E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for November 2, 2005
ML061000430
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 11/03/2005
From: Mcmullin K
Entergy Nuclear Operations
To: Boska J, Brian Holian, David Lew, Noggle J, Diane Screnci, Neil Sheehan, Jason White
NRC Region 1
References
FOIA/PA-2006-0081
Download: ML061000430 (6)


Text

- __ . __ I - - I .. __ I__.. __ I-__-__ __ -_ -- - - I ve,m-6'er, o_

o rt f -orN_ - 20__

.- 0 L hife-, --IPE Cst a,ib's re D--- Pace 11' Paged Joh W 1jo-6-n- WhtdjE stlu =eor fo Noeme 3:05 From: "McMullin, Kathy" <KMcMuII entergy.com>

To: " ((Promise

@ troopers.state.ny.us)" <"Promise @ troopers.state.ny.us>,"

(Popopeek@aol.com)" <Popopeek@ ao.com>, " Antalek, Tracy" <tracy.antalek@lafarge-na.com>,"

<pauLeddy@?dps.state.ny.us>,"

Baranski, James" <james.baranski@semo.state.ny.us>, "Eddy, Paul" Greeley, Dan" <greeleyd~co.rockland.ny.us>, " Gross, Steve - Orange PIO" <sgross~co.orange.ny.us>,

" Meyer, Sue-Rockland Alt. POlO" <Meyers~ co.rockland.ny.us>, " Sutton, Tony"

<awsl @westchestergov.com>, Adam Stiebeling <abspcbes @ bestweb.net>, "Albanese, Raymond"

<rial ©vtestchestergov.com>, "Anthony Sutton (awsl @weschestergov.com)"

<awsl @weschestergov.com>, "Baker Nancy (bakerna~co.rockland.ny.us)" Robyn"

<bakerr a co.rockland.ny.us>, "Benjamin, Liz" <BenjamniL@co.rockland.ny.us>, Bentley,

<rbentle@entergy.com>, "Blizard, Andrea' <ablizar@entergy.com>, "Bob Outhouse (rjO4@westchestergov.com)" <rjO4 @westchestergov.com>, "Bob Outhouse (rjo4@westchestergov.com.)" Holian

<rjo4@viestchestergov.com>, "Boska John (jpb1 @nrc.gov)" <jpbl ©nrc.gov>, Brian

<bjm~nrc.gov>, "Brian Holian (beh~nrc.gov)" <beh~nrc.gov>, "Bridges Jeff (JBridges @troopers.state.ny.us)" <JBridges ©troopers.state.ny.us>, Chief Tubbs

<Chief Bhubbs ©aol.com>, Chris Schwarz <cschwar©eentergy.com>, "Comiotes, Jim" "Dacimo, Fred"

<JComoot@ entergy.com>, "Curran, Nick" <Nick.curran © mai.house.gov>, "Dirocco, Anthony"

<FFacino ©entergy.com>, " DeGasperis, Edward" <edegaspO entergy.com>,

<ADiroc'O ©entergy.com>, "Don Maurer (Donald.Maurer ©semo.state.ny.us)" "Fay, Deborah"

<Donald.Maurer@ semo.state.ny.us>, "Dowling, Adele" <amnd2@westchestergov.com>,

<DFayl P entergy.com>, "Feeney Andrew (Andrew.Feeney@ semo.state.ny.us)"

<Andrevi.Feeney@semo.state.ny.us>, "Feroe Peter (peter.feroe? @mail.house.gov)"

ao.com>, "Gibbons Emily

<peter.foroe ©mail.house.gov>, Geri Shapiro <gerishapiro© (Emily.C ibbons @ mail.house.gov)" <Emily.Gibbons ©mail.house.gov>, "Giguere, Kathleen" Troester (grtroes

@ nppd.com)" <grtroes ©nppd.com>, "Gottlieb, Larry"

<KGiguer© entergy.com>, "Glenn Alain"

<LGottli ©entergy.com >, "Greene, Dominick" <dgreene @co.orange.ny.us>, "Grosjean,

<AGrosje ©entergy.com>, "Guiao Frank (Frank.Guiao @lafarge-na.com)"

<Frank.Guiao @lafarge-na.com>, "Huber, John T." <jhube90 @entergy.com>, "Inzirillo, Frank" "Jensen,

<finziri ©aentergy.com>, "Jeff Tkacs jefft@ townofcortlandt.com)" <jefft @townofcortlandt.com>,

<JEESi westchestergov.com>, "Jim Seymour Chris" <.ensenc@co.rockland.ny.us>, JES R."

aseymo'ir@cityofpeekskill.com)" <jseymour cityofpeekskill.com>, "Jones, T.

