ML060690190
| ML060690190 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 03/22/1990 |
| From: | Mohrwinkel C Office of Nuclear Reactor Regulation |
| To: | Meyer D NRC Region 4 |
| References | |
| FOIA/PA-2006-0095 NUDOCS 9003280398 | |
| Download: ML060690190 (6) | |
Text
I
-I'9 b',
.iC;.'
16 EMORANDU!I FOR:
Dolores M.
M te,,Coe.
Resource Harage
-nt Branch.'
Division of Resource'lianagement and Administration, RIV FROM:
Carl Hohrwinkel Regional Tichnical Assistarce Coordinator Inspection and L1centing Program Branch, PMAS, HRR SUCJECT:
REGIOUAL REQUEST FOR TECHNlICAL ASSISTANCE Enclosed is a Regional Request fir HQ technical assistance number 90.05 for a Post-Fire Safe Shutdown Inspection et Wolf Creek, which has been approved by both the technical and projects divisions in NRR. Accordingly, the request has been forwarded to the TAMS Section Chief, Singh Bajwa, for assignment to an appropriate contractor.
If you hive any questions concerning this or other regional requests, please contact me at fTS 492.1209.
Cair Mohrwinkel Regional Technical Assistance Coordinator Inspection and Licensing Program Branch, PfAS, HRR
Enclosure:
As ttated cc w/enclosure:
C. McCracken, KRR A. 7hadani, 1tRR F. Hebdon, INRR cc w/o enclosure:
S. BaJwa L. Wheeler H. Polk Distribution w/enclosure:
Central Fi>t to Butchero JLP8IRFo-o
I C. tlohrwinkel
,:wohrwinkel s I
ss
~~~~~..m.
mm@.ms-**@........ :
mo.U @W-e-@-@---s---l
- 0 sO3) d9'OkdJ
2 t
s!
OFFICIAL RECORn CAOPY FOaRM LEC98 9°,
i i
Ocmat KIM:s CARL'I FORK LETTER ep 84oc* osaovaofX
... I
- t
., If 1
Zd eit OE"X1"CO AJ0 1 :UN WMid WM.' W STATIS NUCLEAR RISaULAITCRY COMMISSION W01o11 Vt Oil RYAN PA2A OMV. SUM tC APILINPN.EUXAS "oil
. " 7,.
I
'tt MtORANtaUM FROM:
SUBJECT:
fORs Carl hohrwinkel Regional Technical Asslstonce Coordinator Inspection and Licensing Program Branch, PHAS, NRR Dolores K. Heyer, Chief Resource Manageent Sel'tioii Division of Resource Kinagewent and Administration Region IV REGIonAL REQUEST FCR M) TEC011CAL ASSISTANCE
£nclosed is Reg10na1 Requwst fcr ) t1etuical Assistance PWu~er 90-05 and a Statement ot Work.
Please cortact us if additional lnforoation Is required.
IDolores I. heyer, Chief Assovrcu Managermnt Section I
Enclosures:
As Stated tooJ*0To yS 9Pooja cP,Docxc Ofoooyea
( IC I
MVIV
..QD7CS7 NIGH
.?IRIT HIGH.'
C;
'd I*: I I OEt/f I/CO.
' X1*U M8nXU DUN W0O A enclosurt 2 RECGIO REQLUT OR *10 7TCHNJC&L ASSISTANCE RtEQUESTID by Vr CONCURRINCE a
X RED m"
LlOW 1.
4TC1'ICAL ItQUMRfltCNTS: (include sustiricatton for rtquest, the mulbirs and tyets of Individuals netded by discipline, the tttlirted level of effort, ntd tun it wtill be needed.)
Technical assistance Is requested for Region IV to assist an NQC Inspection In the perfomance of Inspection of rost-ffre safe shutdown capability at Wolf Creek Gnerating Station.
STAD(' Of VORIKAttached
.E l
ti.
1YYI T' TDN I
orF arCttn sTy REGIOKL COOmtIKAtOat
?IA=rt DIRECTOIATS a tc t
(CSC)3 1 j UAC S ICS) 4_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4D wnss CC st ?r F A 4b131f i, K TS: Claf. v, ~sv I.
7~ sf O r r-( 4rc.t*
tr COWlIMltS: (Sa-mse or 7A resomruss lead 4itidviulso rnf %,,,-s Ot~t,%v a
0 0
0 S
tE of USt= 0 InEIONW I9 U-~
.0v "Ot &4 4 CZ/
U AMTIOI t I.UTJ0N UAlS MSat)
(Act)
_-mmmm~
,STATEM TITLE:
Fire Protect
-NRC TEAM LEADER:
Claude
, A.
ackround t
' d
- C fI-C DUN.WOUS HET OF WC-RK rOR TPSK ASSIGNENT
,ion Inspection, WClf Creek Generating Station E. 3ohnsc-no fTS 72848282 411111
. I I
Central Design Criteria 3 (CDC 3),
Fire Protection,. of Appendix A to
.10 CFR 50 requires that structurei, systems and components IMportant to safety be designed and located to minimize he adverse effects of fires and explosions, nd to be consistent with other safety requirements.
