|
---|
Category:E-Mail
MONTHYEARML24298A0202024-10-24024 October 2024 NRR E-mail Capture - Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, Relief Request I4R-19 and I4-26, Associated with the Fourth and Fifth Inservice Inspection Intervals ML24282A7042024-10-0808 October 2024 NRR E-mail Capture - Acceptance Reviews of Relief Requests Associated with the Fifth Inservice Inspection Interval at Byron and Braidwood Stations ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24180A0042024-06-28028 June 2024 NRR E-mail Capture - Acceptance Review for Braidwood and Byron - Request for Exemption from 10 CFR 50.46 and Appendix K (L-2024-LLE-0019) ML24180A0032024-06-28028 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment for Transition to Framatome Gaia Fuel (L-2024-LLA-0072) ML24176A0182024-06-20020 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Remove Extraneous Detail Related to Beacon ML24170A3912024-06-18018 June 2024 NRR E-mail Capture - Revision of Estimated Hours to Complete Review of Byron/Braidwood Amendment to Revise TS 3.7.15, 3.7.16, and 4.3.1 (L-2023-LLA-0136) ML24141A2452024-05-20020 May 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Delete Technical Specification 5.6.5.b.5 (L-2024-LLA-0055) ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24053A3382024-02-22022 February 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML24039A0412024-01-30030 January 2024 NRR E-mail Capture - Request for Additional Information Regarding Braidwood Request for Alternative (I4R-18) ML24030A0022024-01-30030 January 2024 NRR E-mail Capture - NRC Acceptance Review for Braidwood Station, Units 1 and 2, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request – ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23304A0222023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Braidwood 1 & 2 - Exemption from Security Rule (L-2023-LLE-0030) ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23103A4692023-04-12012 April 2023 NRR E-mail Capture - NRC Acceptance Review of Braidwood Request for Amendment to Revise TS 3.7.9 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0172022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0172021-09-0303 September 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood - License Amendment to Revise Technical Specification 3.7.9, Ultimate Heat Sink ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21154A0162021-06-0202 June 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application 2024-09-06
[Table view] Category:NRC Preliminary Notification of Event/Occurrence
MONTHYEARPNO-III-24-001, Braidwood, Braidwood Nuclear Generating Plant Expiration of Security Officer Union Contract2024-04-0101 April 2024 PNO-III-24-001: Braidwood, Braidwood Nuclear Generating Plant Expiration of Security Officer Union Contract ML17165A4592017-06-14014 June 2017 PNO-III-2017-001: Braidwood Station, Units 1 and 2; Release of Circulating Water Containing Tritium Using an Unauthorized Release Path PNO-III-11-005, Braidwood Unit 2 Unusual Event Due to Loss of All Control Room Annunciators2011-03-24024 March 2011 PNO-III-11-005, Braidwood Unit 2 Unusual Event Due to Loss of All Control Room Annunciators PNO-III-10-014, A; Update - Shutdown of Braidwood Reactors Unit 1 & 22010-08-23023 August 2010 PNO-III-10-014A; Update - Shutdown of Braidwood Reactors Unit 1 & 2 ML1022902932010-08-17017 August 2010 PNO-III-10-014 - Shutdown of Braidwood Reactors Unit 1 & 2 PNO-III-10-001, Braidwood Station Declaration of Unusual Event Due to Fire within the Protected Area2010-01-11011 January 2010 PNO-III-10-001: Braidwood Station Declaration