Text
- 8 0 5 + 5 45+3459 3-21-06; 6
- 53AM;0CPP FIFTH F-L.
EAST m,
Pacific Gas and f6r jmElectric Company t
2 /
7 I.1., :.
Diablo Canyon Power Plant Pa. Box 56 Avila Beach. CA 93424 James EL Becker Vice President-Diablo Canyon Operations and Station Director January 15, 2004 805.545.3462 Fax: 805.545.4234 PG&E Letter DCL-04-003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units I and 2 Monthly Operating Report for December 2003
Dear Commission6rs and Staff:
Enclosed is the Monthly Operating Report for Diablo Canyon Power Plant, Units 1 and 2, for December 2003. This report is submitted in accordance with Technical Specification 5.6.4 and NRC Generic Letter 97-02.
Sincerely, J
R James R. Becker smg/1 713/R0253694 Enclosures cc/enc:
Paul R. Fox, American Nuclear Insurers Robert D. Glynn, Jr.
Bruce S. Mallett, NRC Regional Administrator, Region IV David L. Prouix, NRC Senior Resident Inspector Gregory M. Rueger Girija S. Shukla, NRC Project Manager INPO Record Center I
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway a Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project
- Wolf Creek
b-;b31-ug; 8
AM;OU9P F5FTH FL.
EAST
- 805f545+3 4 5V PG&E Letter DCL-04-003 DECEMBER 20(13, OPERATION SUMMARIES DIABLO CANYON POWER PLANT UNITS'1 AND 2 Summary of Unit I Operation Unit I began the month in Mode I (Power Operation) at approximately 100 percent power. On December 10, 2003, operators commenced a planned ramp to below 25 percent power in response to a storm forecast predicting high ocean swells. After the high swell warning had been terminated, on December 11, 2003, operators commenced ramping to approximately 50 percent power and remained at that power level to inspect the condenser for saltwater leakage. After these inspections were completed, operators commenced ramping to full power and reached approximately 100 percent power on December 12, 2003. On December 22, 2003, at 1116 PST, a 6.5M earthquake occurred approximately 50 km NNW from the plant, resulting in an Unusual Event (reference Special Report 2003-04, dated January 5, 2004, DCL-03-184). The units remained at 100 percent power during the seismic event.
Summary of Unit 2 Operation Unit 2 began the month in Mode I at approximately 100 percent power. On December 10, 2003, operators commenced a planned ramp to below 25 percent power in response to a storm forecast predicting high ocean swells. After the swell warning had been terminated, on December 11, 2003, operators commenced ramping to full power and reached approximately 100 percent later that day. With the exception of this planned power change, Unit 2 remained at approximately 100 percent power in December 2003.
Actuations of Pressurizer Safety or Power-Operated Relief Valves There were no challenges to the pressurizer power-operated relief valves, pressurizer safety valves, or steam generator safety valves.
- 8o5+545 345V
,-Z I -Jb E : t::SAI\\J; t.)GwW~l F I \\- I H I-LL LtAST PG&E Letter DCL-04-003 OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-275 Diablo Canyon Unit 1 1102/2004 S. Guess (805) 545-4692 REPORT MONTH: December 2003 I 1. I Design Electrical Rating (Mwe - Net):-
1,103
- 2. ] Maximum Dependable Capacity (Mwe - Net):
1 1,087 l This Month I YTD I Cumulative
- 3. Number of Hours Reactor Critical:
744.0 8,760.0 142,986.8
- 4.
Number of Hours Generator On-Line:
744.0 8,760.0 141,469.6
- 5. Unit Reserve Shutdown Hours:
0.0 0.0 0.01
- 6. Net Electrical Energy Generated (MWH):
781,249 9,585,431 146,791,7301 I
i054545+3459 5/
7 3-21-06; 8:53AM;DCPP FIFTH FL.
EAST PG&E Letter DCL-04-003 UNIT SHUTDOWNS DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-275 Diablo Canyon Unit 1 1/02/2004 S. Guess (805) 545-4692 REPORT MONTH: December 2003
- 1. Reason A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
- 2. Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month 5-Other I
2
- 805+545+3459
-i 3-21-06; 8:53AM;DCPP FIFTH FL.
EAST PG&E Letter DCL-04-003 OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-323 Diablo Canyon Unit 2 1/02/2004 S. Guess (805) 545-4692 REPORT IMIONTH: December 2003 I 1. I Design Electrical Rating (MWe - Net):
L 1119 l l 2. lMaximumDependableCapaci y(MWe -Net):
1 1087 1 This Month YTD Cumulative
- 3. Number of Hours Reactor Critical:
744.0 7,291.4 138,649.9
- 4.
Number of Hours Generator On-l-ine:
744.0 7,226.2 137,114.1
- 5. Unit Reserve Shutdown Hours:
I0.0 0.0 _
0.0
- 6. Net Electrical Energy Generated (MWH):
784,9349 7,725,2271 44,417,217
- I 3
- 80b+b4b-+34b9 V
7/
7 3-21-06; 8:53AM;OCPP FIFTH FL.
EAST PG&E Letter DCL-04-003 UNIT SHUTDOWNS DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-323 Diablo Canyon Unit 2 1/02/2004 S. Guess (805) 545-4692 REPORT MONTH: December 2003
- 1. Reason A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
- 2. Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month 5-Other I
4