ML060740526
| ML060740526 | |
| Person / Time | |
|---|---|
| Site: | Salem, Hope Creek |
| Issue date: | 06/22/2004 |
| From: | Blough A NRC Region 1 |
| To: | Miller H NRC Region 1 |
| References | |
| FOIA/PA-2005-0194 | |
| Download: ML060740526 (6) | |
Text
[A. Randolph Blouqh - Fwd: Chris Bakken Letter Paae 1 I From:
To:
Date:
Subject:
A. Randolph Blough /
a hjml-A, IYI 6/22/04 5:27PM Fwd: Chris Bakken Letter looks OK.
takes on procedural adherence.
I" gy
1t A. Randolph Blough - Chris Bakken Letter Page 1 i 1 A. Randolph Blough - Chris Bakken Letter Page 1 From:
"Malone, George J." <George.Maloneepseg.com>
To:
"'djhenrc.gov"' <djhinrc.gov>, "'ewc~nrc.gov"' <ewcenrc.gov>, "'arbDnrc.gov"'
<arb~nrc.gov>, "'beh~nrc.gov"' <beh@nrc.gov>, "'aep~nrc.gov." <aepenrc.gov>
Date:
6/22/04 5:04PM
Subject:
Chris Bakken Letter enjoy....
George A Letter from Chris Bakken: Last Week's NRC Meeting Last Wednesday we met with the NRC in a public meeting and discussed our plans for improving the performance at Salem and Hope Creek. Overall, the meeting went well. We outlined our plans to improve our performance, as well as our key metrics we will use to track our progress in creating a strong safety conscious work environment. After the discussion, representatives from the public and the NRC gave their impression of our performance and plans.
While the NRC was pleased we would be sharing our metrics publicly so they could track our progress, they expressed significant concern about our procedure adherence. They pointed to numerous examples in the various assessments where we made a procedure change on the spot to resolve an issue, which might otherwise have affected our performance. I agree this is an area we need to address promptly, and I have asked that it be addressed by the end of this week. Procedure adherence is a basic standard that we must follow and it has to be reinforced at all levels in our organization.
The expectation is simple. We need to follow the procedure as written. If we cannot, we need to place the plant or equipment in a safe condition and have the procedure corrected. Make no mistake; I do not want anyone to feel they can work around a procedure deficiency.
Those from the public who spoke at the meeting were skeptical about our chances of being successful. They've heard all the plans and promises before; however, they also acknowledged what makes this time different from the others. This time we'll present our metrics for the public to see and monitor. With the public watching, our plans and promises can't and won't be empty. The only way we'll convince people we've improved is by delivering on our promises and showing the results.
Two reporters covered the meeting, one from the Sunbeam and another from Platts, an industry news agency. The day after the meeting, Carl Fricker, Jim Hutton and I took the reporter from Inside the NRC on a tour of the station.
I think the reporter was pleased we took time for him and with our candor.
Coming out of Hope Creek, we had a difficult time getting past the Rad Monitors. Out of the six of us on the tour, five of us, including the reporter, had to have our shoes wiped down to remove some contamination we picked up from the Refuel Floor. I don't know if this impacted the reporter's story, but the Radiation Protection employees who helped us out at the Control Point were top notch. Although I wasn't pleased with the contamination, how it was handled demonstrated the personal responsibility and ownership we have for our station.
Unfortunately, during the tour, I overlooked something that has been bothering me since I let it happen. Heading up to the refuel floor at Hope Creek, the elevator opened with two technicians already on board. Rather than complete their rounds, I watched the technicians get off so our tour group could get on. It wasn't until after the doors closed that I realized what happened. Their supervisor asked them to step off so our group wasn't
LA. Randolph Blough - Chris Bakken Letter Page 2 delayed, being on a tight schedule.
There's no doubt that stakeholder management is important. Although I do appreciate the courtesy shown to us, I don't want to establish the impression or expectation that my visitors or me need any special treatment.
The fact is we all have jobs to do and my time is no more important than anyone else's. I have since reached out to the two employees and hope they accept my apology.
The information contained in this e-mail, including any attachment(s), is intended solely for use by the named addressee(s). If you are not the intended recipient, or a person designated as responsible for delivering such messages to the intended recipient, you are not authorized to disclose, copy, distribute or retain this message, in whole or in part, without written authorization from PSEG. This e-mail may contain proprietary, confidential or privileged information. If you have received this message in error, please notify the sender immediately. This notice is included in all e-mail messages leaving PSEG. Thank you for your cooperation.
