ML060650119
| ML060650119 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 03/07/2006 |
| From: | Wang A Plant Licensing Branch III-2 |
| To: | Terao D Plant Licensing Branch III-2 |
| Wang A | |
| References | |
| Download: ML060650119 (4) | |
Text
March 7, 2006 MEMORANDUM TO: Dave Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Alan B. Wang, Project Manager /RA/
Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH PACIFIC GAS AND ELECTRIC (PG&E) COMPANY DATE & TIME:
Thursday, March 16, 2006 8:30 a.m. - 12:00 noon LOCATION:
U.S. Nuclear Regulatory Commission (NRC)
Two White Flint North 11545 Rockville Pike, Room T-9A1 Rockville, Maryland 20852 PURPOSE:
To discuss the digital upgrade project for the Diablo Canyon Power Plant (see attached agenda).
CATEGORY: *This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Proprietary information will be discussed at certain times during this meeting. These portions of the meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)
NRC PG&E Others A. Howe D. Jacobs J. Hefler M. Chiramal T. Grozan T. Quinn J. Bongara S. Patterson P. Morris A. Wang, et al.
J. Mauck C. Scott Docket Nos. 50-275 and 50-323
Enclosure:
Agenda (ADAMS Accession No. ML060650119) cc w/encl: See next page MEETING CONTACT: Alan B. Wang, NRR 301-415-1445 abw@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings," (67 FR 36920), May 28, 2002
ML060650119) cc w/encl: See next page MEETING CONTACT: Alan B. Wang, NRR 301-415-1445 abw@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings," (67 FR 36920), May 28, 2002 DISTRIBUTION:
Public RidsNrrPMAWang AHowe MChiramal LPL2-1 r/f RidsNrrLALFeizollahi RidsRgn4MailCenter (BJones)RidsOgcMailCenter RidsNrrAdro (BBoger)
RidsNrrAdro (CDorsey)
EDO RIV RidsAcrsAcnwMailCenter RidsNrrDorl (CHaney/CHolden)
JBongara Receptionist (OWFN and TWFN) (Hard Copy)
RidsNrrDorlLplg (DTerao)
RidsOpaMail RJasinski PMNS Accession Number: ML060650119 NRC-001 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME AWang LFeizollahi DTerao DATE
MEETING TO DISCUSS PACIFIC GAS & ELECTRIC MEETING ON THE DIGITAL UPGRADE PROJECT MARCH 16, 2006 08:30AM - 11:30AM Introduction (5 min)
Instrumentation and Control System Obsolescence (analog and digital equipment) (20 min)
Diablo Canyon Power Plant (DCPP) Long-Term Plan (30 min)
Schedule for Replacement of Reactor Protection and Process Control Systems (10 min)
Project Scope and Architecture (30 min)
Diversity and Defense-in-depth Analysis - Preliminary Results Closed (30 min)
NRC Feedback on Approach (30 min)
Closing Remarks (5 min)
Attendees:
Donna Jacobs DCPP VP of Nuclear Services Tom Grozan DCPP Regulatory Services Scott Patterson DCPP Project Manager for I&C Systems John Hefler Altran Solutions Consultant Ted Quinn Altran Solutions Consultant Pete Morris Westinghouse Jerry Mauck Westinghouse Consultant Clayton Scott Invensys/Triconex Consultant
February 2006 Diablo Canyon Power Plant, Units 1 and 2 cc:
NRC Resident Inspector Diablo Canyon Power Plant c/o U.S. Nuclear Regulatory Commission P.O. Box 369 Avila Beach, CA 93424 Sierra Club San Lucia Chapter ATTN: Andrew Christie P.O. Box 15755 San Luis Obispo, CA 93406 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, CA 93408 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, CA 94102 Diablo Canyon Independent Safety Committee ATTN: Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Pacific Gas & Electric Company P.O. Box 7442 San Francisco, CA 94120 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112 Mr. Ed Bailey, Chief Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414 Mr. James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)
Sacramento, CA 95814 Mr. James R. Becker, Vice President Diablo Canyon Operations and Station Director Diablo Canyon Power Plant P.O. Box 3 Avila Beach, CA 93424 Jennifer Tang Field Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 94111 Mr. John S. Keenan Senior Vice President - Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 770000, Mail Code B32 San Francisco, CA 94177-0001