Correction of Typographical Errors in Issuance of Amendments Dated March 9, 2006
ML060970478
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 05/10/2006
From: Banerjee M
Plant Licensing Branch III-2
To: Crane C
Exelon Generation Co
Banerjee M, NRR/ADPT, 415-2277
Shared Package
ML061320003 List:
References
TAC MC7312, TAC MC7313
Download: ML060970478 (11)


Text

May 10, 2006 Mr. Christopher M. Crane, President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - CORRECTION OF TYPOGRAPHICAL ERRORS IN ISSUANCE OF AMENDMENTS DATED MARCH 9, 2006 (TAC NOS. MC7312 AND MC7313)

Dear Mr. Crane:

We recently found typographical errors in the following amendments issued by the Nuclear Regulatory Commission (Commission):

Amendments to Renewed Facility Operating Licenses Nos. DPR-29 and DPR-30 for Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2, issued on March 9, 2006, regarding feedwater trip setpoints, used an incorrect amendment number of 330 for QCNPS, Unit 1, when the correct amendment number should have been 230. In addition, the word Renewed has been added to affected pages to reflect the operating license status.

The errors, inadvertently introduced, are corrected in the enclosed QCNPS Technical Specification pages 3.3.2.2-1, 3.3.2.2-2, and 3.3.2.2-3, and other associated pages of the March 9, 2006, letter. The Notice of Issuance published in the Commission's biweekly Federal Register notice on March 28, 2006 (71 FR 15492), regarding the amendment is also being corrected.

Sincerely, Maitri Banerjee, Senior Project Manager /RA/

Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-254 and 50-265

Enclosures:

Corrected pages to Issuance of Amendment dated March 9, 2006 for QCNPS cc w/encls: See next page

Mr. Christopher M. Crane, President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - CORRECTION OF TYPOGRAPHICAL ERRORS IN ISSUANCE OF AMENDMENTS DATED MARCH 9, 2006 (TAC NOS. MC7312 AND MC7313)

Dear Mr. Crane:

We recently found typographical errors in the following amendments issued by the Nuclear Regulatory Commission (Commission):

Amendments to Renewed Facility Operating Licenses Nos. DPR-29 and DPR-30 for Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2, issued on March 9, 2006, regarding feedwater trip setpoints, used an incorrect amendment number of 330 for QCNPS, Unit 1, when the correct amendment number should have been 230. In addition, the word Renewed has been added to affected pages to reflect the operating license status.

The errors, inadvertently introduced, are corrected in the enclosed QCNPS Technical Specification pages 3.3.2.2-1, 3.3.2.2-2, and 3.3.2.2-3, and other associated pages of the March 9, 2006, letter. The Notice of Issuance published in the Commission's biweekly Federal Register notice on March 28, 2006 (71 FR 15492), regarding the amendment is also being corrected.

Sincerely, Maitri Banerjee, Senior Project Manager /RA/

Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-254 and 50-265

Enclosures:

Corrected pages to Issuance of Amendment dated March 9, 2006 for QCNPS cc w/encls: See next page DISTRIBUTION:

PUBLIC RidsOgcRp RidsNrrPMMBanerjee LPLIII-2 R/F RidsAcrsAcnwMailCenter MRing,RIII RidsNrrDorlLplf GHill (4) RidsNrrDirsIoeb RidsNrrLADClarke RidsNrrDirsItsb RidsNrrDORlDpr Package ADAMS Accession Number: ML06132003 - Ltr ML060970478 - TS ML061310396 OFFICE PM: LPL3-2 LA:LPL3-2 BC:LPL3-2 NAME MBanerjee:ca DClarke DCollins DATE 04/27/2006 04/25/2006 05/10/2006 OFFICIAL RECORD COPY

Corrected Pages to Issuance of Amendment Dated March 9, 2006 for Quad Cities Nuclear Power Station, Units 1 and 2

March 9, 2006 Mr. Christopher M. Crane, President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS RE: FEEDWATER SYSTEM AND MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION (TAC NOS. MC7312 AND MC7313 )

Dear Mr. Crane:

The Commission has issued the enclosed Amendment No. 230 to Renewed Facility Operating License No. DPR-29 and Amendment No. 225 to Renewed Facility Operating License No. DPR-30 for the Quad Cities Nuclear Power Station, Units 1 and 2, respectively. The amendments are in response to your application dated June 15, 2005.

The amendments revise Technical Specification (TS) 3.3.2.2, ?Feedwater System and Main Turbine High Water Level Trip Instrumentation, to reflect a design change in the instrumentation logic that trips the three feedwater pumps and main turbine.

A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.

Sincerely,

/RA/

Maitri Banerjee, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-254 and 50-265

Enclosures:

1. Amendment No. 230 to DPR-29
2. Amendment No. 225 to DPR-30
3. Safety Evaluation cc w/encls: See next page

EXELON GENERATION COMPANY, LLC AND MIDAMERICAN ENERGY COMPANY DOCKET NO. 50-254 QUAD CITIES NUCLEAR POWER STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 230 License No. DPR-29

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Exelon Generation Company, LLC, et al.