Michael" <MKansle @ entergy.com >, "Kopy Mike

<tjones2 ©entergy.com >, "Kansler, (MKopy,9troopers.state.ny.us)" <MKopy@troopers.state.ny.us>, "Kraus Kevin (kevin.kraus ©semo.state.ny.us)" <kevin.kraus ©sem o.state.ny.us>, "Leach, Don" (DCL©nrc.gov)"

<DLeach©entergy.com >, "Leon, Pete" <Pete.Leon ©mai.house.gov>, "Lew David @entergy.com>,

co.rockland.ny.us>, "McCann, John" <jmccanl

<DCL@nrc.gov>, "Longo, Nick" <dongon@?

"McCannell, Chris" <Chris.mccannell@mail.house.gov>, "McConaghy, Ryan"

<ryan-_1cConaghy©schumer.senate.gov>, "McGillicuddy, Maura" <MMcGill <cdrbob3l @entergy.com>, "McKay, County" @aol.com>,

Mike" <rnike.mckayQrmai.house.gov>, "McMahon, Bob - Putman "McMull n, Kathy" <KMcMuIIentergy.com>, "Miller CJ (MillerC~ co.rockland.ny.us)"

Neil Sheehan <nas@nrc.gov>,

<MierC©co.rockland.ny.us>, "Mitchell, Frank" <FMitche@entergy.com>,

<rand~schidasset.com>, "Noggle Jimadn~nrc.gov)"

"Nevelolf Rand (rand~schildasset.com)"

<adam.paulson © mai.house.gov>, "Phillips, Frank"

<jdn ©n c.gov>, "Paulson, Adam" Thomas"

<fphilli C entergy.com>, "Pillors, Brenda" <Brenda.pillors © mail.house.gov>, "Poquette, "Realmuto M.

<thoma.;.poquette@lafarge-na.com>,"PRIDE, ANN L" <APRIDE©entergy.com>,

(MRealrnut@troopers.state.ny.us)" <MRealmut@troopers.state.ny.us>, "Rubin, Paul"

<prubin 1 entergy.com>, "Screnci, Diane" <dps @nrc.gov>, "Sheiner, Jon" "Steets, Jim"

<Jon.Sheiner©rmai.house.gov>, "Slobodien, Mike" <MSlobod ©entergy.com>, Carl

<JSteet,, sentergy.com>, "Theobalds, Ken" <KTheobo entergy.com>, "Tramontana (cat7 @vestchestergov.com)" <cat7 westchestergov.com>, "White John arwl © nrc.gov)"

<jrwl @nrc.gov>

Date: 11/3/05 5:12PM

Subject:

IPEC status report for November 3, 2005

A ce i John White - IPEC status report for November 3, 2005 .I- --- - _-,! __ _ - - _ _ . _- P

-a e 2 Indian Point Energy Center Daily Status Report November 3, 2005 Operational Status Indian Point Unit 2 is operating at 100% and has been online 334 days.

Indian Point Unit 3 is operating at 100% reactor power and has been on-line for 30 days. Operations crews are performing routine tests, maintenance and surveillances.

Entergy is continuing the investigation into a leak in the IP2 spent fuel pool. Experts in hydrology and ground water modeling have been hired to assist in the investigation.

The NRC is continuing its special inspection on the spent fuel pool issue. The inspection began on September 22 and is on-going.

