IPEC Dry Cask Storage/Isfsi Project Team from Entergy
ML060950208
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/30/2005
From: Schwartz G
Entergy Nuclear Northeast
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2006-0020
Download: ML060950208 (1)


Text

A--

,v Entehgya Mf!clear N!VC'!?tv5 IPEC Dry Cask Storaqe/ISFSI Proiect Team April 2005 zzQ4-Geoff Schwartz Project Manager (914) 734-.684 Pager fIax (914) 827-7617 Tom Shaffer MechdStruct.

Planner (914) 734-6826 John Luke Elec. Planner (914) 734-6828 Hank Santis Project Construction Manager (914) 469-2048 John Skonieczny Registered PE Project Engineer (914) 827-7772

  • II Gary Hinrichs Project Manager :

Licensing, Procedures, '

Training (914) 734-6690 Dave Smith Scheduling and Work Order Coord.,

QA and Assessments (914) 734-6691 I

Ed Salisbury Rad Waste Engineer (914) 734-5313 I

Larry Barnes (914) 734-6827 Mike Durfee (914) 734-6829 Project Construction Supervisors Architect-Engineer Enercon Services. Inc.

Bob Evers, IPEC Site Project Manager (914) 734-6694 Ron Miranda, Sr. Proj. Mgr.

(973) 601-0510

  • Cask System Supplier Holtec Intemational Crane Supplier
  • PaRNuclear/Ederer George Wegrich, Project Manager.

(206) 622-4421 x232 Eric Bush Project Manager (856) 797-0900 I I I

Sandy Bryant Pat Handy HP Techs.

Rocky Crucitti Jesse Delameter RW Techs.

l I

Geotechnical Eng.

Tectonic George Murphy (845) 534-5959 I

FSB Loading Bay Floor Constructor Antonucci/Farren Co.

GZA (Environmental)

Dan Stapleton Chad Cox Low Profile Transporter Supplier Hilman Rollers Gary Van Iderstine (732) 462-6277 II1 Peggy Farabaugh Outreach ISFSI Constructor Morris Park Contracting Co.

I Misc. Mod Constructor Stone & Webster I ifmtmon In this red " NdOW in accordance With the Freedom af Ifnamn?.