ML060690514

From kanterella
Jump to navigation Jump to search
Teator Notes of Interview of (Deleted)
ML060690514
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 03/09/2004
From: Teator J
NRC/OI
To:
References
FOIA/PA-2005-0194
Download: ML060690514 (8)


Text

-3 ) tl 11a1fM an-1SA REQUESTIONS PREPPED BY COUNSEL AS TO HOW TO ANSWER (AiSTIONS/(

COUNSEL/DID YOU INFORM YOUR MGMT OF THIS INTERVIA JWTHEM ABOUT WHAT WAS DISCUSSED l s I

AN*E FRQM_

QUESTION AREAS describe union management Interview Date:,P Counsel SRO LICENSED??,

Subject will raise concerns and has done so -

Subject would raise concerns if necessary -

I I

Others do raise concerns -

Others don't or hesitate to raise concerns -.

Experienced retaliation for raising concerns (if yes, Identify for self or others) -

the incident as an example of. for example:

1-4 616 1itco POTENTIAL SALEM SCWE ISSUE 8%pg~XISSUES 6

A-A

_-5 -- - ff Information in this record was deleted in accordance with the Freedom of Information Act exemptios d ON&

d

-9

- a

\\L91A

,.i IIw~sJe w rA ar C )

APPROX 2 YEARS AGO S

WTH SALE V

12/13 LEAKING. SPm s AND AOM WANTED LEAK DONE TO DETERMINE)F WAS A PROBLEM -DECISION BY WALDINGER (AND PROBAB O"CONNOR) TO NOT TE "ENGINEER IT AWAY" LOSED A MAIN FEEDWATER STEAM ISOLATION VALVE OUT AU ORIZATION FROM THE CONTROL ROOM SALEM 1, 24 STEAM GENERATOR FEED REG VALVE (FRV) 24BF 19 FAILED approximately mid this as a production over safety issue (p. 12-17+).

TO RESPOND -THE NCOs TLST 1 SRO SHIFT BE D THE VALVE WAS MECHANICALLY BO

... MGMT D T WANT TO CLARE IT MECHANICALLY BO THEREF INOP BEC E THAT WOULD REQUIRE A LCO 3.0.3 S OWN.

ELECTE 0 PURSUE A CONTROLS FAILURE... SHUTDO DELAYED OR ABOUT 3 OURS.

AIWSIUSED A METAL BAR TO PRY A CIRCULATING WATER PUMP B INTO ITS ENERGIZED CUBICLE.

WAGNER TALKED OF 4 POTENTIAL SCWE ISSUES 3

SALEM GRASSING ISSUE - EARLY C 2003 WAS IN ON SOME PHONE CALL AND MEETINGS BUT SINCE SALEM -NOT AS MUCH - MORE EXP WITH HC KEEPING REACTOR POWER AT PROPER LEVEL WITH SITUATION DETERIORATING SUPV BY COMMIYIEE

.\\ -2e---j I

LESS EMOTION THAN TURBINE VALV SUE - RIGHT THING WAS DONE -

WAS IT TIMELY DECISION - "YESif LT GOOD OUT WHERE AND HOW THEY GOT THERE BUT FROM A NLO PERSPECTIVE - W PROBABLY A SCWE ISSUE - HE BROUGHT UP FOR THAT REASON T4 4*TI5V S MAD F-)

TARP

/

lT.RABE1PRO A

lION CANBt TE>>

skRIRP S Tw PA'T PR

)`PERA9J1E IT IS SALEM GRASSING IS

- EARLY MARCH 2003 SOME Sms WANTED M CRULATORS (4 INSTEAD 0

-OCONNOR FELT THOSE ALS WERE "HOLDING TH HOSTAGE"??m KEEPING RE OR POWER AT PROPER LEVEL WITH SITUATION DETER TING SUPV BY lE SIT A6bD f SIT wlf~fON

-ES GOD AOU'FHRE AW EIO THEY BFROM ERSPECTIVE - WAS PRO WSSUE - HE BR7HP UPASON N/A A START-UP CHECKLIST??

LEAK CW #12 NUCJE. SERF WA1R-PI E - UNDE GROUND PIPE D-BtJILDf

.INITIAL-i0PERA DETYION=

QIXERABLE BUT DEGRADED - BY ENGINEERING - WEEKS IN DURATION -

Fj

q.

