ML060830018
| ML060830018 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 03/23/2006 |
| From: | Boska J Plant Licensing Branch III-2 |
| To: | Kansler M Entergy Operations |
| References | |
| Download: ML060830018 (1) | |
Text
ECCS - Operating 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.2 Verify that each ECCS manual, power operated, 31 days and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.
SR 3.5.2.3 Verify each ECCS pump's developed head at the In accordance with test flow point is greater than or equal to the the Inservice required developed head.
Testing Program SR 3.5.2.4 Verify each ECCS automatic valve in the flow 24 months path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
SR 3.5.2.5 Verify each ECCS pump starts automatically on 24 months an actual or simulated actuation signal.
SR 3.5.2.6 Verify, for each ECCS throttle valve 24 months listed below, each position stop is in the correct position.
Valve Numbers SI-856B SI-856G SI-2165 SI-2170 SI-856C SI-856H SI-2166 SI-2171 SI-856D SI-856J SI-2168 SI-2172 SI-856E SI-856K SI-2169 (continued)
INDIAN POINT 3 3.5.2-3 Amendment230