FPL Energy Seabrook Letter, Ref: Single Largest Contingency Protocol
ML060660370
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 02/23/2006
From: Davidson F
Florida Power & Light Energy Seabrook
To: Lynch M, Vanwelie G
ISO New England Inc, New York Independent System Operator, Office of Nuclear Reactor Regulation
References
Download: ML060660370 (4)


Text

r t.

An FPL Group Company February 23,2006 Mark S. Lynch President and Chief Executive Officer New York Tndepmdect Systez Operator 3890 Caniian Road Schenectady, New York 12303 Gordon van Welie President and Chief Executive Officer IS0 New England Inc.

One Sullivan Road Holyoke, MA 01 040-2841 RE: Single Largest Contingency Protocol

Dear Mr. Lynch and Mr. van Welie:

On six separate occasionsover the past five months, and five times during this month alone, IS0 New England (ISO-NE) Operations has required FPL Energys (FPLE) Seabrook nuclear unit in New Hampshire to downpower from full operating output to a maximum of 1200 MW for brief periods of time ostensibly in response to reliability concerns identified by the New York IS0 (NYISO) on its system.

Specifically, it is our understanding that in each of these incidents, NYISO Operations has -identified a reliabiliiy concern on its system, Iias contacted ISO-NE Operations a d requested that ISO-NE back down its single largest contingencies operating above 1200 MW to a maximum of 1200 MW. Both the NYISO and ISO-NE have advised us that these actions stem from a reliability-based protocol (Single Largest Contingency). We also understand this protocol was drafted in 1984, in letter agreement form, between the two power pools to preserve system stability and reliability. Additionally, we have been advised that this document was not filed with any other regulatory agency at the time it was implemented.

Since May 2005, when Seabrooks uprate was completed and the unit began operating above 1200 MW, we have attempted without success to work with ISO-NE and October 19, 2005 at 18:39; February 5,2006 at 17:34; February 18,2006 at 20:19, February 21 at 08:lO; and February 2 1 at 1 1 : 10; February 22 at 06: 10 PO Box 14000 - Juno Beach, Florida 33408-0420 - (561)691-7171 Fax: (561) 691-7177

the NYISO to determine the source of the Single Largest Contingency protocol, obtain and rclriew the actual operating procedure, obtain information regarding conditions within the New York Control Area that would help us understand the reasons for invoking the downpowering procedure, and, ultimately, determine alternative options to prevent the operational and financial impacts to Seabrook. We have had numerous telephonic and electronic communications with both the NYISO and ISO-NE, and yet the NYISOs responses have been particularly disappointing and, at times, unresponsive. As you know, members of our Senior Management and Regulatory teams met with NYISO and its Senior Operations group on December 14, 2005 in an attempt to better understand the operational and reliability issues surrounding this protocol. We have also had several meetings with ISO-NES senior operations management. Yet, we are no further along in understanding the source of the protocol, how it is implemented, and the system conditions that have resulted in impacts to Seabrook.

From the limited information provided to date by the NYISO and obtained from other sources, FPL Energy is concerned that a protocol which was developed to address transmission system reliability during the days of fully regulated, integrated electric service is subject to misuse in todays market-based paradigm.

Specifically, and admittedly without the benefit of full information and knowledge from the NYISO and ISO-NE on how this protocol is implemented, it is our concern that the NYISO is reacting to identified system constraints within the New York Control Area - at a time when facilities larger than 1200 MW are operating on the New England system - and is resolving those constraints first by backing down those facilities to the 1200 MW limit contained in the protocol, rather than resolving those constraints by taking action (like redispatch) on the New York system, as provided for in the NYISO Tariff. In short, it is our concern that the NYISO is identifying a potential reliability concern and responding by first selecting a solution that shifts costs to the New England system, its generation owners (in this case, FPL Energy) and its customers, rather than resolving the concern through actions internal to the New York Control Area.

During an informational conversation with a NYISO official, it was suggested that this is, in fact, an appropriate operational response. We note, however, that given the limited information that FPL Energy has received to date, we do not have written support for this supposition or a formal understanding for how this protocol is intended to be implemented.

Additionally, as it relates specifically to the Seabrook nuclear unit, these actions can create reliability impacts of their own to Seabrook and the New England system. The incidents in question have been of very short duration, calling for the unit to quickly ramp down and, typically within a period of under an hour, to ramp back up to full output. As you know, rapid ramping of nuclear units and their equipment can have operational impacts including premature maintenance, and threaten the units availability to perform at full rated output. Additionally, Seabrook performs an on-line maintenance protocol.

The planning for this maintenance assumes steady state operations when evaluating appropriate safety and procedural measures to perform such maintenance. Deviation from this assumption caused by downpowering initiates real-time changes to procedures within the operating environment which is less than optimal from a maintenance planning perspective.

2

Given the protocols adverse effects on resources in New England, it is appropriate to re-evaluate its effectiveness and whether it is being applied in a manner consistent with its original intent. In particular, FPLE can not understand how the benefits to New York of reducing the output of a nuclear unit by less than 70 MW are commensurate with the risk it poses to Seabrook or New England.

FPL Energy has requested a second meeting with the NYISO, including ISO-NE, to gain a better understanding of how this protocol is invoked and operates so that we can co1l~~hn:~~tively pursue options that ensure reliability while limiting the effect of this protocol on New England generators participating in a competitive market.

We appreciate that a collaborative session has been scheduled for March 29, 2006 in Albany.

For that session to be useful, we believe that - at a minimum - the following questions need to be answered and infomation provided:

1. Description and explanation of the transmission problems in the NY system that resulted in the 1200 MW limitation for the loss of the largest source in New England. A detailed explanation of what occurred during each downpowering event as identified in footnote #1 would be essential for a constructive meeting.
2. Source of the Single Largest Contingency protocol and any appropriate operating agreements or documentation describing its implementation. We have repeatedly requested that this information be provided by either or both ISOs, and we still await an appropriate response.
3. Is the original intent of the protocol still applicable in todays market environment?
4. Is there a market-based solution to the current protocol?

Again, FPL Energy is concerned that the implementation and application of this protocol is not appropriate in todays market-based paradigm. We certainly do not profess to have all the answers, as much of the information and history related to the Single Largest Contingency protocol is unavailable to us. We have appealed to the h1ISO and ISG-NE for assistance, arid hops that the meeting of March 2gth, which includes both the NYISO and ISO-NE, will put us on the path to better understanding how the protocol is applied, whether it is applied appropriately, and, if so, whether specific, market-based alternatives can be identified to reconcile operational, financial and reliability impacts on all parties.

Sincerely, n

F. Mitchell Davidson Senior Vice President 3

cc:

Dan Larcamp - Chief of Staff, FERC Shelton Cannon - Director, Office of Energy Markets and Reliability, FERC Anna V. Cochrane - Director, Division of Tariffs and Market Development -

East, FERC Sam Collins - Regional Administrator - U.S. NRC Stephen G. Whitley - SVP & COO - IS0 New England Michael C. Calimano - Vice President of Operations and Reliability - NYISO 4