of Unusual Event Due to Fire within the Protected Area PNO-III-09-007, A: Unusual Event at Braidwood Unit 2 Due to Loss of Offsite Power Unit Will Remain Shut Down for More than 72 Hours (Update)2009-08-0505 August 2009 PNO-III-09-007A: Unusual Event at Braidwood Unit 2 Due to Loss of Offsite Power Unit Will Remain Shut Down for More than 72 Hours (Update) PNO-III-06-020, Braidwood, Nrc'S Review of Exelon'S Plans for Resuming Radioactive Discharges Through the Braidwood Blowdown Line2006-09-0808 September 2006 PNO-III-06-020: Braidwood, Nrc'S Review of Exelon'S Plans for Resuming Radioactive Discharges Through the Braidwood Blowdown Line PNO-III-06-015, Braidwood Tritium Contamination Issues (Update)2006-06-13013 June 2006 PNO-III-06-015: Braidwood Tritium Contamination Issues (Update) PNO-III-06-011, Braidwood: Tritiated Steam Released to the Environment2006-04-0707 April 2006 PNO-III-06-011, Braidwood: Tritiated Steam Released to the Environment PNO-III-06-007, Braidwood 1 and 2 - Tritium Contamination Issues2006-03-30030 March 2006 PNO-III-06-007: Braidwood 1 and 2 - Tritium Contamination Issues PNO-III-05-016, D Braidwood Tritium Contamination Issues (4th Upgrade)2006-03-15015 March 2006 PNO-III-05-016D Braidwood Tritium Contamination Issues (4th Upgrade) ML0603405832006-02-0303 February 2006 PNO-III-05-016C Potential Off-Site Migration of Tritium Contamination (3rd Update) ML0601806232006-01-18018 January 2006 PNO-III-05-016B: Braidwood Potential Off-Site Migration of Tritium Contamination (2nd Update) ML0618400692005-12-0909 December 2005 E-mail from Habighorst to Lynch, Braidwood Tritium - Recent Contamination Contours, Etc ML0609706112005-12-0707 December 2005 NRC Email from Justine Burza to Pn Recipients PNO-III-05-016A ML1020302372005-12-0707 December 2005 Preliminary Notification of Event or Unusual Occurrence ML0609700692005-12-0101 December 2005 NRC Email W/Att, from Jan Strasma to Richard Skokowski Et Al Draft Pn on Braidwood ML0533505122005-12-0101 December 2005 PNO-RIII-05-016 Braidwood Potential Off-site Migration of Tritium Contamination ML0609700572005-12-0101 December 2005 Email for Dale Ambler to Steven Orth Attendees at Pn Debrief ML0609700592005-12-0101 December 2005 NRC Email from Anne Boland to Geoffrey Grant and James Caldwell PNO-RII-05-016 ML0618401842005-12-0101 December 2005 E-mail from Boland to Shane, NRC Notification Braidwood PNO-III-05-013, ; Braidwood Forced Outage Due to Reactor Coolant Pump Leak-Off in Excess of Vendor Recommendations2005-09-13013 September 2005 PNO-III-05-013; Braidwood Forced Outage Due to Reactor Coolant Pump Leak-Off in Excess of Vendor Recommendations 2024-04-01
[Table view] |
Text
bteven UrtflA IIlve Attendeesat rat o -A- Attendees Orth iFN dkreP:ei debriet Paq1 From: <dale'ambler@ exeloncorp.com>
To: <skoXnrc.gov>
Date: Thu, Dec 1, 2005 3:58 PM
Subject:
Attendees at PN debrief Action Required:
Recommendation:
Steve - here are the attendees at the PN debrief you conducted:
Tom O'Neil, Vice President Licensing and Regulatory Services Craig Nesbit, Corporate Communications Director Jim Meister, Vice President Nuclear Services Al Haeger, Corporate Senior Programs Specialist Keith PoIson, Braidwood Station Site Vice President John Moser, Braidwood Station Radiation Protection Manager Dale Ambler, Braidwood Station Regulatory Assurance Manager The FAX number to send the PN to is as follows: 815-417-4718 This e-mail and any of its attachments may contain Exelon Corporation proprietary information, which is privileged, confidential, or subject to copyright belonging to the Exelon Corporation family of Companies.