Woncorbustible and heat resistent materials are rtequired to be used whenever practical. CDC 3 alst. requires that firt detection and suppression systems of appropriate capacity and capability be provided and designed to minimize the Sceorse effects of fires on structures, systems, and components Important to safety and that fire fighting systens be designed to ensure that their failure, rupture, or inadvertent operation does not significantly impair the safety capabilities of these structures, systems, and comporents.
Either the staff guidance contained In ?ranch Technical Position (STP)
CKEB 9.5-1, In Section 9.54 of NUREC.oo, 'Standard Review Plan or th cowtifnation of the staff gtidance centained in Appendix A to iTP APCSB 9.5.1 and the technical equiremerts get forth in Appendix R to 10 CFR 60 define the essential elements of an acceptable tire protection
{rograa at nuclear power plants for dtmcnstration of compliance with 3.GWCtiv The objective of this tUsk order Is to obtain technical assistance In the field of fire protection engintering and posttf ire safe shutdown for KRC Region IV to assist an NRC Inspection teom in the performance of an inspection of post-efir safety Shutdown capability at Wolf Creek Wenerating Station MCCGS).
K eC.
I enCr ri The work specified In this statement of work (SOW) applies to Section C,.2.1 for the basic contract's SOW.
The contractor shall provide ote qualified fire protection specialist, one qualified post.fire safe stutdown s;eciallst, end the icestary facilities, Mterids. and services to assist the NRC staff in the perforwhce of an 1spectilon of the liceftsn's post-tfir tafe shutdown capability for MUS.
I' M
I PI 1, qp=
I KWT
I d
a
- t.
- I i ui,
I Li A I
-n 11 I.
.s
.I The contractor specialists will par-ticipate as a rmeber of the KRC
'inspection team during th subitt inspe tion During the inspection the contractor specia 1Ists will be under the direction of the HRC Tear' Leader named herein.
During the inspectior, the contractor sp@calists shall assist in the NRC Inspection team in its Inspectin of the applicant D
fire protection rograt' for conformance with the staff g9irnce contained in TP CHEB 9.5-1 or the con'natbi&
n of the guidance contained in Appendix A to STP APCSB 9.5.1 and Appendix R to 10 :FR 609 and the generic letters identified In Section J of this SOM.
The technical bases for the Inspection will be the aforementioned guidance documents and the Safety Evaluation Report (S£R) and Its supplements for the plant.
D. Reporting Requirrm nts
- 1. Monthly progress reports Issueid in accordance with the requiretmerts of the basic contract.
- 2. Dally verbal reports to the KRC Teta Leader during the subject inspection In a format to be provided by the Team Leader.
- 3. A draft and final inspection ireport Input that documents the contractor's Inspection activities, efforts, and findings. This I
report Ohll be In a format to be provided by the NRC team leader.
Ihe orlignal and one copy of this report thall be delivered to the NRC Prolect Manager.
Copies fD the report shall be delivered to both the NRC Team Leader and the NRC contract administrator.
ettinis and Travel The following etSings and trWMul are anticipated:
ne, two-person, five day trip to the Welf Creak Generating Station site (located near turlington, Kansas) to participate in the subject inspection.
All travel arrangements shall be eoordirated with the KRC Team eader.
F.
Istimalld ttvel of Lffort The estimated level of effort Is 1!00 professional staff hours The periM of pierfoance shall b;g n.
DOOjrand shall eovtiinu through Septeter 30, We e
_V1.J
I.
--.r'J,,';:"
1 '
N. Schedule Inspection Sche A handwritten d the NRC Team L exit eetting wI The f4,na1 4uina
.6.101o":
'XIitt Aj. I VDN WOU.d 9.
bdule: Ply 21-25. 2990.
raft. of the inspectlon rerort input shall be provided to ader at the conclusion of the inspection (prior to the th the licensee).
ction report Input shall te delivered in accordance with this SOW no lateir t~an 10 working days after completion of I
iI i
I 6tionD.2oa the Inspection, I.
Applicable Special Provisions The work specified In this SOW Is licensee fee recoverable. Fee recovery information shall be provided In the monthly progress reports In accordance with the requirmnun of the basic contract.
I It 1s the responsibility of the contractor to assign technical staff, etployees, sutcontractors, or consultants who have the rqurrtd educational background experience, or conb1ination thereof to meet both the technical and regulatory objectives of the work specified in this SOW. The RRC will nely an reprosentations made by the contractor concerning the qualifications air the ptrsonnel assigned to this task order Including assurance that oll Information contained in the technical and cost proposals, including rosumes, is accurate and truthful.
- 0.
C furnished Plateri
- 1. NUMEC4800, -Standard Reolow Plan,, Section 9.B.l, Branch Technical Position CMtl 96.21
- 2. Appendix A to UP APCSS 9,91i, *Guidelines for Fire Protection for Nuclear Fower Plants DockeWd Prior to July, 1i76'
- 3. generic Lotter 86-10, WI nleuntation of fire Protectlon RequiretwntsoO dated Apr11 14. loot
- 4.
Generic Letter 833, *3RC.
Posittons on Certain Reuirmsents of Appeix R to 30 CFA 10,' dated October 19, 198)
- 5.
Generic Letter 51.12, *Firi Protection Rule,' dated February 20, 1181 II