/05 3:41 PM

Subject:

FW: H-3 Results for additional Manholes fyi From: AKelson, William L Sent: Monday, December 19, 2005 3:37 PM To: 'Timothy Rice'; 'jrwl @nrc.gov' Cc: Mayer, Don; Sandike, Steven; Leach, Don; Burns, Thomas; Sachatello, Ronald; Quinn, Dennis; Croulet, Donald

Subject:

RE: H-3 Results for additional Manholes Attached are three files of follow-up MH samples taken near the transformer yard From: T mothy Rice © gw.dec.state.ny.us

Sent: Monday, December 19, 2005 2:53 PM To: Axelson, William L

Subject:

H-3 Results for additional Manholes

Bill, I am following up on Friday's notification of H-3 in Manhole #6 in the transformer yard. At that time you stated that the manholes up and down gradient had been sampled, and the data should be available Monday. Do you know what the status of that analytical data is?

Also, I had phone conversation with Mr. John White of the NRC about the pending notification of the stakeholders re: a Wed conf call on this subject. During that call he asked if you could cc him on your response regarding data availability. His e-mail address is jrwl ©nrc.gov <mailto:jrwl @nrc.gov>.

Thanks, Tim

f Week #_(

b w

a Tritium Data Reduction Data Processed: 12/18/05 12:13 AM SAMPLE INFORMATION ANALYSIS DATA SUN Volume Unit #f Sample ID uC;Uml I

UCPM N~otes 1-1 1

2.50 1

2 l

Blank 1

1 7.00E4001 2

2.50 2

Calibration Standard 4.47E-02 m

1.23E+05 3

2.50 2

Control Standard 2.64E-03 7.25E+03 4

2.50 2

mh#2 12-16-05 6.51 E-07 1.79E+00 5

2.50 2

mh#412-16-05 4.32E-06 1.19E+01 6

2.50 2

mh#6 12-16-05 1.22E-05 3.35E+01 7

2.50 2

mh#8 12-16-05 4.51E-06 1.24E+01 8

2.50 2

mh#9 12-16-05 2.14E-06 5.90E+00 9

2.50 2

mh#10 12-16-05 2.94E-06 8.1OE+00 10 2.50 2

mh#17 12-16-05 1.71 E-06 4.70E+00 11 2.50 2

mh#18 12-16-05 8.54E-07 2.35E+00 12 2.50 2

mh#19 12-16-05 1.81 E-06 4.97E+00 CALIBRATION SOURCE DATA S/N 66838-40 Crit Level 1.76E+00 cpm Date of Source:

09/17/03 5.07E-02 uCimlm Efficiency=

49.56%

C"m/dpm.

Dte & Time samplte Cou~nted:

12/18/05 0:12 4.47E-02 uCVm Background=

7.0 cp Performed By: 1 ei -p r

I (NOTE: Background is automatically subtracted from sample counts)

Control Chart Updated:

r4in tifal)

SCINTILAT;9-4 Reviewed By:

I Becekmane (TrIcarb 2900 ) l

9 4

'?- -.

LDCTIm O '

f-Resultsr I1 I i1 CC,(I,,>),

O4, q) TvMi

-W O(9e (42D t)--

Q 0

b051 no+ tw-etsi 432-O no4- -al;cem 12, Zoo

-togv-e, ok' I,

z14 C 2q4 0

..-l? Io H2, 6 n,~ lde, teal O I.

TWIT 2 PAR 0

0 0

___MW 33 MW 34 MW 35 11 11 MH7 El TRANSFORMER 0

- MW II1

-I:I I

II. -

TRANSFORM YARD L

1 M 24 lMH24SSALE ELECTRICM VAUL7 MH 19 _

  • mm

MR 6 h

(STORM DRAIN)

I_

TRANSFORMER MH4 rn MH3 UNIT 2 TURBINE BUILDING