This e-mail is intended solely for the use of the individual or entity to which it is addressed. If you are not the intended recipient of this e-mail, you are hereby notified that any dissemination, distribution, copying, or action taken in relation to the contents of and attachments to this e-mail is strictly prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender immediately and permanently delete the original and any copy of this e-mail and any printout. Thank You.
1VSteven Orth - Braidwood PN 3 , ,, ___ Pag 1 From: James Lynch To: Chris Miller; Elizabeth Hayden; Peter Habighorst; Raeann Shane; Undine Shoop Date: Thu, Dec 1, 2005 4:40 PM
Subject:
Braidwood PN Attached is the PN issued today regarding the Braidwood (Illinois) potential off-site migration of tritium contamination.
Jim Lynch (630) 829-9661 CC: Anne Boland; Geoffrey Grant; James Caldwell; Janet Schlueter; Richard Skokowski; Roland Lickus; Rosetta Virgilio; Steven Orth; Steven Reynolds
jSteven Orth -PNO RAIP-05-016.wpd Page 1-December 1, 2005 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE-- PNO-RiII-05-016 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region Ill staff on this date.
Facility Licensee Emergency Classification Braidwood 1 and 2 _ Notification of Unusual Event Exelon Generation Co. _ Alert Braceville, Illinois _ Site Area Emergency Docket: 50-456 and 50-457 _ General Emergency License: NPF-72; NPF-77 X Not Applicable
SUBJECT:
POTENTIAL OFF-SITE MIGRATION OF TRITIUM CONTAMINATION DESCRIPTION:
On November 30, 2005, the licensee informed the resident inspectors and Region III (Chicago) that elevated levels of tritium (the radioactive isotope of hydrogen) had been measured in groundwater on the Braidwood site and that the tritium may have moved in groundwater off the site.
The licensee believes that the tritium in the groundwater is a result of past leakage from a pipe which normally carries non-radiation circulating water discharge to the Kankakee River, about five miles from the site. Significant leakage occurred from the pipe in November 1998 and December 2000, flooding a portion of the plant site with an estimated 3 million gallons of water in each occurrence. A small leak of a few gallons also occurred in May 2005.
The discharge pipe is also used for planned liquid radioactive effluent releases with the effluent mixing with the non-radiation circulating water being discharged. (Braidwood, like most nuclear plants, releases small concentrations of radioactive liquids under controlled and monitored conditions and within limits imposed by the NRC.) Planned releases were made at the time the leakage occurred in 1998 and 2000 which accounts for the presence of tritium in the groundwater. There have been no planned releases from the plant which exceeded NRC discharge limits.
The licensee has measured tritium levels in shallow onsite monitoring wells as high as 58,000 picocuries per liter. This level of tritium, if released from the site, would be a small fraction of NRC limits for radioactive effluent releases to the environment.
In the vicinity of the onsite monitoring wells where elevated tritium levels have been measured, there are three homes and a larger parcel of vacant land with undeveloped lots. The licensee believes the movement of the groundwater is away from the homes and toward the vacant CONTACTS:
John House Steven Orth
Page I[Steven Orth - PNO R.-111-05-016.wpd ISteven Orth PNO R-lll-05-016.wDd Pacie221 630/829-9824 630/829-9827 PNO-RIII-05-016 property. The licensee has contacted the homeowners and collected well water samples to be analyzed by an independent laboratory. The licensee is also drilling monitoring wells on the vacant site. The initial sample results are expected to be available on December 2, 2005.
The licensee has notified local officials and the State of Illinois of the elevated tritium measurements. The licensee is also planning to issue a news release.
Region Ill has dispatched a radiation specialist to the site to assist the resident inspectors in their review of the circumstances surrounding the elevated measurements and the licensee's plans to address the elevated tritium levels.
Region Ill was notified of the elevated measurements on November 30, 2005. The information in this preliminary notification has been reviewed with licensee management and is current as of 3:30 p.m. on December 1, 2005.