SBATE APTEALSAFETY T

k tOPEAI3LITY ISSUE FOR 4-6 HOURS PERCEIVED THAT THEY WERE P THEY WERE OPERATING THE PLANT,_t,

    • THE ECONOMICS TAKING PRECEDENCE OVER DECISION MAKING REGARDING PLANT OPERATIONS AND OPERATIONS DECISIONS. DID NOT MEAN ECONOMIC PRESSURE TO KEEP PLANT UP. NEVER BEEN IN MEETING THERE WHERE THAT WAS VERBALIZED.
    • Says even after receiving INPO 3 in 2002, union leade disappointed - said that after meeting plant focus was not safety.

i-fositive, but plant mgmt was to where production over rode If the subject offered information regarding other problems with SCWE, briefly identify (such as the CAP. the processing of notifications. handling of routine maintenance)

WALDINGER READ PEOPLE THE "RI' 4T' FOR WAY THEY WROTE NOTIFICATIONS?? - DAVE SHAV CO CAN HE RAISE/PUSH ISSUE W/O FEARING REPERCUSSION?

FEAR OF BEING H&I FOR RAISING AN ISSyEJ EVER FELT HE COULDN'T RAISE AN ISSUE/dCOCERN?

ER SAW/HEARD/FELT PRODUCTION OVER SAFETY DIRECIE?

EVIAWHEARD NEWARK MGMT DIRECT OR SUPERVISE A DECISION AT PLANT REGARDING SAFETYISTART UP/SHUT DQWN?

BELIEVES UNION LEADERSHIP WOULD A NOT A BIG CHANGE FOR WORSE [N WORK ENVIRONMENT SINCE 7/02 -

TO ALLEGER ASSERTION

"'NO PLANT MGR FOR LAST 3 YEARS - L TO "WHOSE IN CHARGE" MENTALITY

- MANAGEMENT/DECISION BY COMM[If E LED TO MUCH INPUT BY INDIVIDUALS WHO HAD NO DECIS AUTHORITY ORISSUE j us-.' N A-f sft i

I i

i

  • s Io l

f}

s-i

t It r

I' Say evnatrrciigIP n20,uio edrhpsilt, patm a

dIapone adta fe etn ln ou a

o hne oweepouto vrrd safet

If the subject offered information regarding other problems with SCWE. briefly identify (such as the CAP. the processing of notifications. handling of routine maintenance)

FEELS HE CAN RAISE/PUSH ISSUE W/O FVARING REPERCUSSION NEVER A FEAR OF BEING H&I FOR RASIGAN ISSUE NEVER FELT HE COULDN'T RAISE 9 PS4 UE/CONCERN NO NLOs TOLD HIM THIS EITHER - BUT THEY FEEL FRUSTRATED THAT IN ID SAFETY ISSUES - THEY CAN'T 9F1*f FIXED TO THEIR SATISFACTION IN A TIMELY MANNER. SEES THI()S THAT SHOULD BE ID BY NLOs BUT ARE NOT - MAYBE THAT THEY HAVE GIVEN UP RAISING ISSUES.

NEVER SAW/HEARD/FELT PRODUCTION OVE, AFETY DIRECTIVE HE WOULD NEVER LEAVE WHAT HE FELT T/0-6E A TRUE SAFETY ISSUE - I.E TURBINE VALVE ISSUE

(

NEVER SAW/HEARD NEWARK MGMT DIRECT OR SUPERVISE A DECISION AT PLANT REGARDING SAFETY/START UP/pLPJT DOWN BELIEVES UNION LEADERSHIP WOULD SAY NOB BIG CHANGE FOR WORSE IN WORK ENVIRONMENT SINCE 7/02 - CONTRATO ALLEGER ASSERTION NO PLANT MGR FOR LAST 3 YEARS -LED TO "WHOSE IN CHARGE" MENTALITY -

MANAGEMENT/DECISION BY COMMITTEE leED TO MUCH INPUT BY INDIVIDUALS WHO HAD NO DECISION AUTHORITY OVER ISSUE

e HUB'S NEW AREAS TO EXPLORE

-DEREGULATION -

-AWARENESS OF DEREGULATION ENVIRONMENT

-CHANGES IF ANY SEEN IN THE DEREGULATED ENVIRONMIENT

-HOW THIS HAS BEEN COMMUNICATED TO YOU BY UPPER MANAGEMENT

-WAS THERE AN APPROPRIATE BALANCE BETWEEN SAFETY AND PLANT OPERATIONS IN DEREGULATED ENVIRONMENT (1

7-I

, I.

I.

A' Q

-11