(the licensee) dated June 15, 2005, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Renewed Facility Operating License No. DPR-29 is hereby amended to read as follows:

B. Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 230, are hereby incorporated into the renewed facility operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of its issuance and shall be implemented prior to start-up from the spring 2007 refueling outage for Unit 1.

FOR THE NUCLEAR REGULATORY COMMISSION Mindy S. Landau, Acting Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: March 9, 2006

EXELON GENERATION COMPANY, LLC AND MIDAMERICAN ENERGY COMPANY DOCKET NO. 50-265 QUAD CITIES NUCLEAR POWER STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 225 License No. DPR-30

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Exelon Generation Company, LLC, et al. (the licensee) dated June 15, 2005, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Renewed Facility Operating License No. DPR-30 is hereby amended to read as follows:

ATTACHMENT TO LICENSE AMENDMENT NOS. 230 AND 225 RENEWED FACILITY OPERATING LICENSE NOS. DPR-29 AND DPR-30 DOCKET NOS. 50-254 AND 50-265 Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by number and contain marginal lines indicating the area of change.

Remove Insert 3.3.2.2-1 3.3.2.2-1 3.3.2.2-2 3.3.2.2-2

--- 3.3.2.2-3

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 230 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-29 AND AMENDMENT NO. 225 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-30 EXELON GENERATION COMPANY, LLC AND MIDAMERICAN ENERGY COMPANY QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-254 AND 50-265

1.0 INTRODUCTION

By letter to the Nuclear Regulatory Commission (NRC, Commissioin) dated June 15, 2005 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML051730461), Exelon Generation Company, LLC, et al. (the licensee) requested changes to the technical specifications (TSs) for Quad Cities Nuclear Power Station, Units 1 and 2 (Quad Cities). The proposed amendment would revise TS 3.3.2.2, ?Feedwater System and Main Turbine High Water Level Trip Instrumentation and the related bases.

2.0 REGULATORY EVALUATION

The NRC staff finds that the licensee in Section 5.2 of its submittal identified the applicable regulatory requirements. The regulatory requirements for which the NRC staff based its acceptance are the Commissions regulatory requirements for TS changes set forth in the Title 10 of the Code of Federal Regulations (10 CFR), Section 50.36, ?Technical Specifications, for this evaluation. Specifically, 10 CFR 50.36(c)(2) specifies the requirements for limiting conditions for operation (LCO), and 10 CFR 50.36(c)(3) specifies the surveillance requirements (SRs). In addition, the NRC staff considered guidance and information in NUREG-1433,

?Standard Technical Specifications General Electric Plants BWR/4, Revision 3, in its evaluation.

3.0 TECHNICAL EVALUATION

The NRC staff has reviewed the licensees regulatory and technical analyses in support of its proposed license amendment which are described in Section 4.0 of the licensees submittal.

The detailed evaluation below will support the conclusion that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

Quad Cities Nuclear Power Station Units 1 and 2 cc:

Site Vice President - Quad Cities Nuclear Power Illinois Emergency Management Station Agency Exelon Generation Company, LLC Division of Disaster Assistance &

22710 206th Avenue N. Preparedness Cordova, IL 61242-9740 110 East Adams Street Springfield, IL 62701-1109 Quad Cities Nuclear Power Station Plant Manager Exelon Generation Company, LLC Document Control Desk - Licensing 22710 206th Avenue N. Exelon Generation Company, LLC Cordova, IL 61242-9740 4300 Winfield Road Warrenville, IL 60555 Regulatory Assurance Manager - Quad Cities Exelon Generation Company, LLC Senior Vice President of Operations 22710 206th Avenue N. Exelon Generation Company, LLC Cordova, IL 61242-9740 4300 Winfield Road Warrenville, IL 60555 Quad Cities Resident Inspectors Office U.S. Nuclear Regulatory Commission Vice President - Licensing and Regulatory 22712 206th Avenue N. Affairs Cordova, IL 61242 Exelon Generation Company, LLC 4300 Winfield Road David C. Tubbs Warrenville, IL 60555 MidAmerican Energy Company One River Center Place Director - Licensing and Regulatory 106 E. Second, P.O. Box 4350 Affairs Davenport, IA 52808-4350 Exelon Generation Company, LLC 4300 Winfield Road Vice President - Law and Regulatory Affairs Warrenville, IL 60555 MidAmerican Energy Company One River Center Place Assistant General Counsel 106 E. Second Street Exelon Generation Company, LLC P.O. Box 4350 200 Exelon Way Davenport, IA 52808 Kennett Square, PA 19348 Chairman Manager Licensing - Dresden, Quad Cities Rock Island County Board of Supervisors and Clinton 1504 3rd Avenue Exelon Generation Company, LLC Rock Island County Office Bldg. 4300 Winfield Road Rock Island, IL 61201 Warrenville, IL 60555 Regional Administrator U.S. NRC, Region III 801 Warrenville Road Lisle, IL 60532-4351