ML060740412
| ML060740412 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 03/13/2006 |
| From: | Pace P Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML060740412 (2) | |
Text
SAFEGUARDS INFORMATION Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 March 13, 2006 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C. 20555 10 CFR 50.54(p)
Gentlemen:
In the Matter of Tennessee Valley Authority
)
Docket Nos.50-327 50-328 SEQUOYAH NUCLEAR PLANT -
UNITS 1 AND 2 -
REVISED PHYSICAL SECURITY PLAN (PSP)
This letter provides changes to the Sequoyah PSP and is being submitted pursuant to 10 CFR 50.54(p)(2).
The changes are included in the enclosure.
The enclosure contains "Safeguards Information" as defined in 10 CFR 73.21.
TVA therefore requests that the enclosure be withheld from public disclosure.
There are no regulatory commitments identified in this submittal.
If you have any questions about these responses, please contact J. D. Smith at (423) 843-6672.
Sincerely, P. L. Pace Manager, Licensing and Industry Affairs Enclosure NOTE: WHEN SEPARATED FROM THE ATTACHED THIS PAGE IS "DECONTROLLED.
i/I 115-SAFEGUARDS INFORMATION Printed on recyWed paper
4 SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission Page 2 March 13, 2006 cc (Enclosure):
Dr. William D. Travers Regional Administrator, Region II U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30323-8931 Safeguards Information Classification Does Not Apply To This Page When Separated From The Attachment.
SAFEGUARDS -INFORMATION