March 23, 2006 Mr. Theodore Sullivan Site Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - FITZPATRICK NUCLEAR POWER PLANT
Dear Mr. Sullivan:
In a telephone conversation on March 16, 2006, Mr. Joseph DAntonio, Senior Operations Engineer, and Mr. Greg Pitts, Operations Training Superintendent (Acting), made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the FitzPatrick Nuclear Power Plant facility. The inspection is planned for the weeks of May 22, 2006 and May 29, 2006, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; 4) the examination schedule, sample plan, and operating tests for the weeks of the inspection; and 5) additional materials requested in the March 16 conversation to the NRC by May 15, 2006. Mr. Pitts has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the
Mr. T. Sullivan 2
Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, D.C. 20503-0001.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Joseph DAntonio at (610) 337-5085.
Sincerely,
/RA/
Richard J. Conte, Chief Operations Branch Division of Reactor Safety Docket No. 50-333 License No. DPR-59 cc w/encl:
G. Taylor, CEO, Entergy Operations, Inc.
M. Kansler, President, Entergy Nuclear Operations, Inc (ENO)
J. Herron, Sr, VP and Chief Operating Officer, (ENO)
C. Schwarz, VP, Operations Support (ENO)
K. Mulligan, General Manager, Plant Operations (ENO)
O. Limpias, VP, Engineering (ENO)
J. McCann, Director, Licensing (ENO)
C. Faison, Manager, Licensing (ENO)
M. Colomb, Director of Oversight (ENO)
D. Wallace, Director, Nuclear Safety Assurance (ENO)
J. Costedio, Manager, Regulatory Compliance (ENO)
T. McCullough, Assistant General Counsel (ENO)
P. Smith, President, New York State Energy Research and Development Authority P. Eddy, New York State Department of Public Service S. Lyman, Oswego County Administrator Supervisor, Town of Scriba C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law J. Sniezek, PWR SRC Consultant M. Lyster, PWR SRC Consultant S. Lousteau, Treasury Department, Entergy Services M. Jacobs, Manager - Training and Development
Mr. T. Sullivan 3
Distribution: (VIA E-MAIL)
S. Collins, RA M. Dapas, DRA B. McDermott, DRP D. Jackson, DRP B. Sosa, RI OEDO R. Laufer, NRR J. Boska, PM NRR P. Milano, PM (backup)
G. Hunegs, DRP - NRC Senior Resident Inspector D. Dempsey, DRP, Resident Inspector K. Kolek, Resident OA J. DAntonio, DRS Examiner, DRS C. Bixler, DRS (OL Facility File)
L. Vick, HOHB, NRR R. Conte, DRS DOCUMENT NAME: E:\\Filenet\\ML060830068.wpd ADAMS PKG: ML052200402 SISP Review Complete: JMD (Reviewers Initials)
After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler CJB JDAntonio JDA RJConte RJC DATE 03/22/06 03/22/06 03/23/06 OFFICIAL RECORD COPY