1t A. Randolph Blough - Mime.822 Pae 1 A A. Randolph Blouqh - Mime.822 Paie I Received: from igate.nrc.gov [148.184.176.31]
by NRNWMS05.NRC.GOV; Tue, 22 Jun 2004 17:03:32 -0400 Received: from pseg.com (smtpl.pseg.com [208.208.47.112) by smtp-gateway SMTP id i5ML2QcgOO:2020; Tue, 22 Jun 2004 17:02:27 -0400 (EDT)
Received: from ([172.16.1.52])
by ctmxOl.pseg.com with ESMTP; Tue, 22 Jun 2004 17:02:46 -0400 Received: by njnwkmxO7.newark.pseg.com with Internet Mail Service (5.5.2657.72) id <NB6BGFHW>; Tue, 22 Jun 2004 17:02:29 -0400 Message-ID: <A3BD57259B9AD21lAl6800805FA7A3EOOCOEAOC5@njnbumxO2.nbu.pseg.ozm>
From: "Malone, George J." <George.Malone~pseg.com>
To: "djh~nrc.goV" <djh~nrc.gov>, "'ewc~nrc.gov" <ewcenrc.gov>,
"'arb@nrc.gov". <arb~nrc.gov>, "'beh@nrc.gov" <beh@nrc.gov>,
"'aep~nrc.gov"' <aep~nrc.gov>
Subject:
Chris Bakken Letter Date: Tue, 22 Jun 2004 17:01:49 -0400 MIME-Version: 1.0 X-Mailer: Internet Mail Service (5.5.2657.72)
Content-Type: text/plain; charset="iso-8859-1" enjoy....
George A Letter from Chris Bakken: Last Week's NRC Meeting Last Wednesday we met with the NRC in a public meeting and discussed our plans for improving the performance at Salem and Hope Creek. Overall, the meeting went well. We outlined our plans to improve our performance, as well as our key metrics we will use to track our progress in creating a strong safety conscious work environment. After the discussion, representatives from the public and the NRC gave their impression of our performance and plans.
While the NRC was pleased we would be shar ng our metrics publicly so they could track our progress, they expressed significant concern about our procedure adherence. They pointed to numerous examples in the various assessments where we made a procedure change on the spot to resolve an issue, which might otherwise have affected our performance. I agree this is an area we need to address promptly, and I have asked that it be addressed by the end of this week. Procedure adherence is a basic standard that we must follow and it has to be reinforced at all levels in our organization.
The expectation is simple. We need to follow the procedure as written. If we cannot, we need to place the plant or equipment in a safe condition and have the procedure corrected. Make no mistake; I do not want anyone to feel they can work around a procedure deficiency.
Those from the public who spoke at the meeting were skeptical about our chances of being successful. They've heard all the plans and promises before; however, they also acknowledged wha: makes this time different from the others. This time we'll present our metrics lfor the public to see and monitor. With the public watching, our plans and promises can't and won't be empty. The only way we'll convince people we've improved is by delivering on our promises and showing the results.
Two reporters covered the meeting, one from Ihe Sunbeam and another from Platts, an industry news agency. The day after the meeting, Carl Fricker, Jim Hutton and I took the reporter from Inside the NRC on a tour of the
A. Randolph Bloup h - Mime.82 station.
I think the reporter was pleased we took time for him and with our candor.
Coming out of Hope Creek, we had a difficult time getting past the Rad Monitors. Out of the six of us on the tour, five o1 us, including the reporter, had to have our shoes wiped down to remove some contamination we picked up from the Refuel Floor. I don't know if this impacted the reporter's story, but the Radiation Protection employees who helped us out at the Control Point were top notch. Although I wasn't pleased with the contamination, how it was handled demonstrated the personal responsibility and ownership we have for our station.
Unfortunately, during the tour, I overlooked something that has been bothering me since I let it happen. Heading up to the refuel floor at Hope Creek, the elevator opened with two technicians already on board. Rather than complete their rounds, I watched the technicians get off so our tour group could get on. It wasn't until after the doors closed that I realized what happened. Their supervisor asked them to step off so our group wasn't delayed, being on a tight schedule.
There's no doubt that stakeholder management is important. Although I do appreciate the courtesy shown to us, I don't wait to establish the impression or expectation that my visitors or me need any special treatment.
The fact is we all have jobs to do and my time is no more important than anyone else's. I have since reached out to the two employees and hope they accept my apology.
The information contained in this e-mail, including any attachment(s), is intended solely for use by the named addressee(s). If you are not the intended recipient, or a person designated as responsible for delivering such messages to the intended recipient, you are not authorized to disclose, copy, distribute or retain this message, in whole or in part, without written authorization from PSEG. This e-mail may contain proprietary, confidential or privileged information. If you have received this message in error, please notify the sender immediately. This notice is included in all e-mail messages leaving PSEG. Thank y:u for your cooperation.
W C:TEMP\\GW100001.TMP-I I I e
.. =1
.. n......
_._.MH
__Paae 1 I C:TM\\GIOOI.M Pal Mail Envelope Properties (40D8A43A.D43: 9: 34932)
Subject:
Creation Date:
From:
Created By:
Fwd: Chris Bakken Letter 6/22/04 5:27PM A. Randolph Blough ARB(nrc.gov Recipients nrc.gov kpl1po.KPDO HJM1 (hjml)
Action Delivered Opened Downloaded Deleted Date & Time 06/22/04 05:27PM 06/23/04 04:46PM 06/29/04 06:3 1AM 08/03/04 04:22PM Post Office kpl_po.KPDO Delivered 06/22/04 05:27PM Date & Time 06/22/04 05:27PM Route nrc.gov Files MESSAGE Mail Options Auto Delete:
Expiration Date:
Notify Recipients:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
To Be Delivered:
Status Tracking:
Size 575 No None Yes Standard No None No Standard Immediate All Information