Entergy Briefs Stakeholders on Spent Fuel Pool Issues Over forty attendees representing federal, state, and local government as well as New York agencies and business leaders attended a briefing at Indian Point on the spent fuel pool issues at IPEC. Program Manager, Don Leach reviewed the key steps taken by Entergy to investigate two small cracks found on the south wall of the IP2 spent fuel pool. He indicated that the investigation, which is still on going, involves an inspection of the fuel pool liner, installation of new monitoring wells near the IP2 spent fuel pool, and on-going sampling and analysis. Mr. Leach discussed the early results of the fuel liner inspection which revealed three small potential flaws near the southwest corner of the fuel pool.

Don Mayer, director special projects, briefed the attendees on the work underway to inspect the IPI spent fuel and eventually move the fuel to dry cask storage. As part of the inspection, water level was raised in the pool and subsequently water moved between the interconnecting pools. The site has an engineering analysis underway to help understand the water balance in the system.

Participants then went inside the protected areas to see the south pool wall at IP2 and several of the currently used monitoring wells.

A map of monitoring well locations was provided to attendees and is attached to this report.

_John White- IPEC status report for November 3, 2005 Page 311 BM_40154Updated Dry Cask Storage Factsheets Available Entergy has produced an updated informational brochure, available in electronic and hardcopy format that explains the details of dry cask storage. Contact Andrea Blizard at 914-271-7081 or by return email at kmcmul @entergy.com <mailto:kmcmullentergy.com> for a copy.

Entergy Nuclear Northeast provides customized outreach education programs for schools, youth groups, and civic organizations. The topics we cover include Emergency Planning, Understanding Radiation, Nuclear Fuel and a general overview of the operations of Indian Point Energy Center. If you would like a brochure or are interested in scheduling a program, contact IPEC Communications at 914-271-7441.

If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914-271-7132.

CC: "Sandy Galef (galefs ©assembly.state.ny.us)" <galefs @assembly.state.ny.us>

[John White - TEXT.htrn Page 1 1II John White TEXT.htrn Page Indian Point Energy Center Daily Status Report November 3, 2005 Operational Status Indian Point Unit 2 is operating at 100% and has been online 334 days.

Indian Point Unit 3 is operating at 100% reactor power and has been on-line for 30 days. Operations crews are performing routine tests, maintenance and surveillances.

Entergy is continuing the investigation into a leak in the IP2 spent fuel pool. Experts in hydrology and ground water modeling have been hired to assist in the investigation.

The NRC is continuing its special inspection on the spent fuel pool issue. The inspection began on September 22 and is on-going.

Entergy Briefs Stakeholders on Spent Fuel Pool Issues Over forty attendees representing federal, state, and local government as well as New York agencies and business leaders attended a briefing at Indian Point on the spent fuel pool issues at IPEC. Program Manager, Don Leach reviewed the key steps taken by Entergy to investigate two small cracks found on the south wall of the IP2 spent fuel pool. He indicated that the investigation, which is still on going, involves an inspection of the fuel pool liner, installation of new monitoring wells near the IP2 spent fuel pool, and on-going sampling and analysis. Mr. Leach discussed the early results of the fuel liner inspection which revealed three small potential flaws near the southwest comer of the luel pool.

John White - TEXT.htrn -ag P-- 2 Don Mayer, director special projects, briefed the attendees on the work underway to inspect the IPI spent fuel and eventually move the fuel to dry cask storage. As part of the inspection, water level was raised in the pool and subsequently water moved between the interconnecting pools. The site has an engineering analysis underway to help understand the water balance in the system.

Part cipants then went inside the protected areas to see the south pool wall at IP2 and several of the currently used monitoring wells.

A map of monitoring well locations was provided to attendees and is attached to this report.

Updated Dry Cask Storage Factsheets Available Entergy has produced an updated informational brochure, available in electronic and hardcopy format that explains the details of dry cask storage. Contact Andrea Blizard at 914-271-7081 or by return email at kmcmull enterqV.com for a copy.

EntErgy Nuclear Northeast provides customized outreach education programs for schools, youth groups, and civic organizations. The topics we cover include Emergency Planning, Understanding Radiation, Nuclear Fuel and a general overview of the operations of Indian Point Energy Center. If you would like a brochure or are interested in scheduling a program, contact IPEC Communications at 914-271-7441.

If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914-271-7132.

.John White - wells 11 05.pdf Page 1