GE Energy, Annual Report for Getr, 2005, Report No. 47
ML060860313
Person / Time
Site: Vallecitos File:GEH Hitachi icon.png
Issue date: 03/23/2006
From: Juan Ayala
General Electric Co
To:
Document Control Desk, NRC/FSME
References
DWT-2006-06 Report No. 47
Download: ML060860313 (5)


Text

4 GE Energy Juan G.Ayala Acting Mgr, Regulatory Compliance & EHS Juanl.Ayola~ge.com Thursday, March 23, 2006 File Copy DWT-2006-06 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Annual Report for GETR, 2005

Reference:

License TR-1, Docket 50-70

Enclosure:

Annual Report No. 47 (3 copies)

Enclosed are three signed copies of Annual Report No. 47 for the deactivated General Electric Test Reactor (GETR) located at Vallecitos Nuclear Center near Sunol, California.

If there are any questions or additional information required, please contact me at the number below.

Sincerely Yours, ain G.Ayagr ep

/Acing Manager, R~gulatory Compliance & EHS General Electric Company GEI\ EVallecitos Nuclear Center Mail Code V-18 6705 Vallecitos Rd Sunol, CA 94586 T.925.862.4342 f02c0 AOOjI

4 GE Nuclear Energy Vallecitos Nuclear Center General Electric Company Sunol, Califomia GENERAL ELECTRIC TEST REACTOR (DEACTIVATED)

ANNUAL REPORT NO. 47 FOR THE YEAR 2005 LICENSE TR-1 DOCKET 50-70 MARCH 2006

General Electric Test Reactor (Deactivated)

Annual Report No. 47 General Electric Company has maintained the General Electric Test Reactor (GETR) in a deactivated status under the authority of Amendment No. 16 to License TR-1, Docket 50-70, issued September 30, 1992. In this annual report, a summary of the status of the facility for the period of January 1, 2005 to December 31, 2005 is presented.

1.0

SUMMARY

The facility remains in essentially the same condition described in Annual Report No. 46. Entry into the reactor building was made for routine radiation surveys and a general examination of conditions throughout the building.

Radiation levels remain essentially unchanged.

2.0 STATUS OF FACILITY In accordance with written procedures, the Facility Manager controls access to the containment building and general systems. The facility continues to be in deactivated status. There were no changes authorized by the Facility Manager pursuant to 10CFR50.59(a) and completed in 2005.

3.0 RADIATION AND CONTAMINATION The data below are from sample and dosimeter results accumulated during 2005. These data are for the entire VNC site and include the effects of operations other than GETR.

3.1 GETR Stack Not operated.

3.2 Air Monitors (Yearly average of all meteorological stations.)

Four environmental air monitoring stations are positioned approximately 90 degrees apart around the operating facilities of the site. Each station is equipped with a membrane filter that is changed weekly and analyzed for gross alpha and gross beta-gamma.

Page 1 of3

I GETR Annual Report No. 47 Alpha Concentration:

Maximum, 4.5E-1 3 giCi/cc (predominantly radon-thoron daughter products)

Average, 1.9E-14 itCi/cc Beta Concentration:

Maximum, 7.3E-13 p.Ci/cc Average, 4.6E-14 gCi/cc 3.3 Gamma Radiation The yearly dose results for the year 2005 as determined from evaluation of site perimeter environmental monitoring dosimeters showed no departure from normal stable backgrounds.

3.4 Vegetation No alpha, beta or gamma activity attributable to activities at the GETR facility was found on or in vegetation in the vicinity of the site.

3.5 Off-Site Samples taken off the site indicate normal background for the area.

4.0 ACTIVITIES Routine inspections were conducted during this report period. There were no preventive or corrective maintenance activities performed having safety significance during the reporting period.

5.0 ORGANIZATION The management and operations organization for the GETR is described in Technical Specification 6 (Figure 1) of License TR-1. The organizational structure remained the same, The Level 1 Organizational Head for 2005 was S. A. Bump. The Level 2 Facility Manager during 2005 was C. W. Bassett.

6.0 CONCLUSION

The General Electric Company concludes that the deactivated GETR is being maintained in a safe shutdown condition. The inspections, access control, and administratively controlled activities ensure maximum protection for the public health and safety. The procedures will be Page 2 of 3

GETR Annual Report No. 47 continued to maintain this high level of protection.