ML061000399
| ML061000399 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 11/29/2005 |
| From: | Croulet D Entergy Nuclear Operations |
| To: | Noggle J Division of Reactor Safety I |
| References | |
| FOIA/PA-2006-0081 | |
| Download: ML061000399 (3) | |
Text
.
--.1..
-. -
. I I 1, 1. -
I.. -
I --
I - ---
-1
[4TjsNqggl
1_!5paqs
Page 1 From:
To:
Date:
Subject:
(yAJ "Crqt, Donald" <dcroule@entergy.com>
"'jdn©nrc.gov"' <jdn@nrc.gov>
11/29/05 3:42PM FW: EPRI Reports
- Jim, Some more OE information that was pursued regarding the spent fuel pool leak.
From: Lavera, Ron Sent: Tuesday, November 29, 2005 3:01 PM To: Hinrichs, Gary; Leach, Don; Rutkoske, Michael; Croulet, Donald; Mayer, Don; Axelson, William L
Subject:
RE: EPRI Reports Gary & D)on Croulet This is E. follow up on the question from the 10:00 AM meeting today about what we have done to check other available sources of information.
Gary - Just so you know, I down loaded theoreports you sent me on the dates indicated below:
TR-1003196 GuideAssess RadElementsLicense_Term 2-23-2004 TR-1003025 Decommiss Pre-Plan Man 2001 8-15-2002 TR-1003424 SFP Cleaning and Purification Sys 5-30-2002 TR-1 008015 Strategies for Managing Liquid Effluents 12-10-2003 With reclards to what we have done to check other sources of information, please see the following:
I've also attended the EPRI Ground Water Contamination Workshop conducted in Nov. 2005.
I've registered for the January 2006 MARSSIM "Multi Agency Site Survey and Investigation Manual" course I've personally contacted several people at Salem to discuss their SFP Leak.
During the course of an early team meeting, we talked with JAF about their SFP Leak Since 9-1-05, the discovery of the leak, I've also down loaded the following "project" related EPRI documents:
TR-1003030_Determining Background_Decommission TR-1011730_GroundWaterMonitoring Criteria TR-1011731_Decommissioning Workshop 3rd TR-1011732_SiteRelease_2004-Workshop CS-3629_GroundWaterModeling_Parameters CS-3901-V2_GroundWaterManualVol2 EN-6853 Prediction Movement Porous Media S-7534-ViGroundWaterManual_Voll NP-4037_RadionuclideCorrLLW TR-1000583_CoalPileGroundWater Qualityjnvestigation TR-1000584_GroundwaterTreatmentFueloilSpill TR-1000671_LLWConfTritiumMonitoring rR-1000733_ModelAssessRiskReleaseto_Rivers TR-1001023_GroundWaterAbatement rR-100576_Mixing Plume PennetrationGroundWater
I James NoQqIe - FW: EPRI Reports Page 2 [
James Nocqle
- FW: EPRI Reports Page 2I TR-1006710_TritiumRemovalMeidaEvaluation TR-1009903_TritiumManagement TR-101063_Validating GroundWatermodels TR-1 011410_LLWConf-2004_Tritium TR-101998_TransporLtofTritium rR-103205_ComplianceMonitoringDetection_Levels TR-1004663 Capturing Knowledge rR-1011411_ASMO-EPRIRWWorkshop TR-1011728 Liquid-WasteProcessing 2005 Since 9-1-05, the discovery of the leak, I've also down loaded the following "project" related NRC documents:
in200405_SFPLeakage Nureg cr6837_Nuclear Piping Reg Guide RG-01-086_TerminationOperating License Reg Guide RG-04-014_QualityAssurance EnvironmentaLMonitoring-1977 Reg Guide RG_8-32_TritiumMonitoring ML0037063640_July Resolution SpentFuelPoolIssues ML0037064120_FolIlowUpSFP. Issuesm-r y ML0109602460_ResolutionSpent Fuel-Pool Safety issues NUREG-1549: Decision Methods for Dose Assessment to Comply With Radiological Criteria for License Termination 36fr21793_Plan for Updating and Consolidating Decomm ANL-datacollectionHandbookANL-EAIS-8_1993
~ANLEADTM_02_04_RESRAD Doehandbook sur17624_HandbookMeasurementMethodsLowLevelActivity BTP H100829-01_DRAFT BRANCH TECHNICAL POSITION ON SITE CHARACTERIZATION FOR ML0313506270_CharacterizationFordecommissioning ML0316007140_BTPSiteCharacterizationDecommissioning mou2finMEMORANDUM OF UNDERSTANDINGEPA-NRC NUREG-1720_Re-evaluation of the Indoor_Decomm NUREG-cr6821_Solubility and LeachingDecomm NUREG-srl620rl_Standard Review Plan forDecomm NUREG-sr1748_Environmental ReviewGuidance NUREGCR-5512 _Residual_ContamFromDecomm NUREG-cpO187-UncertaintyEnvironMonitorMeas NUREG-cr6853_GaussianTransport NUREG-cr6843_HydrolicUncertainty NUREG-cr6876_Buried Piping EPA_402-r-96-011a_intro_Radiation_Site_Cleanup MARLAPProtocoL Final_402-b-04-001a-final NUREG-cr6567_Low-Level RadioactiveClass_Char Since 9-1-05, the discovery of the leak, I've also down loaded the following "project" related EPA documents:
EPA_402-r-96-011 a_introRadiation_Site Cleanup MARSSIM - Multi Agency Site Survey Investigation Manual I checked the INPO web site but was unable to separate out much of interest.
_James Noggle-FW: EEPRI Reports P
Please note that if there was a document that I had already down loaded in the past, but was identified in one of the searches that I conducted, it will not appear in this list of recently checked documents.
Gary, thanks for the information.
Ron LaVera RLaVera~entergy.com <mailto:RLaVera@entergy.com>
914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308 From: Hinrichs, Gary Sent: Tuesday, November 29, 2005 1:20 PM To: Lavora, Ron
Subject:
FW: EPRI Reports fyi From: Gray, Jack Sent: Tuesday, November 29, 2005 9:57 AM To: Hinrichs, Gary Cc: Leach, Don
Subject:
EPRI Reports
- Gary, A couple more that may be of use.
Jack
<< File: Decommissioning Pre-Planning Manual.pdf >>
<< File:
SFP Cooling and Cleanup Systems 000000000001 003424[1 ].pdf >>
<< File: Strategies for Managing Liq Effluents.pdf >>
<< File: Assessing Radiological Elements for License Termination.pcif >>
J. A. Gray, Jr.
Senior Project Manager Entergy Nuclear Operations, Inc.
440 Hamlilton Ave. Mail Stop 11 D White P ains, NY 10601 Phone (914) 272-3372 Cell (914) 715-0167 Fax (914) 272-3469 jgray4@entergy.com <mailto:jgray4 @entergy.com>