E-mail from A. Blough of USNRC to DRP All - Nuclear Safety Professionals, Regarding Good Coordination with DRS
ML060680448
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 02/24/2004
From: Blough A
NRC Region 1
To:
Division Reactor Projects I
References
FOIA/PA-2005-0194
Download: ML060680448 (1)


Text

lDtniel Orr - good coordination with DRS Page 1 From:

A. Randolph Blough ' e To:

DRP All -- Nuclear safety Professionals Date:

2/24/04 7:33AM

Subject:

good coordination with DRS The Salem and Hope Creek resident staff recently worked closely with DRS in evaluating simulator fidelity issues. This is an example of good teamwork to identify and characterize important training issues.

See excerpts of emails below.

John Caruso wrote:

"I want to thank the resident staffs at both Salem and HC for raising potential simulator fidelity issues for our review. Keep those issues coming, we will be inspecting HC simulator again later this year as part of our routine baseline biennial requal program inspection...

"If you haven't emphasized it already with the resident staffs, it might be worth mentioning that any potential negative simulator training post event issues identified at the sites (i.e., the simulator modeling didn't replicate the plant performance) should be fed into either Rich Conte or (John Caruso) for possible follow-up during our operator requal program bier nial inspections, if not before. Thanks."

Randy writes:

Of course, the same type of teamwork will also work well in other technical areas, too."

regards, randy CC:

cjbl; hjml; John Caruso; Jtw-I; Richard Conte; rvc; wdl